ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

LMI Lonmin Plc

75.60
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Lonmin Plc LSE:LMI London Ordinary Share GB00BYSRJ698 ORD USD0.0001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 75.60 73.70 74.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Lonmin PLC Q4 and FY 2017 Production Report (4681V)

03/11/2017 7:00am

UK Regulatory


Lonmin (LSE:LMI)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Lonmin Charts.

TIDMLMI

RNS Number : 4681V

Lonmin PLC

03 November 2017

LEI No: 213800FGJZ2WAC6Y2L94

REGULATORY RELEASE

3 November 2017

Fourth Quarter and Full Year 2017 Production Report and Business Update

Lonmin Plc ("Lonmin" or "the Company"), one of the world's largest primary platinum producers, today announces its production results for the three and twelve months to 30 September 2017 (unaudited) and includes a business update.

Overview

-- Fatality free quarter and the twelve-month rolling LTIFR to 30 September improved by 9.1% to 4.52 per million man hours.

-- Net Cash improved again to $103 million at 30 September, up from $86 million at 30 June and $75 million at 31 March.

-- Mining performance improvement has been sustained from March 2017. Tonnes mined by our Generation 2 shafts increased for the fourth quarter by 7.5% to 2.3 million tonnes compared with the fourth quarter of 2016, providing a 2.3% improvement for the year to 8.3 million tonnes for the year.

   --     The three core Generation 3 shafts, K3, Rowland and Saffy up 13.4% for the fourth quarter 

-- K3 up 20.3% for the fourth quarter and the August production of 293,000 tonnes was the highest since 2013

   --     Saffy's fourth quarter production was the highest in its history 
   --     Rowland's third quarter production was the highest since 2011 

-- Sales of 218,687 Platinum ounces for the fourth quarter increased by 3.6% on the fourth quarter of 2016. This enabled us to achieve Platinum sales of 706,030 ounces for the year, exceeding our guidance of between 650,000 and 680,000 Platinum ounces.

-- Average Rand full basket price for the fourth quarter down 8.7% on the fourth quarter of 2016, at R11,567 per PGM ounce on the back of a stronger rand.

-- Our unit costs for the fourth quarter were R11,524 per PGM ounce (6E basis), an increase of 4.3% on the fourth quarter of 2016, and an increase of 8.9 % for the 12 months to R11,701 per PGM ounce, within our revised unit cost guidance of between R11,300 and R11,800 per PGM ounce.

-- Lonmin announces today an update on the Operational Review process and the reasons that its financial results for the year ended 30 September 2017, which were previously expected to be announced on 13 November 2017, will be delayed.

 
                                                 3 months      3 months            %    12 months     12 months            % 
                                                       to            to    Increase/                               Increase/ 
                                                       30            30                     to 30         to 30 
                                                      Sep           Sep                       Sep           Sep 
                                                     2017          2016   (decrease)         2017          2016   (decrease) 
----------  -------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
             Generation     K3 
 Tonnes       2              Shaft       kt           852           708        20.3%        2 831         2 687         5.4% 
                            Rowland 
 Mined                       Shaft       kt           520           487         6.9%        1 925         1 731        11.2% 
                            Saffy 
                             Shaft       kt           604           547        10.3%        2 174         2 055         5.8% 
  Total Core 
   Generation 
   2                                                1 976         1 742        13.4%        6 930         6 473         7.1% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
                            4B 
                             Shaft       kt           324           397       -18.3%        1 320         1 588       -16.9% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
  Total Generation 
   2                                     kt         2 300         2 139         7.5%        8 250         8 061         2.3% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
 
    Generation 
    1                                    kt           496           485         2.4%        1 854         2 196       -15.6% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
                            Tonnes 
  Total underground          Mined       kt         2 796         2 624         6.6%       10 104        10 256        -1.5% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
  Total Tonnes 
   Mined                    100%         kt         2 796         2 663         5.0%       10 148        10 305        -1.5% 
 ------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
                                                      185           171                       651           659 
 Ounces      Lonmin (incl   Platinum     oz           049           746         7.7%          307           754        -1.3% 
                                                      356           326                     1 252         1 264 
 Mined       Pandora)       PGMs         oz           433           077         9.3%          155           101        -0.9% 
----------  -------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
                                                      218           211                       706           735 
 Sales                      Platinum     oz           687           140         3.6%          030           747        -4.0% 
 Refined                                              426           390                     1 381         1 405 
  metal                     PGMs         oz           200           743         9.1%          413           103        -1.7% 
-------------------------  ---------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
             $ basket incl. 
 Average      by-product revenue        $/oz          880           902        -2.5%          844           796         6.0% 
             R basket incl.                            11            12 
 Prices       by-product revenue       ZAR/oz         567           663        -8.7%       11 236        11 637        -3.4% 
----------  ------------------------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
 Exchange    Average rate for 
  rate        period                   ZAR/$        13.17         14.06        -6.3%        13.37         14.77        -9.5% 
----------  ------------------------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
 Unit        Cost of production                        11            11 
  costs       per PGM ounce            ZAR/oz         524           046        -4.3%       11 701        10 748        -8.9% 
----------  ------------------------  -------  ----------  ------------  -----------  -----------  ------------  ----------- 
 

Ben Magara, Chief Executive Officer, said: "Our principal focus for 2017 was to remain at least cash neutral in line with our short term strategic objective to be able to deal successfully with the continued low PGM pricing environment. Given the slow start to the year, we are pleased with the way our mining operations have performed throughout the last three successive quarters to compensate for the poor performance in the first four months of the financial year up to 31 January 2017. We have succeeded in making meaningful progress in this tough operating environment, by improving our production performance reducing capital expenditure to the minimum required for the safe and efficient running of operations, and maintaining operational and strategic flexibility. Our processing teams continue to deliver exceptional performance. Lonmin's Operational Review continues with the primary objective of preserving value for shareholders and safeguarding the long-term interests of employees and all key stakeholders. We are pleased with the progress made so far and will report the results to shareholders in due course."

Safety

-- Our safety strategy is centred on the belief that Zero Harm is achievable and important contributions are required from all stakeholders to achieve it.

-- We had a fatality free fourth quarter and the twelve month rolling LTIFR to 30 September 2017 improved by 9.1% to 4.52 per million man hours from 4.97 in the prior year.

-- Despite most safety indicators showing improvement, regrettably five of our colleagues were fatally injured during the first nine months of the year. We extend our deepest condolences to the families and friends of our colleagues and deeply regret their loss.

-- We remain determined to better our overall safety performance and we continue to enhance our safety initiatives. Each incident was thoroughly investigated and reported to the DMR. Lessons learned from each incident were implemented into action plans and shared across operations.

   --     K3 achieved 6.5 million fatality-free shifts. 
   --     EPC concentrator achieved four years lost time injury free. 
   --     The Assay laboratory achieved 11 years of operating without a lost-time injury. 

-- We have been encouraged that our collaboration with key stakeholders, including the Department of Mineral Resources (DMR) and The Association of Mineworkers and Construction Union (AMCU), continues to yield results, as we have experienced improved safety and decreasing Section 54 stoppages.

Fourth Quarter Production Overview

Mining Operations

The Marikana mining operations (including Pandora) produced 2.8 million tonnes during the quarter, an increase of 5.0% or 133,000 tonnes on the fourth quarter of 2016, driven by a 13.4% increase in production from our three core Generation 2 shafts (K3, Rowland and Saffy).

Generation 2 shafts

Production for the fourth quarter from our Generation 2 shafts (K3, Rowland, Saffy and 4B) was 2.3 million tonnes, an increase of 7.5% on the fourth quarter of 2016, notwithstanding an 18.3% decrease in production from 4B. Excluding 4B, production for the fourth quarter from our three core long life Generation 2 shafts, increased by 13.4%. We continually review each shaft on its merits and in light of 4B shaft's lacklustre performance and its short life of mine relative to the other Generation 2 shafts, the capital required to improve 4B ranks behind other projects in capital allocation. As such, while we remain in a capital constrained environment, we are reclassifying 4B as a Generation 1 shaft from 2018.

-- K3 shaft produced 852,000 tonnes, an increase of 20.3% on the fourth quarter of 2016. The production of 293,000 tonnes at K3 for the month of August was the highest since 2013.

-- Saffy shaft produced 604,000 tonnes, an increase of 10.3% on the fourth quarter of 2016. This was Saffy's highest quarterly production in its history.

-- Rowland shaft produced 520,000 tonnes, an increase of 6.9% on the fourth quarter of 2016. This was the shaft's second highest quarterly production since the fourth quarter of the 2011 financial year, bettered only by the 528,000 tonnes produced in Q3 2017.

-- 4B produced 324,000 tonnes, a decrease of 18.3% on the prior year period, as it sought to recover from the worse than anticipated geological conditions and safety challenges of the previous quarter.

Generation 1 shafts

In line with the Group's rationalisation of high cost ounces, production for the fourth quarter from our Generation 1 shafts (Hossy, Newman, W1, E1 and E2), excluding E3 and Pandora, at 326,000 tonnes was 14.3% lower than the fourth quarter of 2016. Some of these shafts are run by contractors, which provide better flexibility to retain or close them, depending on their profit contribution to the Company. In this regard, E2 shaft has reached a stage where the remaining ore reserve is insufficient to support an economically viable operation. As a result, the shaft will be placed on care and maintenance by January 2018.

The combined E3 Pandora production of 170,000 tonnes is up 63.3% on the fourth quarter of 2016, on the back of progress made pursuant to our recovery plans. On completion of the Pandora acquisition and in light of the future value potential in this shaft it is under consideration to be classified as a Generation 2 shaft.

Hossy shaft was due to be closed at the end of the 2017 financial year, but as a result of the improved performance and the IAOR of 11 months, we have decided to delay the placement on care and maintenance of Hossy by another year to around September 2018, depending on continued profit contribution.

There was no production from Newman shaft this quarter, as the shaft was put on care and maintenance in March 2017 due to safety concerns and the depletion of mineable reserves.

Production Losses

For the fourth quarter, production lost due to Section 54 safety stoppages totalled only 38,000 tonnes, compared to 82,000 tonnes in the fourth quarter of 2016, on the back of our improved ongoing focus on safety and pro-active interactions with the Inspectorate of the DMR and with the Unions. Given the reduced operational disruptions, we experienced a safe mining rhythm which is crucial for good performance.

 
                                         Q4 2017    Q4 2016 
                                          Tonnes     Tonnes 
 Section 54 safety stoppages              38,000     82,000 
 Management Induced Safety Stoppages 
  and other                               22,000     13,000 
 Community disruptions and other          56,000     21,000 
 Total tonnes lost                       116,000    116,000 
-------------------------------------  ---------  --------- 
 

The increase in Management Induced Safety Stoppages (MISS) shows a more self-regulated effort to section 23 and management stoppages.

However, we experienced sporadic community unrest during July, which impacted production on our Eastern shafts. The community unrest contributed 25,000 tonnes to the total tonnes lost for the fourth quarter.

Process Operations

Milling production in the fourth quarter of 2.8 million tonnes was broadly flat on the fourth quarter of 2016, due to stock release in the fourth quarter of 2016.

Underground and overall milled head grade in the fourth quarter at 4.72 grammes per tonnes (5PGE+Au) increased by 2.9% when compared to the 4.59 grammes per tonne achieved in the fourth quarter of 2016 due to improved ore mix and also improved mining standards which reduced dilution.

Saleable Platinum production (Metals-in-Concentrate including purchases) in the fourth quarter was 186,764 ounces, which was 2.3% higher than the fourth quarter of 2016, due to the higher mill head grade and recoveries. Platinum ounces in concentrate produced (contained) in the fourth quarter was 192,540 ounces, which was 2.3% higher than the fourth quarter of 2016.

Concentrator recoveries in the fourth quarter were 87.6%, an increase of 1.9% from 86.0% in the fourth quarter of 2016, mainly due to plant stability brought about by the consistent supply of ore from mining operations.

Total refined Platinum production in the fourth quarter at 205,946 ounces was 6.2% lower than the fourth quarter of 2016, due to reduced output from the smelter clean-up project. Refined production benefited from the smelter clean-up project, which released only 12,445 Platinum ounces during the quarter compared to 36,881 Platinum ounces during the fourth quarter of 2016. The smelter clean-up project is expected to continue into the first half of the 2018 financial year, but at a much reduced level.

Sales & Pricing

Platinum sales for the quarter were 218,687 ounces, an increase of 3.6% on the fourth quarter of 2016, due to continued innovation and operational excellence. PGM sales were 426,200 ounces, up 9.1% on the fourth quarter of 2016, driven by timing of sales and metal releases from smelter project.

The US Dollar basket price (including base metal revenue) at $880 per ounce during the quarter was down 2.5% on the fourth quarter of 2016 while the corresponding Rand basket price (R11,567 per PGM ounce) was 8.7% lower than the prior year period. The average Rand to US Dollar exchange rate was 6.3% stronger at 13.17 compared to 14.06 in the fourth quarter of 2016.

Full Year Production Overview

Mining Operations

After a poor first four months of the financial year up to 31 January 2017, the improvement in our production performance since February 2017 enabled the mining operations to produce total tonnes for the year of 10.1 million tonnes, broadly flat on the 10.3 million tonnes from the prior year. Our three core Generation 2 shafts (excluding 4B) increased year on year production for the 12 months by 7.1% (increase of 0.4 million tonnes from 6.5 million tonnes to 6.9 million tonnes) and, in line with our strategy to remove high cost production in a low price environment, our Generation 1 shafts reduced production for the twelve months by 15.6% (decrease of 0.3 million tonnes from 2.2 million tonnes to 1.9 million tonnes).

 
 Generation 2 Shafts 
  Tonnes Hoisted Quarterly 
                     Q4      Q3      Q2      Q1   Total 
 Tonnes ('000) 
 2017             1 842   1 879   2 228   2 300   8 250 
 2016             1 944   1 934   2 043   2 139   8 061 
---------------  ------  ------  ------  ------  ------ 
 

Generation 2 shafts

Our three core long life Generation 2 shafts, which represent around 68% of total tonnage production, produced 6.9 million tonnes for the twelve month period, a 7.1% increase on prior year comparable production, driven by a strong turnaround at K3 which was up 5.4% year on year (28% of total production) after a slow start, and an impressive 11.2% year on year increase from Rowland (19% of total production). Saffy (21% of total production) continues to perform well and was up 5.8% year on year.

 
                                2017      2016   Increase/ 
                                                  decrease 
 Generation                   Tonnes    Tonnes       % 
 2 Shafts                     ('000)    ('000) 
 
 K3 Shaft                      2 831     2 687        5.4% 
 Rowland Shaft                 1 925     1 731       11.2% 
 Saffy Shaft                   2 174     2 055        5.8% 
--------------------------  --------  --------  ---------- 
 Total Core Generation 
  2 Shafts                     6 930     6 473        7.1% 
 
 4B Shaft*                     1 320     1 588      -16.9% 
 
 Total Generation 
  2 shafts                     8 250     8 061        2.3% 
-------------------------   --------  --------  ---------- 
 

Production at 4B (13% of total production) was down 16.9% due to worse than anticipated geological conditions and was also impacted by safety stoppages and the disruption associated with two fatalities.

Generation 1 shafts

For the twelve month period, production from our Generation 1 shafts (Hossy, Newman, W1, E1, E2, E3 and Pandora (100%)) at 1.9 million tonnes was 15.6% lower than the prior year, in line with the Group's rationalisation of these shafts. Newman shaft was placed on care and maintenance in March.

