ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

SHFT Shaft Sink

0.625
0.00 (0.00%)
19 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Shaft Sink LSE:SHFT London Ordinary Share IM00B690ZP24 ORD NPV
  Price Change % Change Share Price Shares Traded Last Trade
  0.00 0.00% 0.625 0.00 01:00:00
Bid Price Offer Price High Price Low Price Open Price
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
  -
Last Trade Time Trade Type Trade Size Trade Price Currency
- O 0 0.625 GBX

Shaft Sink (SHFT) Latest News

Real-Time news about Shaft Sink (London Stock Exchange): 0 recent articles

Shaft Sink (SHFT) Discussions and Chat

Shaft Sink Forums and Chat

Date Time Title Posts
03/9/201620:06Mining Services Companies: 'Picks & Shovels' Plays125
03/9/201619:15SHFT2,806
12/7/201406:18The SightPower Shaft Scanning Technology: a Sight for SHFT Eyes20
10/7/201418:03SHAFT SINKERS The thread for debate not bile.280
20/5/201415:23*** Shaft Sinkers ***67

Add a New Thread

Shaft Sink (SHFT) Most Recent Trades

No Trades
Trade Time Trade Price Trade Size Trade Value Trade Type

Shaft Sink (SHFT) Top Chat Posts

Top Posts
Posted at 03/9/2016 19:15 by hedgehog 100
I wonder why Muckshifter didn't post this in January, considering how closely he has been following this case ...

"Shaft Sinkers and EuroChem agree to settle dispute

BY ALLAN SECCOMBE, 21 JANUARY 2016, 06:05

SHAFT Sinkers, once a leading provider of shaft-sinking services to the mining industry, has reached an "amicable" settlement with EuroChem, which was pursuing the company for $917m in a dispute relating to a Russian potash mine.

Citing conditions in the agreement, Shaft Sinkers acting CEO and chairman Marius Heyns said on Wednesday he could not offer any additional comment to a statement from EuroChem on the resolution.

"EuroChem, Shaft Sinkers, Rossal No126 and International Mineral Resources announce that they have amicably resolved all matters relating to their dispute involving EuroChem’s potash mining project in Russia, and all litigation and arbitration associated therewith has been dismissed or withdrawn," EuroChem said on Monday.

The arbitration, which cost Shaft Sinkers more than £10m and nearly destroyed the company, was one of the major factors that led to its South African division being put into business rescue and the termination of its listing in London.

Impala Platinum and Royal Bafokeng Platinum cancelled large shaft-sinking contracts with Shaft Sinkers, which slashed staff and sold assets as its difficulties mounted.

EuroChem alleged Shaft Sinkers’ grouting technology had failed in the sinking of the shaft at its Gremyachinskoe potash deposit, forcing a suspension of the project.

EuroChem, Russia’s largest mineral fertiliser company, launched a claim with the Swiss Chambers of Commerce in Zurich and the International Chamber of Commerce in Paris against the South African arm of London-listed Shaft Sinkers in 2012, seeking compensation for lost profits and to recoup costs.

Shaft Sinkers denied the allegations. The claims were ringfenced in the South African subsidiary, which was placed under business rescue.

Mr Heyns outlined last year his vision for restoring Shaft Sinkers’ fortunes.

The company still has contracts in the Democratic Republic of Congo, India and Kazakhstan, as well as other divisions unaffected by the EuroChem matter."




In summary:

My position was that Eurochem's SUBSTANTIVE claim against SHFT - for about a billion dollars (the precise amount changed over time) - was unjustified.

But that a far lower amount might be.

Muckshifter in contrast insisted that the full amount was justified, and that they would pursue it all the way.

So what happened?

Well, the arbitration disallowed the vast majority of EuroChem's claim, and shortly afterwards the parties settled voluntarily.
Posted at 02/6/2016 16:27 by hedgehog 100
CAPD is experiencing slightly improved trading conditions this year, which at 35.25p is reflected in its strong share price performance over the last few months.


