We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Landore Resources Limited | LSE:LND | London | Ordinary Share | GG00BMX4VR69 | ORD NPV |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.05 | -1.85% | 2.65 | 2.50 | 2.80 | 2.70 | 2.65 | 2.70 | 474,035 | 09:13:03 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
Gold Ores | 0 | -1.86M | -0.0153 | -1.73 | 3.23M |
TIDMLND
RNS Number : 8965Q
Landore Resources Limited
18 September 2017
LANDORE RESOURCES LIMITED
("Landore Resources" or "the Company")
(AIM Ticker: LND.L)
DRILLING CONFIRMS GOLD ALONG TREND OF
BAM EAST GOLD DEPOSIT
JUNIOR LAKE PROPERTY
London, United Kingdom - 18 September 2017 - Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") is pleased to provide this progress report on extension drilling of the BAM East Gold Project on its Junior Lake Property, Ontario, Canada ("BAM East Gold Project").
Highlights:
-- Drilling at the original BAM Zone has successfully identified a potential resource with similar lithology and grades to the BAM East Gold Deposit located 1000 metres along strike to the east. The original BAM Zone mineralisation remains open along strike to the east, west and down dip.
-- Step out drilling along strike from the BAM East Gold Deposit has extended the mineralisation with similar lithology and grades 100 metres West and 500 metres to the East giving a potential resource continuity of 1.2 kilometres from 2000E to 3200E. The BAM East Gold mineralisation remains open along strike to the east, west and down dip.
BAM East Gold Project Area
http://www.rns-pdf.londonstockexchange.com/rns/8965Q_-2017-9-15.pdf
See website www.landore.com to enlarge.
Drilling results include the following:
Original BAM Zone
Easting Northing Drill-hole From Interval* Au -------- --------- ----------- ------- ---------- ------ No Metres Metres g/t -------- --------- ----------- ------- ---------- ------ 1000E 400N 0416-551 111.40 2.40 2.65 -------- --------- ----------- ------- ---------- ------ 1000E 450E 0417-573 52.80 4.01 1.16 -------- --------- ----------- ------- ---------- ------ 1000E 550N 0417-580 75.62 10.02 0.65 -------- --------- ----------- ------- ---------- ------ 1050E 450N 0417-581 31.60 1.00 3.26 -------- --------- ----------- ------- ---------- ------ and 44.60 1.00 27.50 -------- --------- ----------- ------- ---------- ------ and 51.50 12.93 0.73 -------- --------- ----------- ------- ---------- ------ 1050E 400N 0417-583 112.92 11.95 0.44 -------- --------- ----------- ------- ---------- ------ 1100E 400N 0417-585 95.35 21.15 0.91 -------- --------- ----------- ------- ---------- ------ 1100E 350N 0417-586 162.60 0.57 9.43 -------- --------- ----------- ------- ---------- ------ and 171.46 7.84 1.64 -------- --------- ----------- ------- ---------- ------
Drilling results not previously reported include the following
BAM East Gold-Eastern Extension
Easting Northing Drill-hole From Interval* Au -------- --------- ----------- ------- ---------- ------ No Metres Metres g/t -------- --------- ----------- ------- ---------- ------ 2850E 25S 0417-600 13.00 13.00 0.59 -------- --------- ----------- ------- ---------- ------ and 89.70 7.87 2.48 -------- --------- ----------- ------- ---------- ------ including 91.70 1.00 14.90 -------- --------- ----------- ------- ---------- ------ 2950E 50S 0417-607 9.72 10.28 0.93 -------- --------- ----------- ------- ---------- ------ 2950E 100S 0417-615 125.00 13.00 1.02 -------- --------- ----------- ------- ---------- ------ 3000E 50S 0417-609 15.68 15.92 0.43 -------- --------- ----------- ------- ---------- ------ 3000E 100S 0417-611 132.40 8.45 0.68 -------- --------- ----------- ------- ---------- ------ 3200E 150S 0417-589 45.26 7.52 0.51 -------- --------- ----------- ------- ---------- ------ 3200E 200S 0417-591 112.50 8.80 0.81 -------- --------- ----------- ------- ---------- ------ and 126.08 5.32 1.14 -------- --------- ----------- ------- ---------- ------
* All holes were drilled at 45 degrees into a lithological package dipping approximately 40 degrees to the south. The actual true thickness of mineralisation is estimated to represent approximately 90% of the intervals shown in the above table.
