ADVFN Logo

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

TEG Ten Entertainment Group Plc

411.00
0.00 (0.00%)
28 Mar 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Ten Entertainment Group Plc LSE:TEG London Ordinary Share GB00BF020D33 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 411.00 - 0.00 00:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Ten Entertainment Share Discussion Threads

Showing 2151 to 2170 of 2725 messages
Chat Pages: Latest  97  96  95  94  93  92  91  90  89  88  87  86  Older
DateSubjectAuthorDiscuss
07/11/2013
07:34
Nice reminder of the composting side of TEG, doing good for the environment






Uploaded on Sep 29, 2009
A BBC News Channel item on TEG Environmental.

Follows the process of recycling food waste into high grade

giant steps
05/11/2013
09:55
well go back there then. I'm happy to stick with TEG, whom I regard as a trustworthy outfit.
spaceparallax
04/11/2013
21:41
CCE

has all that in spades

stockologist
04/11/2013
14:46
Thanks again GS - great to read of the progress and particularly gratifying to know that we're a viable business approaching profitability whilst offering real value to society and the environment. There won't be many companies who can claim that.
spaceparallax
04/11/2013
13:28
23rd October 2013



Page 3

"TEG is preparing to open their In-Vessel Composting and Anaerobic Digestion facility on Plot 7A, which relies on the new infrastructure and vehicular access provided"

giant steps
04/11/2013
12:42
See Page 37

"TEG Group PLC has been identified as a possible AD partner for ACP"

giant steps
04/11/2013
12:09
great news.
spaceparallax
04/11/2013
08:17
" The first anaerobic digestion (AD) plant within the M25 was completed in late 2013 by TEG Group."
giant steps
02/11/2013
19:26
Reminders




23rd October 2013


Observe
"A more strategic objective is to develop a local heat network. At the local level
this involves helping TEG to evaluate the feasibility of supplying waste heat to a
neighbouring business, Closed Loop Recycling.
"




Note :
TEG making objections to another potential neighbouring project








Hope the council give time to TEG for their comments,
but guess they want to encourage competition.

giant steps
31/10/2013
09:13
Sp, it dispels the myth that stockologist was promoting

"Also very dependent on their own technology rather than a tech neutral Infrastructure player like say CCE"



Excellent to see TEG partner with UTS, london project sure to be a flagship

giant steps
31/10/2013
09:09
Thanks GS, I hadn't seen that - sounds perfect for small communities
spaceparallax
31/10/2013
07:53
Reminder about TEG in partnership with UTS on flagship project

8th October 2013

giant steps
30/10/2013
16:19
Thanks yump, good to hear from someone with experience on these matters
giant steps
30/10/2013
15:45
Hmmm, a deliberately myopic view methinks
spaceparallax
30/10/2013
14:53
Sounds like a liability to me.

"TEG is to carry out a programme of work to rectify these issues and the scope of works is currently being defined."

stockologist
30/10/2013
14:51
Reminder from 30th Sept 2013

"
Greater Manchester Waste PFI Contract

Construction of the fourth and final facility (Bolton) is complete and commissioning of the facility is in progress. A small delay was encountered due to a defect in a sub-contractor's works, which has been rectified, and Construction Completion has been achieved. TEG expects to fully recover all expenditure from the sub-contractor.

All three of the operating facilities have passed their 52-week availability tests. Acceptance has not been achieved, however, due to the requirement for rectification works to the buildings and some services. TEG is to carry out a programme of work to rectify these issues and the scope of works is currently being defined. The Group has been advised that the majority of these works are covered by PI insurance and does not anticipate significant impact on the business plan. However, the retentions of approximately £2.4m will not be released until such time as projects are completed and the Group is therefore expecting a further delay in cashflow.

The contract works are expected to close in the final quarter of 2014, when the 52-week defect liability period for the Bolton plant expires. It is intended that all remedial works will have been completed before that time
"

giant steps
30/10/2013
14:22
Exactly sp, that's retention
giant steps
30/10/2013
14:18
My understanding of the Manchester PFI situation is more that we're battling to get fully paid rather than being exposed to 'significant liabilities'.
spaceparallax
30/10/2013
13:47
Dagenham project gives them a great flagship profile for UK

Plenty of diverse sites, and no nasty contingent liabilities like CCE

Perhaps news due will kick start the share price.

giant steps
30/10/2013
13:38
They got into a lot of trouble with the Manchester PFI contract and still significant liabilities to meet under that as I understand

Also very dependent on their own technology rather than a tech neutral Infrastructure player like say CCE

stockologist
Chat Pages: Latest  97  96  95  94  93  92  91  90  89  88  87  86  Older

Your Recent History

Delayed Upgrade Clock