18/05/2016 07:00 UKREG Capital Drilling Limited Q1 Trading Update

"Capital Drilling Limited (CAPD:LN), the emerging and developing markets focused drilling company, today provides its trading update for the period 1 January to 17 May 2016. …

Financial Highlights

-- Payment of final dividend (US2.5cps) for 2015 financial year on May 6, 2016
-- Stable revenue over the traditionally weak 1st quarter, with revenue increasing into Q2 following the commencement of new short term exploration contracts
-- Positive cash flow from operational activities maintained; Capital Drilling remains focussed on strict cost management and ongoing capital discipline, generating solid cash flows and a strong balance sheet

Trading Update and Outlook

Capital Drilling generated revenue of $19.1 million during 1Q 2016, which represents an increase of 1.1% on the previous period (4Q 2015 $18.9 million). The result reflects the continued stabilization of the Company's revenue with the Company's core production contracts contributing over 80% of Group revenue in Q1. The Group saw a slight increase in utilisation over the quarter, reflecting increased activity at the North Mara Gold Mine and new exploration contracts that commenced late in the quarter. ARORP was however marginally softer, primarily due to rigs commencing drilling in late March, therefore generating a marginal revenue contribution for the period, in addition to single shift drilling on a number of exploration programs.

Of particular encouragement was the award of multiple exploration contracts during the period, indicating early signs of a measured industry recovery. It is also important to note that the Company was awarded the majority of the exploration contracts it tendered for. This significant achievement can largely be attributed to its Lean Operating Model ("the Model"), which was implemented in 2015. The Model enables Capital Drilling to provide competitive drilling programs on smaller site footprints and the Company has received positive client feedback relating to projects in Botswana, Egypt, Peru and Tanzania.

A further operational achievement for the period includes Capital's mobilization of three new blast hole rigs for Acacia Mining's North Mara contract. This contract extends the Company's services at the site, where it was previously providing grade control drilling services only. The two-plus-two year contract with Acacia Mining was announced to the market on 14 December 2015 and increased the total rigs on site to 5.

Recent increases in the gold price along with increased capital markets activity in the mining sector give the Group an encouraging outlook. The early signs of recovery in the sector, albeit measured, together with the award of new exploration contracts, reinforce Capital's position for revenue and earnings growth during the balance of 2016 and beyond. The Group continues to benefit from a strong balance sheet and solid cash generation, providing the platform for growth.

Commenting on the trading update, Mark Parsons, Chief Executive Officer, said:

"While the market continues to be subdued, the small signs of improvement in the tendering markets are encouraging, as is the recent uplift in capital markets activity in the resources sector. While we currently expect trading to remain in line with expectations for the remainder of the year, we are in a strong position to take advantage of opportunities as conditions improve.

The large majority of our revenue is secured with long-term contracts, many of which are expected to operate beyond their forecast completion. Our low cost operating model also attracted several new contracts during Q1, supporting our growth strategy.

For the balance of the year we will continue to: pursue growth in emerging markets; enhance our ability to offer additional drilling services; and execute strategic partnerships. I am confident we have established a solid platform for future growth, despite the challenges the industry continues to face." …"
Posted at 03/12/2015 13:07 by muckshifter
Another thought, from the information about the arbitration result, is that the flotation of shft might just have been hurried after events at Volgakaly. The BASF report of May 2008 indicating that some of the known bad ground was impenetrable to the intended grout, was finally delivered to the Head of Mine Construction at Eurochem, the man who “took the shft/IMR shilling”, in October 2010, less than three months before shft’s flotation but before the flotation was announced I believe. He apparently put it into a set of files containing more than a million pages, without drawing it to the attention of his bosses. But presumably, it became inevitable at that point that the report would eventually surface, because by then all sorts of other problems were surfacing, with likely serious contractual consequences.

