ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

KIBO Kibo Energy Plc

0.0375
0.00 (0.00%)
Last Updated: 08:00:04
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Kibo Energy Plc LSE:KIBO London Ordinary Share IE00B97C0C31 ORD EUR0.0001 (CDI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.0375 0.035 0.04 0.0375 0.036 0.04 0.00 08:00:04
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 1.04M -9.78M -0.0026 -0.15 1.51M
Kibo Energy Plc is listed in the Gold Ores sector of the London Stock Exchange with ticker KIBO. The last closing price for Kibo Energy was 0.04p. Over the last year, Kibo Energy shares have traded in a share price range of 0.0325p to 0.085p.

Kibo Energy currently has 3,779,866,683 shares in issue. The market capitalisation of Kibo Energy is £1.51 million. Kibo Energy has a price to earnings ratio (PE ratio) of -0.15.

Kibo Energy Share Discussion Threads

Showing 46626 to 46643 of 62100 messages
Chat Pages: Latest  1872  1871  1870  1869  1868  1867  1866  1865  1864  1863  1862  1861  Older
DateSubjectAuthorDiscuss
23/6/2017
22:47
UKIS 2017 KIBO NotesPolicy Changes -Can you explain the difference between the Tanzanian Energy and Policy Procurement Review that is underway, as per the recent presentation and the MEM Policy Review that is completed as per 23/3/17 RNS?These are two completely diffrent reviews. It's hard to put a linear %, in terms of how much of the TEPPR is completed but it's believed the main components have been completed and these aren't really a dealing factor to the ultimate delivery of the project. There is a gazetting process to ensure any changes don't conflict with any other laws etc before being made official.In your assessment how long will the Tanzainan Energy And Policy Procurement Review take to complete?Unable to accurately say but see above that the main bulk of the work has been completed already. So we should be on the home straight.As discussed last year, can you tell me of which, if either, KIBO have had direct input too?Yes they have had input into both of these. Therefore, I read they must have reasonable knowledge of the processes and there shaping of the future.Overall how do you expect all policy changes to benefit the MCPP?Kibo will be benefit for a more robust, solid and sustainable set of rules within the overall framework of reliability within Tanzania. I.e it will ensure all payments etc will be made as agreed which is important for a project like the MCPP which is going to, run for over 25 years.ESIA -What does the ESIA Certification process involve?Literally just a final check and a signing off process. There could be the odd question that may come back to KIBO or a confirmation of certain elements but basically it is what it is, a signing up process.Given the timelines for ESIA certification acquired by other companies, the ESIA certification for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Yes KIBO are awaiting this to drop anytime now with nothing else holding this up.SML -Given the timelines for SML approval acquired by other companies, the SML approval for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Again, yes KIBO are awaiting this to drop anytime now with nothing else holding this up.PPA -Given the phrases used in the RNS of the 23/3/17 of 'ensuring that a final PPA can be concluded ASAP'. Can we verify that preliminary PPA tariffs were applied to the facilitate the production of the IBFS and Financial Model?The conversation quickly negated this section of questions. LC explained that we have no figures to plug in anywhere and this method of thought is the direct opposite to what is actually happening in reality in this process. We are working this completely the other way around. We are saying what the tariff figures should be, driven from the independently produced figures via the feasibility studies completed. We have control and push negotiations to where we want them to be not the other way around. To me, this means we guarantee a profitable outcome for the project. If so, we're these preliminary PPA tarriffs agreed with Tanesco?N/AAgain, and if so, are the accuracy of these tariffs still withstanding given the policy reviews?N/AFC -Can we assume once we have an ESIA, SML and PPA we can advance straight to FC or are there any other workstreams that need completing that will hold up going to FC? Yes, although some parallel work