The combined E3 Pandora production of 574,000 tonnes is up 8% on the prior year, on the back of progress made pursuant to our recovery plans. In light of this improved performance and on completion of the Pandora acquisition, E3 is under consideration to be classified as a Generation 2 shaft.

Production Losses

For the twelve months period, a total of some 276,000 tonnes of production was lost in the year due to Section 54 safety stoppages, equivalent to 17,000 Platinum ounces lost, compared to 559,000 tonnes lost in the prior year. This was a reduction of 51%.

 
                                            2017       2016 
                                          Tonnes     Tonnes 
 Section 54 safety stoppages             276,000    559,000 
 Management induced safety stoppages 
  and other                              176,000     33,000 
 Community disruptions and other         143,000     86,000 
 Total tonnes lost                       595,000    678,000 
-------------------------------------  ---------  --------- 
 

We experienced some community unrest during May and June, which impacted production on the eastern shafts. The community unrest contributed 82,000 tonnes to the total tonnes lost for the current year.

While we continued to experience a reduction in the duration and frequency of Section 54 stoppages, there was an increase in MISS as part of increased self-regulation. Production lost due to MISS for the year increased to 176,000 tonnes from 33,000 tonnes in the prior year, reflecting our non-negotiable stance on safety.

Immediately Available Ore Reserves

Operational flexibility was reduced with the immediately available ore reserve position of 3.2 million square metres at 30 September 2017, or 19 months average production versus 3.8 million square metres, or 22 months at 30 September 2016.

 
 
                        (m(2) 
                        '000)                         months 
             ------------------    --------------------------- 
                 2017      2016             2017          2016 
-----------  --------  --------    -------------  ------------ 
 K3               844     1 030               19            23 
 Rowland          309       504              12*            18 
 Saffy            772       765               25            26 
 4B               431       556               18            21 
-----------  --------  --------    -------------  ------------ 
 Generation 
  2             2 356     2 855               18            22 
 Generation 
  1               614       751               21            24 
 K4               188       188 
                    3 
 Total            158     3 794               19            22 
===========  ========  ========    =============  ============ 
 

*Rowland ore reserve dropped due to depletion of levels on the extremities of the shaft boundary. Mining tonnes are maintained by focussing on vamping operations. The development of the MK2 extension, subject to securing project finance, will improve the ore reserve position towards 2019.

As part of our drive to increase mining production, following the poor first quarter production, our healthy ore reserve position enabled us to move some non-critical development crews to provide additional stoping and vamping crews in our core Generation 2 shafts. However, following the mining turnaround achieved, the development crews had returned to their development areas by the end of the financial year.

The ore reserve position of the Marikana mining operations is still at a level that provides the necessary flexibility required for efficient mining (industry benchmark of around 12-15 months).

Process Operations

Total tonnes milled for the year at 10.0 million tonnes were 3.2 % lower than prior year of 10.4 million tonnes, in line as Generation 1 shaft continues to deplete in line with our strategy

Platinum-in-concentrate production (before concentrate purchases) for the year of 644,240 saleable Platinum ounces was 2.9% down on prior year, due to lower tonnes milled.

The overall milled head grade for the year at 4.61 grammes per tonnes (5PGE+Au) was broadly in line with the 4.59 grammes per tonne achieved in the prior year.

Concentrators continued to deliver excellent overall recoveries for the year at 87.0%, marginally higher than the 86.6% for the prior year.

For the twelve month period, refined production of 687,529 Platinum ounces was achieved, a decrease of 7.3% on the refined production of 741,890 ounces from prior year, in line with our strategy to remove high cost production and the reduction in contribution from the smelter clean-up project. Total PGMs produced for the year were 1,320,802 ounces, a decrease of 8.3% on prior year.

The smelter clean-up project and permanent release from the smelting and refining plants continued during the current year and released a total of 31,682 ounces of Platinum during the year, less than the 73,186 ounces in the prior year as expected. The smelter clean-up project was one of the initiatives aimed at improving our cash position, having identified the opportunity to increase low cost refined Platinum production to make up for the shortfall in mined ounces. We expect minimal ounces in the 2018 financial year, as the smelter ounces are depleted.

Sales & Pricing

Sales for the year were 706,030 Platinum ounces, exceeding the sales guidance of 650,000 to 680,000 Platinum ounces.

For the year, the US Dollar basket price (including base metal revenue) at $844 per ounce increased by 6.0% on the prior year, while the corresponding Rand basket price (R11,236 per ounce) was 3.4% lower than the prior year. The average Rand to US Dollar exchange rate for the year was 9.5% stronger at 13.37 compared to 14.77 for the prior year.

Unit Costs

Unit costs for the quarter were R11,524 per PGM ounce, a year on year increase of 4.3%. This is within our revised guidance of between R11,300-R11,800.

For the year, unit costs increased by 8.9% to R11,701 per PGM ounce, partly impacted by the 8 % increase in labour costs. The poor production in the first four months resulted in a significant increase in unit cost in the first half of the year to R12,059 per PGM ounce, with improved mining performance delivering a unit cost of R11,406 for the last six months to September 2017, enabling us to achieve our revised guidance of between R11,300-R11,800.