The owners of IMR, which was a 48% shareholder in shft after flotation – 54% before, have never imho shown the slightest regard for the laws of any country or any stockmarket regulations as far as I can see, so they may well have found a way to short sell their shareholding while the shares were flying high shortly after flotation without revealing it. Put it this way, I doubt if they suffered any loss from their purchase of shft.
Regards.
Posted at 02/12/2015 18:08 by muckshifter
So the legal chess goes on then. My take on the New York action by IMR is that it’s a further attempt to limit the use of evidence from the arbitration in the Dutch Eurochem / IMR trial. Shft (and one thing I found quite surprising was the use of the terms “parent company” and “subsidiary221; when refering to the relationship between IMR and shft during the arbitration) tried at least four times during the arbitration to persuade the arbitration panel to restrict the use of evidence from the arbitration in the Dutch case, police investigations, and other unspecified court actions Eurochem said they intended to take. It was never made clear whether or not the very late Eurochem witness statements, particularly those made by Hall, submitted in June 2015, were considered by the tribunal, but if they were not included in the tribunal’s considerations presumably they are freely available for the Dutch trial, but the evidence in the arbitration seemed overwhelming anyway.

The other thing which came across strongly was that the arbitration panel was clearly keen to avoid actions which could possibly conflict with the interests of other judicial authorities. If that is the normal protocol in terms of possible conflict between different court actions, I suspect that IMR are making another attempt to keep evidence provided at the arbitration out of the Dutch action by taking advantage of that protocol.

In terms of the allegations of hacking etc. I would think there probably was quite a bit of hacking going on. Both shft and Eurochem accused each other of this sort of espionage, but the tribunal panel didn’t seem to attribute much importance to it, or the allegations of frequent attempts by people working for shft / IMR to intimidate the original shft project manager from the Volgakaly job, who had become a witness for Eurochem. The thing which astonishes me in that story is the pretence about leaks to the press. There were very regular bits of spin given to the press by IMR / Shft, clearly pushing their defence arguments, whereas the Eurochem side normally refused comment.

Note also, the proliferation of “weasel words” after the first paragraph of the report. For example “Melnichenko, the lawsuit continues, "has personally, and through companies he owns, been associated with a number of allegedly improper and illegal activities throughout the world," including bribery allegations against executives at a chemical company where Melnichenko sat on the board of directors, and money laundering charges against a bank he founded” really doesn’t mean very much does it.

PS. 2/1/16. On November 17-18, 2015, the U.S. District Court for the District of Columbia issued a series of decisions rejecting all allegations that the consulting expert hired by EuroChem-VolgaKaliy had engaged in unlawful information-gathering activity.
Posted at 02/12/2015 18:05 by muckshifter
So the legal chess goes on then. My take on the New York action by IMR is that it’s a further attempt to limit the use of evidence from the arbitration in the Dutch Eurochem / IMR trial. Shft (and one thing I found quite surprising was the use of the terms “parent company” and “subsidiary221; when refering to the relationship between IMR and shft during the arbitration) tried at least four times during the arbitration to persuade the arbitration panel to restrict the use of evidence from the arbitration in the Dutch case, police investigations, and other unspecified court actions Eurochem said they intended to take. It was never made clear whether or not the very late Eurochem witness statements, particularly those made by Hall, submitted in June 2015, were considered by the tribunal, but if they were not included in the tribunal’s considerations presumably they are freely available for the Dutch trial, but the evidence in the arbitration seemed overwhelming anyway.

The other thing which came across strongly was that the arbitration panel was clearly keen to avoid actions which could possibly conflict with the interests of other judicial authorities. If that is the normal protocol in terms of possible conflict between different court actions, I suspect that IMR are making another attempt to keep evidence provided at the arbitration out of the Dutch action by taking advantage of that protocol.

In terms of the allegations of hacking etc. I would think there probably was quite a bit of hacking going on. Both shft and Eurochem accused each other of this sort of espionage, but the tribunal panel didn’t seem to attribute much importance to it, or the allegations of frequent attempts by people working for shft / IMR to intimidate the original shft project manager from the Volgakaly job, who had become a witness for Eurochem. The thing which astonishes me in that story is the pretence about leaks to the press. There were very regular bits of spin given to the press by IMR / Shft, clearly pushing their defence arguments, whereas the Eurochem side normally refused comment.

Note also, the proliferation of “weasel words” after the first paragraph of the report. For example “Melnichenko, the lawsuit continues, "has personally, and through companies he owns, been associated with a number of allegedly improper and illegal activities throughout the world," including bribery allegations against executives at a chemical company where Melnichenko sat on the board of directors, and money laundering charges against a bank he founded” really doesn’t mean very much does it.
Posted at 30/11/2015 12:04 by muckshifter
The person “taking the shft/IMR shilling” was the Eurochem Head of Mine Construction, who seems to have had, in effect, powers similar to “The Engineer” in an ICE contract. This means that he had the power to approve, or withold, approval of sub contractors, thereby preventing or allowing them to be appointed, with similar powers in relation to changes to the programme, methods, senior contractors personnel, etc. It also meant that he signed off the monthly payment certificates for the contractors, and he may well have had powers to give contract time extensions, although a major extension would surely cause questions from above. Clearly he was exactly the right man from the shft /IMR perspective in terms of his powers on Volgakaly, which left the shft /IMR attempted justification of “the arrangement” on the basis that he would be useful in their efforts to expand within the old soviet territories, looking very lame.

He seems to have been involved in many of the numerous scams mentioned, but one interesting point was the allegation that he deliberately obstructed Thyssen in their work on the skip shaft, by refusing to approve their subcontractors, etc., while writing emails to his “friend” at shft suggesting that shft should soon have the skip shaft contract, to add to their cage shaft. That might be thought of as an each way bet by him, as one of the ways used to induce a bribe offer, in my experience, is to be deliberately and clearly obstructive with whatever power you wield. By the time the Thyssen contract was prematurely terminated at the end of 2009, perhaps as a result of his efforts, I believe shft were struggling and unable to take advantage of their “lucky opportunity”. In the end Thyssen had to be brought back to sort out both shafts of course.
Regards.
Posted at 27/11/2015 09:48 by muckshifter
Now that the issues between Eurochem and shft are just about over, I’m going to post a few, hopefully interesting points about the dispute, for those who were either shareholders, or managed to avoid losses here, despite the relentless pushing of the shares by Hedgehog.

Firstly though, it might be worth revisiting the big picture at the time of shft’s flotation. I only read the prospectus after getting drawn into arguements about shft a couple of years after flotation, but the big picture I gained from reading it, which I would have gained after careful reading if I had been thinking of buying at flotation was:-
• Shft spent most of its 35 year history under the wing of a big company, It then was sold and operated for a few years as an independent, not very successfully it seems, as it was then bought for a song by IMF.
• IMF was a company owned by the same people who originally owned ENRC, and had a reputation, based on regular allegations of corruption, notorious enough to impress the mafia, imho.
• Two of the three executive directors of shft, at the time of the expansion and the negotiation / award of the jobs in India and Russia were actually employed by IMR.
• Shft’s turnover then increased almost five fold in less than three years.
• A very large chunk of the increase in turnover came from the award of the two very large overseas contracts, each of which looked bigger than anything that had been on shft’s books.
• There was no evidence in the prospectus of shft carrying out major international projects after leaving the security of being a subsidiary of a big mining conglomerate, which had operations all over the world, before the IMR purchase.
• The two major new international contracts were awarded in countries which score very badly in corruption studies.
• A working lifetime in major civil engineering meant that I knew that major civils projects are a high risk element of the construction industry; that such work undertaken overseas (in this case outside of shft’s home base in South Africa) carries even higher risks; and that the highest risk element of heavy civils contracting is underground works. But even for those who knew nothing about civils contracting, the clues were there in the prospectus. There were mentions of delays and negotiations to resolve them by achieving extensions of contract period, mentions of earlier disputes, and the description of shft’s opposition within the prospectus revealed that they had almost no independent specialised opposition – there is a reason for that – they don’t survive.

To compensate for these negative points, to be gleaned from careful reading of the prospectus, there was lots of positive spin about prospects and two years of good and growing turnover and profit, with indications of good dividends to come.

That big picture would have certainly put me off any thoughts of investing in the flotation, but I’m a long term investor not a short term trader. So, how did that big picture work out?

One of Hedgehog’s favourites was his contention, posted about fifty times after he attended the 2013 AGM, that “in the unlikely event” that shft lost the arbitration, they could simply bankrupt the contracted subsidiary, and the rest of Shaft Sinkers would continue unaffected. My contention in a couple of posts was that Eurochem are not stupid enough to have contracted with a subsidiary of this asset-less nature. In fact, SHFT were unable to perform this little trick and the whole group went bang, but the arbitration revealed some interesting information. Don’t forget, the date of Hedgehog’s “AGM report” in early June 2013.

The trickery employed by that “fine old company” as Hedgehog often called SHFT, and of course their majority shareholder at that time, the “excellent businessmen” as he often called them, from IMR/ENRC, in terms of the use of an asset-less subsidiary company to avoid risk to the parent company was interesting, to me anyway.
If you read the initial notification of the commencement of the arbitration process in both Eurochem and Shaft Sinker’s RNSs, both refer to Shaft Sinkers (Pty) Ltd being the company contracted to carry out the work, and therefore the company subjected to the dispute.

At some stage, Eurochem must have realised something was up, because they added Rossal into the claim as joint defendent with Shaft Sinkers (Pty) Ltd. In March 2013, SHFT asked the tribunal to give a preliminary ruling on whether or not the tribunal had jurisdiction over Rossal ie. they tried to get Rossal taken out of the arbitration. It turned out that SHFT had gone through the pre-tender qualification process and submission of offer etc. as Shaft Sinkers (Pty) Ltd, the long established “fine old company” which owned the company’s assets, and had even formed and agreed the original small “design” contract between this company and Eurochem VolgaKaliy (which is the subject of another arbitration, I believe – it started as an 11 month contract to be completed in 2008 and ended up still being performed in 2011), before changing the name of the original Rossal to Shaft Sinkers (Pty) Ltd, and vice versa, in secret, in time to sign up the main contract (and perhaps the one in India) using “new” asset-less Shaft Sinkers (Pty) Ltd. Needless to say this little ploy failed, and with that failure went all hope of bankrupting the subsidiary without significant effect.

This seems to have been typical of events at Eurochem, and shows what happens, imho, when “a fine old company” is run by “excellent businessmen” from IMR.
Regards.
Posted at 26/11/2015 09:16 by muckshifter
Now that the issues between Eurochem and shft are just about over, I’m going to post a few, hopefully interesting points about the dispute, for those who were either shareholders, or managed to avoid losses here, despite the relentless pushing of the shares by Hedgehog.

Firstly though, it might be worth revisiting the big picture at the time of shft’s flotation. I only read the prospectus after getting drawn into arguements about shft a couple of years after flotation, but the big picture I gained from reading it, which I would have gained after careful reading if I had been thinking of buying at flotation was:-
• Shft spent most of its 35 year history under the wing of a big company, It then was sold and operated for a few years as an independent, not very successfully it seems, as it was then bought for a song by IMR.
• IMF was a company owned by the same people who originally owned ENRC, and had a reputation, based on regular allegations of corruption, notorious enough to impress the mafia, imho.
• Two of the three executive directors of shft, at the time of the expansion and the negotiation / award of the jobs in India and Russia were actually employed by IMR.
• Shft’s turnover then increased almost five fold in less than three years after IMR bought them.
• A very large chunk of the increase in turnover came from the award of the two very large overseas contracts, each of which looked bigger than anything that had been on shft’s books.
• There was no evidence in the prospectus of shft carrying out major international projects after leaving the security of being a subsidiary of a big mining conglomerate, which had operations all over the world, before the IMR purchase.
• The two major new international contracts were awarded in countries which score very badly in corruption studies.
• A working lifetime in major civil engineering meant that I knew that major civils projects are a high risk element of the construction industry; that such work undertaken overseas (in this case outside of shft’s home base in South Africa) carries even higher risks; and that the highest risk element of heavy civils contracting is underground works. But even for those who knew nothing about civils contracting, the clues were there in the prospectus. There were mentions of delays and negotiations to resolve them by achieving extensions of contract period, mentions of earlier disputes, and the description of shft’s opposition within the prospectus revealed that they had almost no independent specialised opposition – there is a reason for that – they don’t survive.

