ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

LMI Lonmin Plc

75.60
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Lonmin Plc LSE:LMI London Ordinary Share GB00BYSRJ698 ORD USD0.0001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 75.60 73.70 74.00 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Lonmin PLC Q1 2017 Production Report and Update (1479V)

26/01/2017 7:00am

UK Regulatory


Lonmin (LSE:LMI)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Lonmin Charts.

TIDMLMI

RNS Number : 1479V

Lonmin PLC

26 January 2017

REGULATORY RELEASE

26 January 2017

First Quarter 2017 Production Report and Update

Lonmin Plc ("Lonmin" or "the Company"), one of the world's largest primary Platinum producers, today announces its unaudited production results for the three months to 31 December 2016 and provides an operational update.

Safety

Our safety strategy is centred on the belief that Zero Harm is achievable and important contributions are required from all stakeholders to achieve it.

-- We achieved significant milestones in the journey towards Zero Harm at the following operations:

o Saffy shaft achieved 4 million fatality free shifts on 14 December 2016;

o Newman shaft achieved 3 million fatality free shifts on 28 October 2016;

o Rowland shaft exceeded 1 million fatality free shifts on 13 January 2017; and

o The Precious Metal Refinery achieved one year without a lost time injury as of 30 December 2016 and one year without a medical treatment as of 27 October 2016.

-- The twelve month rolling LTIFR to 31 December 2016 was 4.99 per million man hours, a marginal increase of 0.4% on September 2016 at 4.97.

-- Regrettably, and as announced at the time, one of our colleagues, Mr Joao Fernando Macamo, a Production Team Leader at E1 Shaft, was fatally injured following a tramming incident on Thursday 10 November 2016. We extend our deepest condolences to his family and friends.

-- We are addressing the root causes of safety incidents, and ensuring that the lessons learnt from each incident are implemented and shared across operations.

Mining Operations

The Marikana mining operations including Pandora produced 2.3 million tonnes during the quarter, down 7.8% or 0.2 million tonnes on the comparative period partly due to the planned decline from the closing of our high cost shafts. While the first quarter of our financial year is historically our lowest producing quarter, the mining performance was disappointing with production at our Generation 2 shafts down 5.2% from the prior year period. The implementation of initiatives to improve productivity is taking longer than we planned, particularly in respect to improving absenteeism; however we remain committed to delivering sustained productivity improvements at our operations to ensure the long-term viability of the business.

The reduction in Section 54 stoppages has continued, with tonnes lost due to Section 54 safety stoppages down by 71% in the quarter.

Generation 2

Tonnes mined from our Generation 2 shafts were 1.8 million tonnes, a decrease of 5.2%, or 0.1 million tonnes on the comparative period as K3's underperformance predominantly weighed down the overall performance.

-- K3, our biggest shaft, produced 590,000 tonnes, a disappointing decrease of 13.8% on the prior period. This shaft was most impacted by the reorganisation from 2016 and during the quarter experienced high management induced safety stoppages resulting in 60,000 tonnes of lost production. Overall, the relationship between operational management and unions at this shaft is not working as effectively as we expected and the yielding of results from the implementation of business improvement initiatives at this shaft is taking longer than we would have liked to see. As a result, we are deploying additional stoping and vamping crews to the shaft to take advantage of the immediately available ore reserves and improve production. This may have an adverse impact on the shaft head cost per tonne which we would seek to mitigate by further reducing our overhead costs.

-- Rowland shaft produced 424,000 tonnes, an increase of 9.6% on the prior year period as this shaft is now starting to gain the production benefits from improved safety performance.

-- Saffy shaft produced 493,000 tonnes, broadly in line with prior year period, demonstrating that the shaft is maintaining its steady state performance.

-- 4B produced 336,000 tonnes, a decrease of 10.7% on the prior year period as a result of higher than planned frequency of intersecting geological features and changes in middle management.

Generation 1

The performance at the Generation 1 shafts is in line with our plan and we are executing successfully the strategy to reduce high cost production in a low price environment. Tonnes mined from our Generation 1 shafts (1 B, Hossy, Newman, W1, E1, E2, E3 and Pandora (100%)) were 0.5 million tonnes, a decrease of 21.8%, or 0.1 million tonnes on the prior year period, reflecting the planned decline in production. Most of these shafts are run by contractors, which provide better flexibility to retain or close them.

Hossy shaft remains on track for planned care and maintenance closure by the end of this financial year and, as reported, at Newman, contract mining is being used to extract the remaining ore reserves.

Production Losses

We have been encouraged that the number and duration of Section 54 stoppages has continued to improve, as experienced during the final quarter of FY2016. This resulted in a 71% improvement in lost production due to Section 54 safety stoppages of 139,000 tonnes. This was partially offset by an increase in management induced safety stoppages which illustrate our non-negotiable stance on safety. Most of these stoppages were at K3 shaft where 60,000 tonnes were lost. Overall total tonnes lost in the quarter reduced to 147,000 tonnes, compared to 204,000 tonnes lost in Quarter 1 2016.

 
                                Q1 2017   Q1 2016 
                                 Tonnes    Tonnes 
 Section 54 safety stoppages     58,000   197,000 
 Management induced safety 
  stoppages and other            89,000     7,000 
 Total tonnes lost              147,000   204,000 
-----------------------------  --------  -------- 
 

Update on Business Improvement Initiatives

In light of the Quarter 1 performance, we are deploying additional stoping and vamping crews to Generation 2 shafts during Quarter 2 in order to provide support for the achievement of planned output, enabled by our healthy ore reserve position.

In addition, we continue our drive to implement the initiatives announced at the time of our 2016 full year results to improve productivity and these include:

   --     Establishing a labour skills buffer; 

o Following a successful trial of the labour skills buffer concept during the first quarter of FY2017, a decision has been made to introduce labour buffers to all high producing half levels on Generation 2 shafts during Quarter 2.

   --     Addressing employee absenteeism; 

o This project continues with dedicated teams assigned to each operation to analyse absenteeism trends and to ensure that appropriate action is taken to address the behaviour of employees who repeatedly absent themselves from work.

   --     Introducing a programme aimed at the empowerment of frontline supervisors; and 

o All planning and preparatory work has been completed during Quarter 1 and the roll out of the programme will start at the beginning of February at K3 and Saffy shafts.

-- Implementing the Theory of Constraints framework in order to improve the optimisation of half levels at Generation 2 shafts.

o With the de-bottlenecking exercises mostly completed, the implementation of theory of constraints started during December 2016 with an optimisation crew being deployed to underperforming half level at each Generation 2 shaft.

Processing Operations

Underground milling production in the quarter of 2.4 million tonnes was affected by lower than planned ore availability from the mining operations and was 10.0% lower than in the prior year period.

Underground milled head grade at 4.56 grammes per tonnes (5PGE+Au) increased by 2.0% when compared to the 4.47 grammes per tonne achieved in the prior year period and the overall milled head grade was also 4.56 grammes per tonne, up 2.4% on the prior year period, due to improved ore mix and also better mining head grades.

Concentrator recoveries in the quarter remained excellent at 87.0%, marginally up from 86.8% in the prior year period.

Platinum production (Metals-in-Concentrate) was 152,925 ounces, which was 8.4% lower than the prior year period and PGM production (Metals-in-Concentrate) was 292,726, which was 8.6% lower than the prior year period as relatively, we milled more than we mined in the prior year period.

Total refined Platinum production of 137,123 ounces in the first quarter, was 20.0% lower than the prior year period. There were no refined platinum ounces from the smelter clean-up project in both periods. Total PGMs produced were 263,283 ounces, a decrease of 20.5% on the prior year period.

Sales and Pricing

Platinum sales for the quarter were 134,954 ounces, 10.3% lower than the prior year period sales of 150,420 ounces as a result of the lower mined tonnes. PGM sales were 289,962 ounces, marginally down (0.2%) on the prior year period sales of 290,475; there was a release of built up stocks of Ruthenium, as a result of a change in the Ruthenium refining process. In addition, converse to Q1 2016, the Palladium to other metal sales ratio was brought in line with the normal production ratio which cushioned the impact of the decrease on PGM sales down.

The increased sales of Ruthenium in the quarter had an adverse impact on the basket price. As such, the US Dollar basket price (including base metal revenue) at $739 per ounce during the quarter was down 3.8% on Q1 2016 while the corresponding Rand basket price of R10,372 per ounce was 4.5% lower than the Q1 2016. Since the period end, Ruthenium sales have returned to normalised levels.

The average Rand to US Dollar exchange rate was 2.3% stronger at 13.90 compared to 14.22 in Q1 2016.

Business and Operating Environment Update

The operating environment has remained challenging as the Company strives to balance the economic, social and environmental imperatives. Management continues to participate in strategic multi-stakeholder engagements to address these challenges.

Unit Costs

The distorting impact of the holidays in December typically results in unit costs peaking in the first quarter of the financial year. An additional public holiday declared in December by the President of The Republic of South Africa extended the Christmas break period in the quarter and impacted production and costs.

Unit costs of R12,296 per PGM ounce were 12.3% higher on the prior year period, in part reflecting the increase in labour costs as set in the multi-year agreement, signed at the end of October 2016, but also reflecting the weak mining performance. As stated at the time of the 2016 Final Results in November 2016, unit costs will remain under pressure until we see a sustained improvement in production throughput from mining. We remain vigilant in containing our costs and continue to work to reduce our operating costs in order to preserve the achievement of our unit cost guidance in the range of R10,800 to R11,300 per PGM ounce for the full financial year.

Capital Expenditure

We are maintaining our focus on Generation 2 shafts but we are reviewing the capital expenditure profile and expect to provide an update in due course.

Balance Sheet and Liquidity

Lonmin is highly geared to PGM prices and at current levels, would not be cash neutral. We continue to proactively manage our cashflows and balance sheet through initiatives such as seeking ways of containing our capital spend.

Net cash at 31 December 2016 was $49 million, after working capital and capital expenditure investment of $106 million during the quarter. The working capital impact is typically greater in the first quarter of our financial year due to the December holidays and the nature of our sales profile, which is weighted towards the second half of our financial year. Total liquidity at 31 December 2016 was $414 million.

Ore Reserves

Operational flexibility was preserved with the immediately available ore reserve position of 3.7 million square metres at the end of the quarter, or 22 months average production.

Excess Processing Facility Initiatives

Our processing facilities have excess capacity and we are continuing with various initiatives to fill the pipeline and utilise the excess capacity.

Pandora Acquisition Update

On 11 November 2016, we announced that Lonmin had reached agreement to acquire Anglo American Platinum's 42.5% interest in the Pandora Joint Venture. Since then we have received Northam's consent for this transaction and have submitted the Merger Notification to the Competition Authorities and requisite application for section 11 consent to the DMR. We expect the transaction to complete in late 2017.

FTSE4Good Index Series

Lonmin is pleased to advise that it has been confirmed a constituent of the FTSE4Good Index Series and FTSE Russell ESG Rating following the review of our strong environmental, social and governance practices.

Outlook and Guidance

We have been disappointed by the Quarter 1 production at our Generation 2 shafts. With the initiative of deploying additional stoping and vamping crews, as well as the expected Platinum ounces from the smelter clean-up project, our sales guidance for the 2017 full year is maintained at between 650,000 and 680,000 Platinum ounces. At this stage we still expect unit costs to remain in the range of R10,800 to R11,300 per PGM ounce for the full year subject to seeing sustained improvement in production during the year. We will be reviewing our capital expenditure and will provide an update on guidance in due course.

-S -

ENQUIRIES

Investors / Analysts:

 
Tanya Chikanza (Head of Investor   +27 11 218 8358 / +44 207 
 Relations)                         201 6007 
Andrew Mari (Investor Relations 
 Manager)                          +27 11 218 8420 
 

Media:

 
Wendy Tlou                        +27 83 301 9663 
Anthony Cardew / Emma Crawshaw, 
 Cardew Group                     +44 207 930 0777 
 

Notes to editors

Lonmin, which is listed on both the London Stock Exchange and the Johannesburg Stock Exchange, is one of the world's largest primary producers of PGMs. These metals are essential for many industrial applications, especially catalytic converters for internal combustion engine emissions, as well as their widespread use in jewellery.

Lonmin's operations are situated in the Bushveld Igneous Complex in South Africa, where more than 70% of known global PGM resources are found.

The Company creates value for shareholders through mining, refining and marketing PGMs and has a vertically integrated operational structure - from mine to market. Underpinning the operations is the Shared Services function which provides high quality levels of support and infrastructure across the operations.

For further information, please visit our website: http://www.lonmin.com

 
                                                                           3 months   3 months 
                                                                              to 31      to 31 
                                                                                Dec        Dec 
                                                                               2016       2015 
  ------------                                                            ---------  --------- 
 Tonnes          Generation 
  mined(1)        2                       K3 Shaft                   kt         590        684 
     Rowland Shaft                                kt                            424        387 
     Saffy Shaft                                  kt                            493        497 
     4B Shaft                                     kt                            336        376 
     Generation 2                                 kt                          1 842      1 944 
    ------------------------  ------------------------------------------  ---------  --------- 
    Generation 
     1                       1B Shaft                         kt                             6 
     Hossy Shaft                                  kt                            171        159 
     Newman Shaft                                 kt                             23        132 
     W1 Shaft                                     kt                             39         47 
     East 1 Shaft                                 kt                             31         30 
     East 2 Shaft                                 kt                             67         77 
     East 3 Shaft                                 kt                             17          6 
     Pandora (100%)(2)                            kt                            102        118 
     Generation 1                                 kt                            450        575 
    ------------------------  ------------------------------------------  ---------  --------- 
     Total underground                            kt                          2 292      2 519 
     Opencast                                     kt                             38          7 
    ------------------------  ------------------------------------------  ---------  --------- 
                             Total Tonnes Mined 
    Lonmin (100%)             (100%)                          kt              2 330      2 526 
     % tonnes mined from 
      UG2 reef (100%)                              %                          74.9%      76.0% 
    ------------------------  ------------------------------------------  ---------  --------- 
    Lonmin (attributable)    Underground & Opencast           kt              2 279      2 467 
 Ounces          Lonmin excluding                                               141        149 
  Mined(3)        Pandora                 Pt Ounces                  oz         476        658 
    Pandora (100%)           Pt Ounces                        oz              7 112      7 921 
                                                                          ---------  --------- 
                                                                                148        157 
    Lonmin                   Pt Ounces                        oz                588        579 
    Lonmin excluding                                                            270        287 
     Pandora                 PGM Ounces                       oz                638        744 
    Pandora (100%)           PGM Ounces                       oz             14 067     15 558 
                                                                          ---------  --------- 
                                                                                284        303 
    Lonmin                   PGM Ounces                       oz                705        303 
   -----------------------  ------------------------  ------------------  ---------  --------- 
 Tonnes 
 milled(4)       Marikana                 Underground                kt       2 277      2 524 
     Opencast                                     kt                             11         31 
     Total                                        kt                          2 288      2 555 
    Pandora(5)               Underground                      kt                102        118 
                                                                          ---------  --------- 
    Lonmin Platinum          Underground                      kt              2 378      2 642 
        Milled head grade(6)                      g/t                          4.56       4.47 
            Recovery rate(7)                       %                          87.1%      86.8% 
     Opencast                                     kt                             11         31 
        Milled head grade(6)                      g/t                          4.47       2.71 
            Recovery rate(7)                       %                          62.5%      84.2% 
     Total                                        kt                          2 390      2 673 
        Milled head grade(6)                      g/t                          4.56       4.45 
            Recovery rate(7)                       %                          87.0%      86.8% 
    ------------------------  ------------------------------------------  ---------  --------- 
 
