ADVFN Logo

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

MSMN Mosman Oil And Gas Limited

0.016
0.0015 (10.34%)
28 Mar 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Mosman Oil And Gas Limited LSE:MSMN London Ordinary Share AU0000XINET1 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.0015 10.34% 0.016 0.015 0.017 0.016 0.014 0.01 610,923,395 09:02:10
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 2.25M -2.13M -0.0005 -0.40 801.84k
Mosman Oil And Gas Limited is listed in the Crude Petroleum & Natural Gs sector of the London Stock Exchange with ticker MSMN. The last closing price for Mosman Oil And Gas was 0.01p. Over the last year, Mosman Oil And Gas shares have traded in a share price range of 0.0105p to 0.0925p.

Mosman Oil And Gas currently has 4,009,195,586 shares in issue. The market capitalisation of Mosman Oil And Gas is £801,839 . Mosman Oil And Gas has a price to earnings ratio (PE ratio) of -0.40.

Mosman Oil And Gas Share Discussion Threads

Showing 18601 to 18612 of 24400 messages
Chat Pages: Latest  748  747  746  745  744  743  742  741  740  739  738  737  Older
DateSubjectAuthorDiscuss
24/7/2019
11:08
RNS

The Company is progressing the EP 145 current work program of 100km of 2D seismic surveys, seismic processing and interpretation and well planning. A specialist company, Synterra Technologies Pty. Ltd ("Synterra") was contracted some months ago to undertake the work with Mosman staff and Synterra completing field visits to assess the terrain and logistical requirements for the seismic survey. Mosman is currently working closely with Synterra to finalise several submissions to obtain approvals required prior to proceeding with the acquisition of the seismic data.



In the interim financial statements for the six months ended 31 December 2018, Mosman highlighted that the permit had an anniversary date of 21 August 2019 by which time the current work program is required to be completed. The permit will automatically proceed in to the fourth year of the five-year term on 21 August 2019.

spary1
24/7/2019
08:39
Yep great news shanur, should be about 2 weeks then wireline logging which is very quick so hopefully an update is very quick to follow :)
spary1
24/7/2019
08:10
Drilling issues resolved in Dukas now.
shanur90
23/7/2019
18:05
Spoken like the true multi ID poster & buffoon you really are.
bulgarian
23/7/2019
15:33
who cares? Kev Jones will be able to answer that one tho.

What is more relevant is what the share price is doing where it is.

bulgarian
23/7/2019
14:26
I couldn't give a toss about your conspiracy garbage.

I do consider your recent PR campaign ramping the Stanley 2 prods update / Dukas to be another glaring balls-up.

which will have even more down on paper.

How you and your boiler room brothers sleep at night is a mystery.

bulgarian
23/7/2019
13:33
Kevarian... choose life
carla1
23/7/2019
13:23
Kev Jones will no doubt be along in his own time to call you out once again cretin.

cowardly deviant lying cretin at that.

bulgarian
23/7/2019
12:26
Bulgarian here is another then, we all know how LSE displays the amount of post on this new version and if post are removed that number doesn’t go down, so it says post no 5 and if you count the post there are 5 now Kev Jones ID says I have had my posts removed today, so does that make him a lying deviant then 🤔 going to be an interesting answer, do you call your other ID a liar or don’t you 😉
spary1
23/7/2019
12:16
DUKAS UPDATE
As previously announced on 12 July, the Dukas 1 well had successfully completed wireline logging from 2604m measured depth (MD) to 3515m MD. Subsequent to that announcement, Santos, as Operator of EP112, advised Central that the Dukas-1 well had encountered mechanical issues which necessitated a pause in planned drilling activities. Those mechanical issues related to a stuck liner hanger and initial attempts to rectify the issue required specialist tools and expertise. It was unclear at that time how long the issue would take to resolve and if ultimately drilling activity would be substantially deferred.Central has now been advised that the 8 5/8” liner hanger, liner hanging running tool and liner have been successfully fished from the hole and a wiper trip is in progress. The current forward plan is to drill ahead to total depth in the current 9 1⁄2” hole.
-ends-

spary1
23/7/2019
10:38
The Tard is out of control. Running around GC on his loss-making company bbs and getting posts removed left, right and centre. Hilarious to watch.
kevjones2
22/7/2019
09:12
The Tard is throwing a sevener on GC.

Posts being removed as usual.lol.

kevjones2
Chat Pages: Latest  748  747  746  745  744  743  742  741  740  739  738  737  Older

Your Recent History

Delayed Upgrade Clock