means part of FC can already be in progress. It is possible to call a scenario of being in a Preliminary FC.Are SEPCO bound to pay you the $3.6m on entering FC or at the completion of FC?This will be on competition of FC but this is not seen to cause any problems in anyway.Will there be a news blackout during FC due to its sensitive nature?Once we reach FC, or more accurately on signing the PPA, that is when the real figures and detail can be released. LC seemed to allude on more than one occasion to look at the figures for the coal that you can workout to give a good pointer to the value that lies ahead. Therefore I don't see FC as requiring a suspension or news blackout.MCPP General -How our partners feel about the delays induced by the Government?They seem pretty understanding of the region and it's development. Obviously they have huge budgets and can outside these types of delays, so no issue here.Did Sandersons acquisition of part of the MCPP surprise you, especially vs their usual MO?LC agreed that obviously it isn't there normal line of business and that it probsbly surprised Sandersons themselves more than it did himself when they got so deeply involved. They have made a huge commitment that the believe they will benefit from.Are you any closer to knowing whether the project will be separated or integrated?No comment.What is your gut feel on which route you prefer to go down?No comment.Do you feel a 30% retention as previously alluded to is realistic or had that changed +/-?Yes this is entirely still possible and and therefore valid figure to base any calculations on.When Sandersons took their 2.5% valuing the MCPP at a discounted $100m, what was the agreed discount valued at?Although he couldn't recall the discounted figure he interesting said this value was based only on the figures from the mine. This took me back a touch as it was the complete opposite to what I expected. In fact, it may well, give rise to the fact my recent 25p a share figure for u the mine for each 300MW is too low. It puts it back to being more 35p and discounted at that !!! He must be expecting a much better price than $32.7mt for the coal being sold into the plant, imo.Can you confirm this 2.5% of the MCPP includes the mine. N/AHow does the MEN's statement that 30% of Tanzanian Mining Companies Share holding must be floated on the DSE affect all of our projects especially the MCPP?This would only affect projects that require an SML. Therfore only affect the MCPP. That said, LC was of the opinion that this would in all likelyhood NOT apply to us due to the National Strategic Importance of the project. Make of that, what you will.Can we still expect the MCPP to be spun out ala Katoro?It will either be spun out or in all likelyhood hood, Hanetti will be spun out leaving the MCPP on its own with KIBO.If so at what point would you need to initiate this?N/A. As an aside Noel seemed very excited about Hanetti. I had the feeling more work had been going on there than they have let on possibly.Sandersons -Can you give the exact repayment date of the current 2.9m loan facility?There is no set date and this is a very fluid arrangement. The distinct impressions I got was that there is alot more commitment between all these parties towards eachother than we give them credit for. Sandersons are not there to screw KIBO over for missed dates etc. From what LC said it seems very fluid and flexible. He seemed relaxed to the point of dismissing this as any issue whatsoever.
bionictwat
23/6/2017
20:36
Should be exciting next week at the show with so many answers LC will need to explain.Mine will be " How much longer do you think FC will be or is it a case FC will never transpire " ?Then I will follow up by saying " please be honest and let us know the truth "
rubberdolly
23/6/2017
20:18
This Tadtech guy what an idiot banning posters from his thread
rubberdolly
23/6/2017
19:09
What comes after biOnic says it all!
tcrober1
23/6/2017
18:35
I don't like to read Aimchimp's post- in fact I don't read them - but you do no-one any favours by posting your long response, you just turn off people from reading these threads. It is better to ignore AIMChimp and credit people reading this thread that they have more intellect than you credit them with and can see for themselves what is Aimchimp's agenda.
uknighted
23/6/2017
17:57
Uk knighted when these derampers decide to call it a day