 
                                                             3 months   3 months 
                                                                to 31      to 31 
                                                                  Dec        Dec 
                                                                 2016       2015 
  -----------------  -----------------  ------------  ----  ---------  --------- 
 Metals-in-                                                       145        157 
 concentrate(8)       Marikana           Platinum      oz         211        873 
------------------- 
     Palladium                       oz                        66 662     73 936 
 
     Gold                            oz                         3 695      3 718 
     Rhodium                         oz                        20 477     22 912 
     Ruthenium                       oz                        34 567     37 021 
     Iridium                         oz                         7 098      7 157 
                                                                  277        302 
     Total PGMs                      oz                           709        616 
     Nickel(9)                       MT                           739        822 
     Copper(9)                       MT                           461        501 
    ------------  ---------------------------------------- 
    Pandora            Platinum               oz                7 112      7 921 
     Palladium                       oz                         3 358      3 704 
     Gold                            oz                            50         22 
     Rhodium                         oz                         1 196      1 328 
     Ruthenium                       oz                         1 947      2 164 
     Iridium                         oz                           404        420 
     Total PGMs                      oz                        14 067     15 558 
     Nickel(9)                       MT                            14         22 
     Copper(9)                       MT                             6          8 
    ------------  ----------------------------------------  ---------  --------- 
    Concentrate        Platinum               oz                  603      1 160 
    Purchases          Palladium              oz                  164        376 
     Gold                            oz                             2          3 
     Rhodium                         oz                            58        149 
     Ruthenium                       oz                            99        215 
     Iridium                         oz                            24         60 
     Total PGMs                      oz                           950      1 962 
     Nickel(9)                       MT                             0          1 
     Copper(9)                       MT                             0          1 
    ------------  ----------------------------------------  ---------  --------- 
                                                                  152        166 
    Lonmin Platinum    Platinum               oz                  925        953 
     Palladium                       oz                        70 184     78 016 
     Gold                            oz                         3 746      3 743 
     Rhodium                         oz                        21 731     24 389 
     Ruthenium                       oz                        36 613     39 399 
     Iridium                         oz                         7 526      7 637 
                                                                  292        320 
     Total PGMs                      oz                           726        137 
     Nickel(9)                       MT                           753        844 
     Copper(9)                       MT                           467        511 
    ------------  ----------------------------------------  ---------  --------- 
 
 
                                                        3 months   3 months 
                                                           to 31      to 31 
                                                             Dec        Dec 
                                                            2016       2015 
  -------------  ----------------  ------------  ----  ---------  --------- 
                  Lonmin refined 
 Refined           metal                                   136      170 
 Production        production       Platinum      oz        102      931 
                 ---------------- 
     Palladium                     oz                     61 721     77 782 
 
     Gold                          oz                      3 190      4 859 
     Rhodium                       oz                     21 646     30 303 
     Ruthenium                     oz                     31 892     35 450 
     Iridium                       oz                      7 199     10 936 
                                                             261        330 
     Total PGMs                    oz                        751        261 
    ------------  -----------------------------------  ---------  --------- 
    Toll refined 
     metal 
     production       Platinum             oz              1 021        510 
   ---------------- 
     Palladium                     oz                        189        197 
 
     Gold                          oz                          7          9 
     Rhodium                       oz                         68         60 
     Ruthenium                     oz                        234        222 
     Iridium                       oz                         14         36 
     Total PGMs                    oz                      1 532      1 033 
    ------------  -----------------------------------  ---------  --------- 
                  Total 
                   refined                                   137        171 
                   PGMs             Platinum      oz         123        441 
                 ---------------- 
     Palladium                     oz                     61 910     77 978 
 
     Gold                          oz                      3 197      4 868 
     Rhodium                       oz                     21 714     30 364 
     Ruthenium                     oz                     32 126     35 672 
     Iridium                       oz                      7 212     10 972 
                                                             263        331 
     Total PGMs                    oz                        283        294 
    ------------  -----------------------------------  ---------  --------- 
    Base metals       Nickel(10)           MT                715        990 
     Copper(10)                    MT                        354        549 
    ------------  -----------------------------------  ---------  --------- 
                  Refined 
                   metal                                     134        150 
 Sales             sales            Platinum      oz         954        420 
                 ---------------- 
     Palladium                     oz                     60 060     62 332 
 