 
 2017 Unit Costs 
  Per Quarter 
                       Q4         Q3          Q2         Q1      Total 
--------------  ---------  ---------  ----------  ---------  --------- 
 Rand per PGM          11         11          11         12         11 
  ounce               524        278         836        296        701 
--------------  ---------  ---------  ----------  ---------  --------- 
 

Capital Expenditure

Capital expenditure was limited to R1,336 million ($100 million) compared with R1,268 million ($89 million) in the prior year, which includes R370 million for the third party funded Bulk Tailings Treatment project. This is in line with our strategy of limiting capital expenditure to levels required to satisfy regulatory and safety standards, essential sustaining capital expenditure in the continuing shafts and ensuring that Immediately Available Ore Reserve positions are maintained at an acceptable level to sustain production at our Generation 2 shafts.

 
                                                                                                2017 Revised 
                                       2016                       2017                              Guidance                   2018 Guidance 
 ------------------------------------------  -------------------------  ------------------------------------  ------------------------------ 
                                     Actual                     Actual 
                                         Rm                         Rm                                    Rm                              Rm 
 ------------------------------------------  -------------------------  ------------------------------------  ------------------------------ 
 
 K3                                     215                        170                                   172                             157 
 Saffy                                   -2                         21                                     7                              29 
 Rowland                                 25                         48                                    42                              61 
 Rowland MK2                            216                        178                                   159                             137 
                  -------------------------  -------------------------  ------------------------------------  ------------------------------ 
 Generation 
  2 shafts                              454                        417                                   380                             385 
 K4                                       4                          7                                    12                               2 
 Hossy                                    0                          1                                     -                              30 
                  -------------------------  -------------------------  ------------------------------------  ------------------------------ 
 Generation 
  3 & 1 shafts                            4                          8                                    12                              32 
 Central & Other 
  Mining                                279                         93                                   143                             139 
 Total Mining                           737                        518                                   535                             556 
----------------  -------------------------  -------------------------  ------------------------------------  ------------------------------ 
 
 Concentrators 
  - Excl BTT                            164                        158                                   185                             159 
 BTT                                    102                        370                                   408                              59 
 Smelting & 
  Refining                              163                         95                                   110                             324 
                  -------------------------  -------------------------  ------------------------------------  ------------------------------ 
 
 Total Process                          428                        623                                   703                             542 
----------------  -------------------------  -------------------------  ------------------------------------  ------------------------------ 
 Infill 
  Apartments                             62                        151                                   156                             191 
 Other                                   40                         44                                    37                              40 
 Total                        1 268                              1 336                                 1 430                           1 329 
================  =========================  =========================  ====================================  ============================== 
 
 

The capital expenditure is marginally less than our revised guidance of R1,430 billion.

Capital invested in the period included R178 million for the Rowland MK2 project.

Despite consistent strong performance from Rowland, Lonmin's current capital position makes it challenging to continue funding the MK2 project, which is necessary to extend Rowland's economic life. Lonmin believes that the MK2 project will be value accretive and the Company is exploring options to introduce funding partners.

Cash

   --     Gross cash improved to $253 million at 30 Sept 2017 up from $236 million at 30 June 2017. 

-- Net Cash improved to $103 million (gross cash of $253 million less the drawn term loan of $150 million) at 30 Sept 2017, up from $86 million (gross cash of $236 million less the drawn term loan of $150 million) at 30 June 2017.

Guidance for Financial Year 2018

The operating environment remains tough, and we are planning on the basis that it will remain so for the foreseeable future.

   --     Platinum sales expected to be between 650,000 and 680,000 ounces. 

-- Unit costs remain under pressure and are expected to be in the range of R12,000 to R12,500 per PGM ounce.

-- Capital expenditure is anticipated to be limited to a range of R1.4 billion to R1.5 billion for each of the years ending 30 September 2018, 2019 and 2020, pending outcome of operational review.

Update of Operational Review and Deferral of Accounts

Lonmin announced an Operational Review on 7 August 2017 to address the uncertainties reported in our Interim Results in May 2017 on the Group's ability to continue as a going concern due to material uncertainty over the existing debt facilities in the weak economic and pricing environment. Underlying operational performance, as outlined in the Q4 production report, continues to be strong while the rand basket price has improved since the announcement of the Operational Review. Lonmin has gross cash of $253 million at 30 September 2017 (net cash of $103 million after deducting the drawn term loan of $150 million). The Board believes this provides adequate liquidity to fund the business through the Operational Review process.

The Operational Review includes potential transactions aimed at releasing capital from Lonmin's high quality downstream processing operations as well as several of its upstream assets and improving financial sustainability. Lonmin is encouraged by the level of interest generated by the Operational Review. Discussions with third parties in relation to a number of proposals which Lonmin has received are ongoing.

Whilst the preparation of the financial statements and operational review process is still ongoing, current indications are that the Tangible Net Worth of the Group at its financial year-end would be in the region of the covenant (the "TNW Covenant") level required by its banking facilities of $1.1 billion due to a non-cash impairment of the carrying value of the Group's assets. As announced on 6 October 2017, Lonmin obtained a pre-emptive waiver from its lending banks from the testing of the TNW Covenant at its financial year-end on 30 September 2017. The outcome of discussions, both as part of the Operational Review and with existing and prospective lenders, including discussions around developmental capital for the Rowland MK2 project, could have a material bearing both on the directors' assessment of the impairment and on the directors' assessment of the basis of the preparation of the audited financial statements of the Company for the year ended 30 September 2017 as a going concern.