I am just reposting actual questions which were asked to lc via someone else in Apr and his answers I wouldn't call that trashing the threads. Yet you like to read the illiterate ramblings of aim chimp

bi0nictwat
23/6/2017
17:44
UKIS 2017 KIBO NotesPolicy Changes -Can you explain the difference between the Tanzanian Energy and Policy Procurement Review that is underway, as per the recent presentation and the MEM Policy Review that is completed as per 23/3/17 RNS?These are two completely diffrent reviews. It's hard to put a linear %, in terms of how much of the TEPPR is completed but it's believed the main components have been completed and these aren't really a dealing factor to the ultimate delivery of the project. There is a gazetting process to ensure any changes don't conflict with any other laws etc before being made official.In your assessment how long will the Tanzainan Energy And Policy Procurement Review take to complete?Unable to accurately say but see above that the main bulk of the work has been completed already. So we should be on the home straight.As discussed last year, can you tell me of which, if either, KIBO have had direct input too?Yes they have had input into both of these. Therefore, I read they must have reasonable knowledge of the processes and there shaping of the future.Overall how do you expect all policy changes to benefit the MCPP?Kibo will be benefit for a more robust, solid and sustainable set of rules within the overall framework of reliability within Tanzania. I.e it will ensure all payments etc will be made as agreed which is important for a project like the MCPP which is going to, run for over 25 years.ESIA -What does the ESIA Certification process involve?Literally just a final check and a signing off process. There could be the odd question that may come back to KIBO or a confirmation of certain elements but basically it is what it is, a signing up process.Given the timelines for ESIA certification acquired by other companies, the ESIA certification for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Yes KIBO are awaiting this to drop anytime now with nothing else holding this up.SML -Given the timelines for SML approval acquired by other companies, the SML approval for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Again, yes KIBO are awaiting this to drop anytime now with nothing else holding this up.PPA -Given the phrases used in the RNS of the 23/3/17 of 'ensuring that a final PPA can be concluded ASAP'. Can we verify that preliminary PPA tariffs were applied to the facilitate the production of the IBFS and Financial Model?The conversation quickly negated this section of questions. LC explained that we have no figures to plug in anywhere and this method of thought is the direct opposite to what is actually happening in reality in this process. We are working this completely the other way around. We are saying what the tariff figures should be, driven from the independently produced figures via the feasibility studies completed. We have control and push negotiations to where we want them to be not the other way around. To me, this means we guarantee a profitable outcome for the project. If so, we're these preliminary PPA tarriffs agreed with Tanesco?N/AAgain, and if so, are the accuracy of these tariffs still withstanding given the policy reviews?N/AFC -Can we assume once we have an ESIA, SML and PPA we can advance straight to FC or are there any other workstreams that need completing that will hold up going to FC? Yes, although some parallel work means part of FC can already be in progress. It is possible to call a scenario of being in a Preliminary FC.Are SEPCO bound to pay you the $3.6m on entering FC or at the completion of FC?This will be on competition of FC but this is not seen to cause any problems in anyway.Will there be a news blackout during FC due to its sensitive nature?Once we reach FC, or more accurately on signing the PPA, that is when the real figures and detail can be released. LC seemed to allude on more than one occasion to look at the figures for the coal that you can workout to give a good pointer to the value that lies ahead. Therefore I don't see FC as requiring a suspension or news blackout.MCPP General -How our partners feel about the delays induced by the Government?They seem pretty understanding of the region and it's development. Obviously they have huge budgets and can outside these types of delays, so no issue here.Did Sandersons acquisition of part of the MCPP surprise you, especially vs their usual MO?LC agreed that obviously it isn't there normal line of business and that it probsbly surprised Sandersons themselves more than it did himself when they got so deeply involved. They have made a huge commitment that the believe they will benefit from.Are you any closer to knowing whether the project will be separated or integrated?No comment.What is your gut feel on which route you prefer to go down?No comment.Do you feel a 30% retention as previously alluded to is realistic or had that changed +/-?Yes this is entirely still possible and and therefore valid figure to base any calculations on.When Sandersons took their 2.5% valuing the MCPP at a discounted $100m, what was the agreed discount valued at?Although he couldn't recall the discounted figure he interesting said this value was based only on the figures from the mine. This took me back a touch as it was the complete opposite to what I