     Gold                          oz                      2 889      4 714 
     Rhodium                       oz                     26 130     35 195 
     Ruthenium                     oz                     59 016     29 157 
     Iridium                       oz                      6 913      8 656 
                                                             289        290 
     Total PGMs                    oz                        962        475 
    ------------  -----------------------------------  ---------  --------- 
     Nickel(10)                    MT                        928      1 071 
     Copper(10)                    MT                        215        406 
                                                             385        438 
     Chrome(10)                    MT                        496        717 
    ------------  -----------------------------------  ---------  --------- 
 
 
                                                                         3 months       3 months 
                                                                            to 31          to 31 
                                                                              Dec            Dec 
                                                                             2016           2015 
 ------------   -----------------------------   ------------------  -------------  ------------- 
 Average 
 prices          Platinum                                   $/oz              945            886 
    Palladium                                         $/oz                    687            586 
    Gold                                                      $/oz          1 154          1 323 
    Rhodium                                                   $/oz            730            715 
    $ basket excl. by-product 
     revenue(11)                                              $/oz            683            711 
    $ basket incl. by-product 
     revenue(12)                                              $/oz            739            769 
    R basket excl. by-product 
     revenue(11)                                              R/oz          9 624         10 055 
    R basket incl. by-product 
     revenue(12)                                              R/oz         10 372         10 859 
   -----------------------------------  -------------               -------------  ------------- 
    Nickel(10)                                                $/MT          8 989          7 292 
    Copper(10)                                                $/MT          5 411          4 700 
   -----------------------------------  -------------               -------------  ------------- 
                 Cost of production per 
 Unit Costs       PGM ounce                                 ZAR/oz         12 296         10 948 
--------------  -----------------------------------  -------------  -------------  ------------- 
 Exchange 
  Rates          Average rate for period(13)                   R/$          13.90          14.22 
                 Closing rate                                  R/$          13.73          15.46 
--------------  -----------------------------------  -------------  -------------  ------------- 
 
 

Notes

1. Reporting of shafts are in line with our operating strategy for Generation 1 and Generation 2 shafts.

2. Pandora underground tonnes mined represents 100% of the total tonnes mined on the Pandora joint venture of which 42.5% for October and November 2014 and 50% thereafter is attributable to Lonmin.

3. Ounces mined have been calculated at achieved concentrator recoveries and with Lonmin standard downstream processing recoveries to present produced saleable ounces.

   4.     Tonnes milled exclude slag milling. 

5. Lonmin purchases 100% of the ore produced by the Pandora joint venture for onward processing which is included in downstream operating statistics.

6. Head Grade is the grammes per tonne (5PGE + Au) value contained in the tonnes milled and fed into the concentrator from the mines (excludes slag milled).

7. Recovery rate in the concentrators is the total content produced divided by the total content milled (excluding slag).

8. Metals-in-concentrate have been calculated at Lonmin standard downstream processing recoveries to present produced saleable ounces.

   9.     Corresponds to contained base metals in concentrate. 

10. Nickel is produced and sold as nickel sulphate crystals or solution and the volumes shown correspond to contained metal. Copper is produced as refined product but typically at LME grade C. Chrome is produced in the form of chromite concentrate and volumes shown are in the form of chromite.

11. Basket price of PGMs is based on the revenue generated in Rand and Dollar from the actual PGMs (5PGE + Au) sold in the period based on the appropriate Rand / Dollar exchange rate applicable for each sales transaction.

12. As per note 11 but including revenue from base metals.

13. Exchange rates are calculated using the market average daily closing rate over the course of the period.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLDGGDBCUDBGRU

(END) Dow Jones Newswires

January 26, 2017 02:00 ET (07:00 GMT)

1 Year Lonmin Chart

1 Year Lonmin Chart

1 Month Lonmin Chart

1 Month Lonmin Chart

Your Recent History

Delayed Upgrade Clock