ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

RPT Regal Petroleum Plc

15.325
0.00 (0.00%)
24 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Regal Petroleum Plc LSE:RPT London Ordinary Share GB0031775819 ORD 5P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 15.325 14.75 15.90 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Regal Petroleum PLC Ukraine Update (4351B)

04/04/2017 7:00am

UK Regulatory


Regal Petroleum (LSE:RPT)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Regal Petroleum Charts.

TIDMRPT

RNS Number : 4351B

Regal Petroleum PLC

04 April 2017

4 April 2017

Regal Petroleum plc

("Regal" or the "Company")

Ukraine Update

Regal Petroleum plc (AIM: RPT), the AIM-quoted oil and gas exploration and production group, announces an update of its operational activities at its Ukrainian gas and condensate fields, which comprise the Mekhediviska-Golotvshinska (MEX-GOL) and Svyrydivske (SV) fields, and the Vasyschevskoye (VAS) field, all of which are 100% owned and operated.

Average gas, condensate and LPG production from the MEX-GOL and SV fields for the period from 1 January 2017 to 31 March 2017 was 131,025 m(3) /d of gas, 33 m(3) /d of condensate and 17 m(3) /d of LPG (1,100 boepd in aggregate).

Average gas and condensate production from the VAS field for period from 1 January 2017 to 31 March 2017 was 86,890 m(3) /d of gas and 6.7 m(3) /d of condensate (613 boepd in aggregate).

The MEX-109 infill well, located in the MEX-GOL field, has been drilled, to a depth of 4,873metres, and is now being logged, cased and prepared for completion. The well had an original target depth of 5,250 metres but, due to some technical issues, further drilling activities were curtailed once the primary reservoir targets were accessible. The well was spudded in July 2016 and targeted Visean reservoirs ("B-Sands"). It is anticipated that completion operations will be concluded by May 2017, and thereafter well testing will commence. Subject to successful testing, production hook-up will be completed by the end of the second quarter of 2017.

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

For further information, please contact:

 
 Regal Petroleum plc               Tel: 020 3427 
                                    3550 
 Keith Henry, Chairman 
  Sergei Glazunov, Financial 
  Director 
 
 Strand Hanson Limited             Tel: 020 7409 
                                    3494 
 Rory Murphy / Richard Tulloch 
 
 Citigate Dewe Rogerson            Tel: 020 7638 
                                    9571 
 Martin Jackson / Shabnam Bashir 
 

Philip Frank, PhD Geology, Chartered Geologist, FGS, PESGB, consultant to the Company, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.

 
 Definitions 
 boe     barrels of oil equivalent 
 boepd   barrels of oil equivalent 
          per day 
 LPG     liquefied petroleum 
          gas 
 m(3)    cubic metres per day 
  /d 
 m(3)    cubic metres 
 %       per cent 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCSSLFIDFWSEIL

(END) Dow Jones Newswires

April 04, 2017 02:00 ET (06:00 GMT)

1 Year Regal Petroleum Chart

1 Year Regal Petroleum Chart

1 Month Regal Petroleum Chart

1 Month Regal Petroleum Chart

Your Recent History

Delayed Upgrade Clock