To compensate for these negative points, to be gleaned from careful reading of the prospectus, there was lots of positive spin about prospects and two years of good and growing turnover and profit, with indications of good dividends to come.

That big picture would have certainly put me off any thoughts of investing in the flotation, but I’m a long term investor not a short term trader. So, how did that big picture work out?

One of Hedgehog’s favourites was his contention, posted about fifty times after he attended the 2013 AGM, that “in the unlikely event” that shft lost the arbitration, they could simply bankrupt the contracted subsidiary, and the rest of Shaft Sinkers would continue unaffected. My contention in a couple of posts was that Eurochem are not stupid enough to have contracted with a subsidiary of this asset-less nature. In fact, SHFT were unable to perform this little trick and the whole group went bang, but the arbitration revealed some interesting information. Don’t forget, the date of Hedgehog’s “AGM report” in early June 2013.

The trickery employed by that “fine old company” as Hedgehog often called SHFT, and of course their majority shareholder at that time, the “excellent businessmen” as he often called them, from IMR/ENRC, in terms of the use of an asset-less subsidiary company to avoid risk to the parent company was interesting, to me anyway.
If you read the initial notification of the commencement of the arbitration process in both Eurochem and Shaft Sinker’s RNSs, both refer to Shaft Sinkers (Pty) Ltd being the company contracted to carry out the work, and therefore the company subjected to the dispute.

At some stage, Eurochem must have realised something was up, because they added Rossal into the claim as joint defendent with Shaft Sinkers (Pty) Ltd. In March 2013, SHFT asked the tribunal to give a preliminary ruling on whether or not the tribunal had jurisdiction over Rossal ie. they tried to get Rossal taken out of the arbitration. It turned out that SHFT had gone through the pre-tender qualification process and submission of offer etc. as Shaft Sinkers (Pty) Ltd, the long established “fine old company” which owned the company’s assets, and had even formed and agreed the original small “design” contract between this company and Eurochem VolgaKaliy (which is the subject of another arbitration, I believe – it started as an 11 month contract to be completed in 2008 and ended up still being performed in 2011), before changing the name of the original Rossal to Shaft Sinkers (Pty) Ltd, and vice versa, in secret, in time to sign up the main contract (and perhaps the one in India) using “new” asset-less Shaft Sinkers (Pty) Ltd. Needless to say this little ploy failed, and with that failure went all hope of bankrupting the subsidiary without significant effect.

This seems to have been typical of events at Eurochem, and shows what happens, imho, when “a fine old company” is run by “excellent businessmen” from IMR.
Regards.
Posted at 14/9/2015 15:18 by muckshifter
RCTurner2,
Don't know if you remember all that nonsense he posted about the arbitrations and the IMR/Eurochem case, but many of the points I made, and Hedgehog evaded, look to have been vindicated by this:


Page 28 of the numbered document pages, under section 26 heading: legal proceedings:-

“In October 2012, the Group filed a claim against SHAFT SINKERS (PTY) LTD and ROSSAL 126 (PTY) LIMITED (formerly known as SHAFT SINKERS (PTY) LTD.), (“Shaft Sinkers”), the contractor involved in the construction of the mining shafts at the Gremyachinskoe potash deposit, seeking US$ 800 million compensation for the direct costs and substantial lost profits arising from the delay in commencing potash production, due to the inability of that construction company to fulfil its contractual obligations. Based upon the damages report provided by an independent expert, the amount of the claim was increased up to the US$ 1.06 billion which includes net wasted costs to the amount of US$ 248 million and lost profits in the amount of US$ 812 million.

In December 2012, Shaft Sinkers filed a counterclaim against the Group, seeking US$ 44 million without Russian VAT of 18% or US$ 52 million with VAT under the construction contract. In its counterclaim, Shaft Sinkers admits that it will give credit, in respect of any sums awarded to it, for a deduction of US$ 30.6 million in respect of advance payments made by the Group with the result that the maximum net claim from Shaft Sinkers is US$ 14 million. Management believes that this counterclaim is without merit.
The above disputes are subject to arbitration as specified in the contract.

In March 2013, the Group filed a claim against International Mineral Resources B.V. (“IMR”) which, the Group believes, held a controlling interest in Shaft Sinkers, claiming IMR is responsible for its subsidiary’s actions. In July 2013, the Dutch Court granted EuroChem definitive leave for levying the requested prejudgment attachments against IMR’s Dutch assets, while fixing the amount for which the leave is granted, including interest and cost at EUR 886 million. The court held an in-depth hearing on 21 January 2014 where it considered the arguments and witnesses of both sides. Following that hearing, the court rejected IMR’s request to suspend the case and stated that IMR would not be permitted to submit any additional evidence. On 25 June 2014, the Dutch court denied the Group’s claim against IMR and on 18 September 2014, the Group filed a writ supported by newly discovered additional evidence with the Dutch appeal court. In accordance with the procedure the Group submitted the grievances to the Dutch court on 17 March 2015. IMR has submitted their grievances at 23 June 2015. The date of hearing will be announced after 18 August 2015.”

The first paragraph above from page 28 section 26 verifies, imho, my contention of two years ago that the fundamental basis of the main arbitration claim against shft is probably “breach of contract” – failure to fulfil their contractual obligations.

It was always my contention that Eurochem knew that they couldn’t get any significant compensation from shft – simply put, under any of the approximately 20 civil engineering Conditions of Contract I’ve been involved with, the $248m direct cost incurred because of the failure to fulfil the contract would become payable by shft, and would bankrupt them. My view was that the arbitration referal was skewed to provide evidence against IMR, who effectively owned and ran shft at the time the contract with Eurochem was formed (they owned 54% and provided two of the three executive directors from their own organisation). I believe that Eurochem, by the time the shft failure to fulfil the contract became clear, and the information about the supressed report and the shft payments to a Eurochem employee were uncovered, were running out of time for taking court action against IMR. As a result, the court action against IMR occurred before Eurochem were able to have “discovery” through the arbitration procedures, and they lost the initial court battle. My contention, when that result was announced, was that this would not be the end of the case against IMR, and that Eurochem would be back in court after “discovery of documents” in the arbitration hearings – which is exactly what appears to be the case when the last three sentences of the above third paragraph extracted from the Eurochem report are considered.

In terms of the arbitration, although the outcome has not yet been publicly released, I would think that there was very little confidence that they could win in the shft camp, because if they were sure of a win, the banks, financiers and creditors would surely have been prepared to support them while waiting for the huge inflow of cash Hedgehog kept predicting that they would receive, “when they won the case”.

And the final adversarial opinion that is now clearly settled was Hedgehog’s prediction, made in about fifty posts, that shft could even lose the arbitration, bankrupt the relevant subsidiary, and carry on as normal, as opposed to my position that in my experience that never happens in the Civil Engineering industry – when a subsidiary goes bang, so does the parent company – which was what happened here.