The objective of the Operational Review is to achieve a properly funded viable business plan based on potential disposal proceeds, new debt capital and the continuing support of existing lenders which may include obtaining their consents and waivers of any future potential covenant breaches and disposals under the Operational Review as required by the facilities agreements.

The Operational Review, and the potentially significant outcomes, has required and continues to demand management's undivided attention and, as a result, the preparation of the audited full year financial results has been delayed. This includes areas of material accounting judgement like impairment of assets, the basis of preparation of the accounts and the impact of any outcomes of the Operational review thereon. Lonmin and its auditors require additional time to complete the audit.

Taking these factors together, the Board has decided that it will not be appropriate to publish the 2017 financial results on 13 November as previously planned. A further announcement will be made in due course.

-S -

ENQUIRIES

Investors / Analysts:

Lonmin

   Tanya Chikanza (Head of Investor Relations)         +27 11 218 8358 /+44 20 3908 1073 
   Andrew Mari (Investor Relations Manager)            +27 11 218 8420 

Media:

 
       Cardew Group 
        Anthony Cardew / David 
        Roach / 
        Joe McGregor                 +44 207 930 0777 
       Wendy Tlou                  +27 83 358 0049 
 

Notes to editors

Lonmin, which is listed on both the London Stock Exchange and the Johannesburg Stock Exchange, is one of the world's largest primary producers of PGMs. These metals are essential for many industrial applications, especially catalytic converters for internal combustion engine emissions, as well as their widespread use in jewellery.

Lonmin's operations are situated in the Bushveld Igneous Complex in South Africa, where more than 70% of known global PGM resources are located.

The Company creates value through mining, refining and marketing PGMs and has a vertically integrated operational structure - from mine to market. Underpinning the operations is the Shared Services function which provides high quality levels of support and infrastructure across the operations.

For further information please visit our website: http://www.lonmin.com

 
                                                                   3 months   3 months   12 months   12 months 
                                                                      to 30      to 30       to 30       to 30 
                                                                        Sep        Sep         Sep         Sep 
                                                                       2017       2016        2017        2016 
               -----------------------  -----------------  -----  ---------  ---------  ----------  ---------- 
 Tonnes         Marikana                 K3 Shaft            kt         852        708       2 831       2 687 
                 Rowland 
 mined(1)         Shaft                          kt                     520        487       1 925       1 731 
     Saffy Shaft                           kt                           604        547       2 174       2 055 
                                                                  ---------                         ---------- 
     Core Generation 
      2                                    kt                         1 976      1 742       6 930       6 473 
     4B Shaft                              kt                           324        397       1 320       1 588 
     Generation 
      2                                    kt                         2 300      2 139       8 250       8 061 
     1B Shaft                              kt                                                                6 
     Hossy Shaft                           kt                           162        191         655         712 
     Newman Shaft                          kt                                       56          51         346 
     W1 Shaft                              kt                            41         34         145         162 
     East 1 Shaft                          kt                            52         33         168         141 
     East 2 Shaft                          kt                            71         66         262         293 
     East 3 Shaft                          kt                            14         21          71          63 
     Pandora 
      (100%)(2)                            kt                           156         83         503         471 
     Generation 
      1                                    kt                           496        485       1 854       2 196 
     Underground                           kt                         2 796      2 624      10 104      10 256 
     Opencast                              kt                                       39          45          49 
    -----------------  -----------------------------------------  ---------  ---------  ----------  ---------- 
                             Total Tonnes 
    Lonmin (100%)             Mined (100%)             kt             2 796      2 663      10 148      10 305 
     % tonnes 
      mined from 
      UG2 reef 
      (100%)                               %                          72.5%      74.2%       73.1%       75.3% 
    -----------------  -----------------------------------------  ---------  ---------  ----------  ---------- 
                             Underground 
    Lonmin (attributable)     & Opencast               kt             2 718      2 622       9 897      10 070 
 
                Lonmin excluding                                        173        165         616         627 
 Ounces          Pandora                 Pt Ounces           oz         851        894         422         245 
 Mined(3)       Pandora (100%)           Pt Ounces           oz      11 198      5 852      34 886      32 509 
                                                                  ---------  ---------  ----------  ---------- 
                                                                        185        171         651         659 
    Lonmin                   Pt Ounces                 oz               049        746         307         754 
 
    Lonmin excluding                                                    334        314       1 182       1 200 
     Pandora                 PGM Ounces                oz               154        538         793         244 
    Pandora (100%)           PGM Ounces                oz            22 279     11 539      69 362      63 857 
                                                                  ---------  ---------  ----------  ---------- 
                                                                        356        326       1 252       1 264 
    Lonmin                   PGM Ounces                oz               433        077         155         101 
   -----------------------  -----------------  -----------------  ---------  ---------  ----------  ---------- 
 Tonnes         Marikana                 Underground         kt       2 605      2 699       9 486       9 806 
 milled(4)       Opencast                        kt                       0         39          49          98 
     Total                                 kt                         2 605      2 738       9 535       9 904 
    Pandora(5)               Underground               kt               156         83         503         471 
                                                                  ---------  ---------  ----------  ---------- 
    Lonmin Platinum          Underground               kt             2 761      2 783       9 989      10 277 
          Milled head 
             grade(6)                     g/t                          4.72       4.59        4.61        4.60 
             Recovery 
              rate(7)                      %                          87.6%      86.3%       87.1%       86.7% 
     Opencast                              kt                             0         39          49          98 
          Milled head 
             grade(6)                     g/t                          4.97       4.81        4.42        3.59 
             Recovery 
              rate(7)                      %                          67.7%      64.3%       68.3%       73.6% 
     Total                                 kt                         2 761      2 821      10 039      10 375 
          Milled head 
             grade(6)                     g/t                          4.72       4.59        4.61        4.59 
             Recovery 
              rate(7)                      %                          87.6%      86.0%       87.0%       86.6% 
    -----------------  -----------------------------------------  ---------  ---------  ----------  ---------- 
 
 
                                                             3 months   3 months   12 months   12 months 
                                                                to 30      to 30       to 30       to 30 
                                                                  Sep        Sep         Sep         Sep 
                                                                 2017       2016        2017        2016 
  -----------------  -----------------  ------------  ----  ---------  ---------  ----------  ---------- 
 Metals-in-                                                       171        174         609         631 
 concentrate(8)       Marikana           Platinum      oz         659        936         354         066 
------------------- 
                                                                                         282         292 
     Palladium                       oz                        79 810     79 673         246         315 
 
     Gold                            oz                         4 259      4 253      15 171      15 206 
     Rhodium                         oz                        24 229     24 199      86 254      90 151 
                                                                                         144         147 
     Ruthenium                       oz                        40 811     39 908         996         740 
     Iridium                         oz                         8 611      8 289      30 303      29 845 
                                                                  329        331       1 168       1 206 
     Total PGMs                      oz                           379        259         324         322 
     Nickel(9)                       MT                           880        889       3 144       3 169 
     Copper(9)                       MT                           544        547       1 964       1 949 
    ------------  ---------------------------------------- 
    Pandora            Platinum               oz               11 198      5 852      34 886      32 509 
     Palladium                       oz                         5 303      2 752      16 509      15 231 
     Gold                            oz                            76         16         243          95 
     Rhodium                         oz                         1 906        953       5 928       5 360 
     Ruthenium                       oz                         3 133      1 616       9 750       8 852 
     Iridium                         oz                           662        349       2 047       1 811 
     Total PGMs                      oz                        22 279     11 539      69 362      63 857 
     Nickel(9)                       MT                            18         15          65          93 
     Copper(9)                       MT                            10          6          31          32 
    ------------  ----------------------------------------  ---------  ---------  ----------  ---------- 
    Concentrate        Platinum               oz                3 907      1 824       4 871       5 129 
    purchases          Palladium              oz                1 239        472       1 550       1 555 
     Gold                            oz                            16          7          21          18 
     Rhodium                         oz                           503        158         597         565 
     Ruthenium                       oz                           772        299         935         919 
     Iridium                         oz                           221         73         263         242 
     Total PGMs                      oz                         6 658      2 833       8 237       8 429 
     Nickel(9)                       MT                             5          1           6           2 
     Copper(9)                       MT                             3          0           4           2 
    ------------  ----------------------------------------  ---------  ---------  ----------  ---------- 
                                                                  186        182         649         668 
    Lonmin Platinum    Platinum               oz                  764        612         111         704 
                                                                                         300         309 
     Palladium                       oz                        86 353     82 897         305         101 
     Gold                            oz                         4 351      4 275      15 435      15 319 
     Rhodium                         oz                        26 638     25 310      92 779      96 076 
                                                                                         155         157 
     Ruthenium                       oz                        44 716     41 824         680         510 
     Iridium                         oz                         9 494      8 712      32 614      31 898 
                                                                  358        345       1 245       1 278 
     Total PGMs                      oz                           316        630         923         607 
     Nickel(9)                       MT                           903        905       3 215       3 265 
     Copper(9)                       MT                           557        552       1 998       1 983 
    ------------  ----------------------------------------  ---------  ---------  ----------  ---------- 
 
 
                                                          3 months        3 months        12 months       12 months 
                                                                to 
                                                                30           to 30            to 30           to 30 
                                                               Sep             Sep              Sep             Sep 
                                                              2017            2016             2017            2016 
                ------------  ------------  ------  --------------  --------------  ---------------  -------------- 
                 Lonmin 
                  refined 
                  Metal                                205               219             685              739 
 Refined          Production   Platinum       oz        632               250             028              315 
                ------------ 
                                                                94                              316             334 
 Production       Palladium             oz                     835          96 783              517             470 
 
     Gold                        oz                          5 563           5 483           18 017          19 596 
                                                                28                              100             121 
     Rhodium                     oz                            108          32 294              677             149 
                                                                48                              162             177 
     Ruthenium                   oz                            749          56 315              141             006 
     Iridium                     oz                          8 914          14 011           33 654          44 855 
                                                               391             424            1 316           1 436 
     Total PGMs                  oz                            801             136              034             390 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
    Toll 
     refined 
     metal 
     production   Platinum              oz                     314             243            2 501           2 575 
   ------------ 
     Palladium                   oz                            155             114              789             713 
 
     Gold                        oz                              7               6               35              30 
     Rhodium                     oz                             59              37              310             207 
     Ruthenium                   oz                            137              58              926             698 
     Iridium                     oz                             36              19              207             110 
     Total PGMs                  oz                            707             477            4 768           4 333 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
                 Total 
                  refined                                      205             219              687             741 
                  PGMs         Platinum       oz               946             493              529             890 
                ------------ 
                                                                94                              317             335 
     Palladium                   oz                            990          96 897              306             183 
 
     Gold                        oz                          5 570           5 489           18 052          19 626 
                                                                28                              100             121 
     Rhodium                     oz                            167          32 331              987             356 
                                                                48                              163             177 
     Ruthenium                   oz                            885          56 373              067             704 
     Iridium                     oz                          8 950          14 030           33 861          44 965 
                                                               392             424            1 320           1 440 
     Total PGMs                  oz                            508             613              802             724 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
    Base metals   Nickel(10)            MT                   1 022           1 096            3 502           3 769 
     Copper(10)                  MT                            684             696            2 126           2 227 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
                 Refined 
                  Metal                                        218             211              706             735 
 Sales            Sales        Platinum       oz               687             140              030             747 
                ------------ 
                                                               104                              324             334 
     Palladium                   oz                            549          94 440              273             319 
 
     Gold                        oz                          4 989           5 890           16 675          20 735 
                                                                29                              107             121 
     Rhodium                     oz                            312          32 322              742             604 
                                                                57                              193             145 
     Ruthenium                   oz                            981          31 701              479             306 
                                                                10 
     Iridium                     oz                            682          15 250           33 212          47 392 
                                                               426             390            1 381           1 405 
     Total PGMs                  oz                            200             743              413             103 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
     Nickel(10)                  MT                          1 031           1 249            3 770           3 773 
     Copper(10)                  MT                            820             624            1 874           2 265 
                                                               363             532            1 402           1 563 
     Chrome(10)                  MT                            564             768              697             236 
    ------------  --------------------------------  --------------  --------------  ---------------  -------------- 
 Average         Platinum                     $/oz             954           1 084              953             978 
 prices          Palladium                    $/oz             902             674              808             589 
    Gold                               $/oz                  1 286           1 478            1 244           1 425 
    Rhodium                            $/oz                  1 063             636              915             671 
    $ basket excl. by-product 
     revenue(11)                       $/oz                    832             850              790             753 
    $ basket incl. by-product 
     revenue(12)                       $/oz                    880             902              844             796 
    R basket excl. by-product                                   10 
     revenue(11)                       R/oz                    966          11 933           10 526          11 030 
    R basket incl. by-product                                   11 
     revenue(12)                       R/oz                    567          12 663           11 236          11 637 
   --------------------------  -------------------  --------------  --------------  ---------------  -------------- 
    Nickel(10)                         $/MT                  8 289           8 027            8 274           7 357 
    Copper(10)                         $/MT                  6 487           4 468            5 661           4 508 
   --------------------------   ------------------  --------------  --------------  ---------------  -------------- 
 Unit            Cost of Production per                         11 
  Costs           PGM ounce                  R/oz              524          11 046           11 701          10 748 
--------------  --------------------------          --------------  --------------  ---------------  -------------- 
 Exchange        Average rate 
  Rates           for period(13)              R/$            13.17           14.06            13.37           14.77 
-------------- 
    Closing rate                        R/$                  13.55           13.71            13.55           13.71 
   --------------------------   ------------------  --------------  --------------  ---------------  -------------- 
 
 
 Notes 
     1   Reporting of shafts are in line with our operating 
          strategy for Generation 1 and Generation 2 
          shafts. 
     2   Pandora underground tonnes mined represents 
          100% of the total tonnes mined on the Pandora 
          joint venture of which 42.5% for October and 
          November 2014 and 50% thereafter is attributable 
          to Lonmin. 
     3   Ounces mined have been calculated at achieved 
          concentrator recoveries and with Lonmin standard 
          downstream processing recoveries to present 
          produced saleable ounces. 
     4   Tonnes milled excludes slag milling. 
     5   Lonmin purchases 100% of the ore produced by 
          the Pandora joint venture for onward processing 
          which is included in downstream operating statistics. 
     6   Head Grade is the grammes per tonne (5PGE + 
          Au) value contained in the tonnes milled and 
          fed into the concentrator from the mines (excludes 
          slag milled). 
     7   Recovery rate in the concentrators is the total 
          content produced divided by the total content 
          milled (excluding slag). 
     8   Metals-in-concentrate have been calculated 
          at Lonmin standard downstream processing recoveries 
          to present produced saleable ounces. 
     9   Corresponds to contained base metals in concentrate. 
    10   Nickel is produced and sold as nickel sulphate 
          crystals or solution and the volumes shown 
          correspond to contained metal. Copper is produced 
          as refined product but typically at LME grade 
          C. Chrome is produced in the form of chromite 
          concentrate and volumes shown are in the form 
          of chromite. 
    11   Basket price of PGMs is based on the revenue 
          generated in Rand and Dollar from the actual 
          PGMs (5PGE + Au) sold in the period based on 
          the appropriate Rand / Dollar exchange rate 
          applicable for each sales transaction. 
         As per note 11 but including revenue from base 
    12    metals. 
         Exchange rates are calculated using the market 
         average daily closing rate over the course 
    13   of the period. 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLOKNDQPBDKPDK

(END) Dow Jones Newswires

November 03, 2017 03:00 ET (07:00 GMT)

1 Year Lonmin Chart

1 Year Lonmin Chart

1 Month Lonmin Chart

1 Month Lonmin Chart

Your Recent History

Delayed Upgrade Clock