expected. In fact, it may well, give rise to the fact my recent 25p a share figure for u the mine for each 300MW is too low. It puts it back to being more 35p and discounted at that !!! He must be expecting a much better price than $32.7mt for the coal being sold into the plant, imo.Can you confirm this 2.5% of the MCPP includes the mine. N/AHow does the MEN's statement that 30% of Tanzanian Mining Companies Share holding must be floated on the DSE affect all of our projects especially the MCPP?This would only affect projects that require an SML. Therfore only affect the MCPP. That said, LC was of the opinion that this would in all likelyhood NOT apply to us due to the National Strategic Importance of the project. Make of that, what you will.Can we still expect the MCPP to be spun out ala Katoro?It will either be spun out or in all likelyhood hood, Hanetti will be spun out leaving the MCPP on its own with KIBO.If so at what point would you need to initiate this?N/A. As an aside Noel seemed very excited about Hanetti. I had the feeling more work had been going on there than they have let on possibly.Sandersons -Can you give the exact repayment date of the current 2.9m loan facility?There is no set date and this is a very fluid arrangement. The distinct impressions I got was that there is alot more commitment between all these parties towards eachother than we give them credit for. Sandersons are not there to screw KIBO over for missed dates etc. From what LC said it seems very fluid and flexible. He seemed relaxed to the point of dismissing this as any issue whatsoever.
bionictwat
23/6/2017
17:34
Divmad you need to grow up sunshine
rubberdolly
23/6/2017
17:32
Where are you supposed to look at someone if you're not looking them in the eye ?Do you want him to look down at you're trouser department or turn his head backwards ?Ridiculous comments coming from the clappers.I bet none of you know what colour eyes LC has.
rubberdolly
23/6/2017
17:28
AIMChimp = dross
divmad
23/6/2017
17:26
What need I have to look Coatee in the eye? I can see from here what there is to see, you think you can tell more from someone and know what they have in store from their eye? To see this true you must be mad. I see on the LSE this Wimbledon say he trust Coatee as he look in his eye I say he a fool for that and will cost dearly when the time come. I already ask question and question and go unasnwer you think he will answer straight
aimchimp
23/6/2017
17:06
Bionic you are singlehandedly trashing these threads. When will you grow up?
uknighted
23/6/2017
17:01
UKIS 2017 KIBO NotesPolicy Changes -Can you explain the difference between the Tanzanian Energy and Policy Procurement Review that is underway, as per the recent presentation and the MEM Policy Review that is completed as per 23/3/17 RNS?These are two completely diffrent reviews. It's hard to put a linear %, in terms of how much of the TEPPR is completed but it's believed the main components have been completed and these aren't really a dealing factor to the ultimate delivery of the project. There is a gazetting process to ensure any changes don't conflict with any other laws etc before being made official.In your assessment how long will the Tanzainan Energy And Policy Procurement Review take to complete?Unable to accurately say but see above that the main bulk of the work has been completed already. So we should be on the home straight.As discussed last year, can you tell me of which, if either, KIBO have had direct input too?Yes they have had input into both of these. Therefore, I read they must have reasonable knowledge of the processes and there shaping of the future.Overall how do you expect all policy changes to benefit the MCPP?Kibo will be benefit for a more robust, solid and sustainable set of rules within the overall framework of reliability within Tanzania. I.e it will ensure all payments etc will be made as agreed which is important for a project like the MCPP which is going to, run for over 25 years.ESIA -What does the ESIA Certification process involve?Literally just a final check and a signing off process. There could be the odd question that may come back to KIBO or a confirmation of certain elements but basically it is what it is, a signing up process.Given the timelines for ESIA certification acquired by other companies, the ESIA certification for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Yes KIBO are awaiting this to drop anytime now with nothing else holding this up.SML -Given the timelines for SML approval acquired by other companies, the SML approval for KIBO should be imminent. Is there anything else that is holding this up i.e hanging on outstanding policy changes and should we expect this any day now, by that reasoning?Again, yes KIBO are awaiting this to drop anytime now with nothing else holding this up.PPA -Given the phrases used in the RNS of the 23/3/17 of 'ensuring that a final PPA can be concluded ASAP'. Can we verify that preliminary PPA tariffs were applied to the facilitate the production of the IBFS and Financial Model?The conversation quickly negated this section of questions. LC explained that we have no figures to plug in anywhere and this method of thought is the direct opposite to what is actually happening in reality in this process. We are working this completely the other way around. We are saying what the tariff figures should be, driven from the independently produced figures via the feasibility studies completed. We have control and push negotiations to where we want them to be not the other way around. To me, this means we guarantee a profitable outcome for the project. If so, we're these preliminary PPA tarriffs agreed with Tanesco?N/AAgain, and if so, are the accuracy of these tariffs still withstanding given the policy reviews?N/AFC -Can we assume once we have an ESIA, SML and PPA we can advance straight to FC or are there any other workstreams that need completing that will hold up going to FC? Yes, although some parallel work means part of FC can already be in progress. It is possible to call a scenario of being in a Preliminary FC.Are SEPCO bound to pay you the $3.6m on entering FC or at the completion of FC?This will be on competition of FC but this is not seen to cause any problems in anyway.Will there be a news blackout during FC due to its sensitive nature?Once we reach FC, or more accurately on signing the PPA, that is when the real figures and detail can be released. LC seemed to allude on more than one occasion to look at the figures for the coal that you can workout to give a good pointer to the value that lies ahead. Therefore I don't see FC as requiring a suspension or news blackout.MCPP General -How our partners feel about the delays induced by the Government?They seem pretty understanding of the region and it's development. Obviously they have huge budgets and can outside these types of delays, so no issue here.Did Sandersons acquisition of part of the MCPP surprise you, especially vs their usual MO?LC agreed that obviously it isn't there normal line of business and that it probsbly surprised Sandersons themselves more than it did himself when they got so deeply involved. They have made a huge commitment that the believe they will benefit from.Are you any closer to knowing whether the project will be separated or integrated?No comment.What is your gut feel on which route you prefer to go down?No comment.Do you feel a 30% retention as previously alluded to is realistic or had that changed +/-?Yes this is entirely still possible and and therefore valid figure to base any calculations on.When Sandersons took their 2.5% valuing the MCPP at a discounted $100m, what was the agreed discount valued at?Although he couldn't recall the discounted figure he interesting said this value was based only on the figures from the mine. This took me back a touch as it was the complete opposite to what I expected. In fact, it may well, give rise to the fact my recent 25p a share figure for u the mine for each 300MW is too low. It puts it back to being more 35p and discounted at that !!! He must be expecting a much better price than $32.7mt for the coal being sold into the plant, imo.Can you confirm this 2.5% of the MCPP includes the mine. N/AHow does the MEN's statement that 30% of Tanzanian Mining Companies Share holding must be floated on the DSE affect all of our projects especially the MCPP?This would only affect projects that require an SML. Therfore only affect the MCPP. That said, LC was of the opinion that this would in all likelyhood NOT apply to us due to the National Strategic Importance of the project. Make of that, what you will.Can we still expect the MCPP to be spun out ala Katoro?It will either be spun out or in all likelyhood hood, Hanetti will be spun out leaving the MCPP on its own with KIBO.If so at what point would you need to initiate this?N/A. As an aside Noel seemed very excited about Hanetti. I had the feeling more work had been going on there than they have let on possibly.Sandersons -Can you give the exact repayment date of the current 2.9m loan facility?There is no set date and this is a very fluid arrangement. The distinct impressions I got was that there is alot more commitment between all these parties towards eachother than we give them credit for. Sandersons are not there to screw KIBO over for missed dates etc. From what LC said it seems very fluid and flexible. He seemed relaxed to the point of dismissing this as any issue whatsoever.
bionictwat
23/6/2017
16:50
What need I have to look Coatee in the eye? I can see from here what there is to see, you think you can tell more from someone and know what they have in store from their eye? To see this true you must be mad. I see on the LSE this Wimbledon say he trust Coatee as he look in his eye I say he a fool for that and will cost dearly when the time come. I already ask question and question and go unasnwer you think he will answer straight and true to your face? You shadowed by the trees. You blinded.
aimchimp
23/6/2017
16:50
Oh look. Another newbie pseudonym here. With zero value added.
divmad
23/6/2017
16:44
It will soon be the 29th and then we can all throw wet sponges at LC and ask him why is he not doing his job properly.
rubberdolly
23/6/2017
16:42
AIMChimp,

I bet my bottom dollar that you are too wimpish to go to the UKIS and look LC in the eye, and ask your awkward questions.

Man up or F.Off.

divmad
23/6/2017
16:39
I've looked him in the eye a good few times. Here we go again and be careful if you keep doing that he might think you fancy him or maybe you actually do.Open them eyes and wake up for goodness sake where and what planet do you come from Mr Wimbledon ?You act like a little child you really do.
rubberdolly
Chat Pages: Latest  1872  1871  1870  1869  1868  1867  1866  1865  1864  1863  1862  1861  Older

Your Recent History

Delayed Upgrade Clock