Regards.
Posted at 13/7/2014 11:31 by muckshifter
Still as dishonest as ever then Hedgehog.
Post 2515.
How did I cost Iofina investors money by writing two posts, approx. six months apart, on an Iofina thread, one mildly positive (very, very mildly by comparison with almost every one of your hundreds of shft posts during the same period) and one which didn't even mention Iofina, it was about a poster who was deliberately annoying serious posters - bit like you really hedgehog. Explain that - or will you just change the subject as usual?

Where did I suggest that shft were imminently going bust? Another lie?

Where did I INSIST that shft were being run as a subsidiary of IMR? Another of your constant misrepresentations of my posts. I've always made the point very clearly that IMR owned 54% of shft at the time of negotiation and agreement of the Eurochem contract, and that the two executive directors who almost certainly carried out those negotiations on behalf of shft were actually employed by IMR at the time, meaning that, imho, each of the two companies would have been entirely aware of the actions of the other. Explain how the contract could have been awarded without them as IMR employees being involved.

I note that as usual you choose to reproduce the newspaper report which is more favourable to your view, rather than the Moscow times one which makes clear that the case between Eurochem and IMR is not over as far as Eurochem are concerned, and that Eurochem's spokesperson said that they have obtained important evidence subsequent to earlier submissions (which is what I suggested perhaps as much as a year ago would be the outcome of the arbitration).

Unlike you hedgehog, I don't try, and have no interest at all in "calling" day to day fluctuations in shft, or any other company's share price. And unlike you I do not try to influence a share price, that's why you write hundreds and hundreds of incredibly positive posts about any company you are invested in, and attack posters who do not agree with you. My points are "long term" and intended to inform long term investors of things they may well not know and need to consider – particularly when they are being mislead by a dishonest poster such as you, which is something I've demonstrably done for the last 14 years. On the other hand, how many times was it that you "called the bottom" with shft at much higher prices than the current one, must have been at least five times.

Post 2516.
That post is such poisonous pointless drivel that it's hardly worth replying to. But I notice you are trying to hint at one of your old favourites again in terms of dishonest representation of my past, after probably 20 to 30 previous attempts to pretend that I had some sort of work related motivation for posting negatively about shft, by this bit:
"Flooding the internet with such claims could have helped to undermine confidence in SHFT in the eyes of anyone reading them, helping to create a self-fulfilling prophecy (to the benefit of competitors etc.)"

Shows yet again, after it had being clearly demonstrated in post 2491 above, how dishonest your claim in post 2490 (and several others) was, ie.:
"I've in the past suggested/asked re. you perhaps work for a rival to SHFT, as a possibility, because I and others don't believe that someone will devote hundreds of hours to attacking a company that they say they have, and never will have, an investment interest in, for no good reason.

But since the time that you have explained that you're not a miner, I have never said that you do the same type of work as SHFT.

And as for this rubbish:
"Anyone who has lost money here, should see Muchshifter's blame in that ... and perhaps consider reporting him to the financial authorities."

I would repeat my response to your earlier "threat" to contact Helmer because in your opinion I was libellous
GET ON WITH IT
At least that way. the only people who will know what a fool you are, would be you and the recipient of your communication.

Post 2517.
Helmer's post contained minor errors – don't make me laugh. It was absolutely dishonest drivel, with at least seven serious "errors" in the core of his argument by a so called investigative journalist, every one of which contributed to his nonsense conclusion.

Still trying to wriggle out of your dishonest insinuations about my work, despite having clearly read back posts of mine on advfn, and coming up with a seven year old post of mine on TMF which clearly indicated that my work was motorways etc – what a twister you are.
And the point about googling "muckshifter" is that if you didn't know the difference between muckshifting and tunnelling / shaft sinking etc, muckshifter, or muckshifting are well known terms in the Civil Engineering industry and would have cleared your ignorance up in about five seconds, but despite being told many times that I was a muckshifter, not a miner / shaft sinker /etc, you prefered to continue with your dishonesty, and in fact are still trying to hint at a motivation based on a connection to mining.