Results are pending for two drill holes at 3500E.
Original BAM Zone:
The BAM Zone was discovered in 2003 by Landore Resources' exploration team through routine outcrop sampling returning high grade gold from a narrow pyrite and arsenopyrite mineralised vein. A subsequent six drill hole programme accompanied by trenching was completed. Results were not encouraging with the best intersection 2.6g/t Au over 0.8m.
A further 4 drill hole programme was conducted on the BAM Zone in 2005 with similar results.
The discovery of the BAM East Gold Deposit in late 2015 led to a re-assessment of the BAM Zone which is located just to the north and at the western end of the MaxMin geophysical anomaly (MM-7). This anomaly is present in the lithology of the BAM East Gold Zone and is used as a drill pathfinder.
Two drill holes drilled in late 2016 approximately 150 metres to the south of BAM Zone intersected similar lithology and mineralisation as the BAM East Gold Deposit. Step out drilling in the recently concluded campaign consistently intersected mineralisation with grades similar to the BAM East Gold Deposit. Indications are that the mineralisation is improving to the east.
A follow up drill programme is currently being planned to commence in winter 2017 to expand the BAM Zone both to the east, west and down dip with the aim of delineating a separate open pit deposit and to test the area to join with the BAM East Gold Deposit.
BAM East Gold Deposit-Eastern Extension:
Step out drilling on a 50m x 50m pattern has established continuity of gold mineralisation, including down dip, from the eastern limit of the defined BAM East Gold Deposit at 2700E, 300 metres further east to 3000E with a further step out of 200m to 3200E. A two drill hole fence was also drilled at 3500E with results pending. The mineralisation is open to the east and down dip.
A follow up drill programme is being planned to commence in winter 2017 aimed at extending the drill pattern to the east and down dip to 4000E in the vicinity of a highly promising geological SE/NW fault which cuts the MM-7 MaxMin geophysical anomaly.
BAM East Gold Resource:
Discovered in December 2015, the BAM East Gold resource contains 301,000 ounces of gold (February 2017 National Instrument (NI) 43-101 Mineral Resource Estimate and Technical Report). This resource is located approximately midway along a 2.7 kilometre long, east-southeast to west-northwest trending MaxMin geophysical anomaly (MM-7), at the western end of which is located the historical BAM gold zone discovered by Landore Resources in 2003.
BAM East gold mineralisation is a typical shear hosted gold bearing system in an Archaean greenstone belt. Findings from exploration drilling have revealed a lithological sequence consisting of leucogabbro rocks of the Grassy Pond Sill to the south, metasedimentary rocks in the central portion, to mafic volcanics to the north. All lithological units have been subjected to variable shearing and deformation, markedly the metasedimentary unit.
The gold mineralisation revealed to-date is predominantly contained in the metasediments, with some gold mineralisation occurring in the leucogabbro rocks. Visible gold occurs within or near quartz veinlets which are controlled by a shear system.
Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101 and the AIM Rules for Companies, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.
- ENDS -
About Landore Resources
Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Project. Landore Resources has mineral rights to 5 properties in eastern Canada. The Company is headquartered in Guernsey, with an exploration office located in Thunder Bay, Ontario, Canada.
For more information, please contact:
Bill Humphries, Chief Executive Officer Tel: 07734 681262 Richard Prickett, Finance Director Tel: 07775 651421 Landore Resources Limited www.landore.com
Angela Hallett / James Spinney / Jack Botros Tel: 020 7409 3494
Strand Hanson Limited
Nominated Advisor and Broker
This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No 596/2014.
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLUVARRBWAKAAR
(END) Dow Jones Newswires
September 18, 2017 02:00 ET (06:00 GMT)
1 Year Landore Resources Chart |
1 Month Landore Resources Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions