ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

GEO Georgian Mining Corporation

1.40
0.00 (0.00%)
19 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Georgian Mining Corporation LSE:GEO London Ordinary Share VGG9688A1003 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.40 1.30 1.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Georgian Mining Corporation Significant resource upgrade for Kvemo Bolnisi (0559D)

24/04/2017 7:00am

UK Regulatory


Georgian Mining (LSE:GEO)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Georgian Mining Charts.

TIDMGEO

RNS Number : 0559D

Georgian Mining Corporation

24 April 2017

24 April 2017

Georgian Mining Corporation

Significant resource upgrade for Kvemo Bolnisi East

Georgian Mining Corporation ('GEO' or the 'Company') is pleased to announce that an upgraded Mineral Resource Estimate for the Kvemo Bolnisi East ("KB") Copper Zone ('Copper Zone 1') has increased the total tonnage of in-situ copper metal by 92% in comparison to the initial estimate announced on 30 January 2017. To view the press release with the illustrative diagrams please use the following link:

http://www.rns-pdf.londonstockexchange.com/rns/0559D_-2017-4-23.pdf

Highlights

-- JORC optimised in-pit 1.2 million tonnes @ 1.03% Cu at a 0.4% Cu cut off triggers the commencement of detailed discussions with the Company's JV partner regarding the delivery of an initial 1Mt @ 1% Cu for toll treatment

-- Total JORC Mineral Resource estimate of 2.22 million tonnes @ 0.8% Cu and 0.1 g/t Au at a 0.3% Cu cut-off

-- GEO is also developing an adjacent mineable gold oxide resource ('Gold Zone 2') with the drilling progressing well

-- New epithermal ore geology model provides exceptional exploration opportunities that previous explorers had not considered - has the potential to deliver both bulk tonnage and high grade zones

-- Future resource expansion programme aims to develop a 50 million tonne resource - further drilling is being planned and target development work is underway on a further 14 advanced brownfield exploration sites within the tenure

GEO Managing Director Greg Kuenzel said, "We are extremely pleased to have met the requirements of our JV partner to achieve early production. Resource drilling to date validates the Board's confidence in its exploration programme and confirms that copper-gold sulphide and gold oxide mineralisation extends well beyond the limits of the original discovery programme. The recent identification of KB's low sulphidation epithermal setting significantly expands our opportunity to explore both bulk tonnage and also high grade gold and copper-gold targets. We have retained Greg Corbett, an internationally renowned specialist on epithermal mineral occurrences, to advise on how best to exploit the significant new opportunities now presented. We are also in the process of establishing an initial gold resource and hope to be in a position to announce this shortly. We believe that this will present us with a similar opportunity to the copper resource for delivering near term, proof of concept production."

Further Information

In terms of the project's development, the Company benefits from its access to processing plants with excess capacity at nearby mines owned by its JV Partner. This offers a short lead time to low opex production which can be achieved with modest capital expenditure. This will benefit the Company by providing the cash flow to help fund future exploration and, most importantly, a proof of concept operation.

GEO is undertaking both copper-gold sulphide and gold oxide mineralisation drill programmes within the KB project area with extraction expected to be from the same open pit or series of satellite pits sharing a common infrastructure. The updated JORC compliant Mineral Resource Estimate for the KB East Copper Zone represents only a small part of a potentially much larger deposit. Recent exploration suggests that the region is similar in terms of geology and probable ore genesis to the large copper-gold breccia pipe or pipes at the nearby Madneuli mine where in excess of 50Mt has been mined to date.

The Company is undertaking a phased approach towards achieving this target:

Phase 1: H1 2017 target to delineate a minimum of 1-2 Mt to support initial spare capacity (now achieved and exceeded)

Phase 2: 2017 target to delineate a 3-5 Mt resource of combined copper-gold sulphide and gold oxide mineralisation (on target)

Phase 3: Long term target - to delineate a resource of 50Mt+

In addition to Copper Zone 1, two gold oxide zones are currently being progressed to provide an initial gold oxide resource for near term production and delivery to the JV partner's neighbouring gold oxide leach plants. This gold oxide resource will be issued on completion of the current drill programme. Notably the gold oxides are located above the level of copper-gold sulphides and can be exploited as part of the necessary stripping to mine the copper-gold sulphides.

Now that the Phase 1 target to develop a 1Mt copper sulphide Resource grading 1% Cu has been achieved and exceeded, the Company will progress its Phase 2 objective of growing the initial Resource to 3 - 5Mt of combined copper-gold sulphide and gold oxide mineralisation as further potential feedstock to its JV partner's operations through a toll treatment arrangement.

Once Phase 2 is complete, and mining of this ore has commenced, the Company will continue exploration to achieve Phase 3 by fully developing the KB breccia pipe with a Madneuli-size target resource. In tandem the Company will ramp up exploration on other priority targets already defined within the JV Licence.

This longer term vision is supported by the fact that recent drilling has established that the Bolnisi district is a classic low sulphidation epithermal gold camp, dispelling the previous understanding that the area is a VMS ( volcanogenic massive sulphide) camp comparable to the Eastern Pontide Belt of neighbouring Turkey. This fits well with the plethora of epithermal Cu-Au deposits found within the highly productive Tethyan Cu-Au Belt which extends into the southern half of Georgia. This offers scope for the occurrence of several styles of mineralisation across a greater vertical extent of volcanic stratigraphy. These range from bulk tonnage copper-gold breccias, where one large or multiple breccia pipes exist in close proximity (this appears to be the case at Madneuli and KB East), to high-grade "bonanza type" epithermal quartz-gold vein mineralisation. Our new epithermal ore geology model provides exceptional exploration opportunities not considered by previous explorers. GEO has now engaged renowned geological consultant Greg Corbett to confirm GEO's new epithermal ore geology model. Mr Corbett made a recent site visit to the Bolnisi JV Project and the Madneuli mine and will provide future guidance to fully exploit this new model through more effective exploration targeting.

Mineral Resource Estimate & Exploration Upside

Mineral Resource

Recent diamond drilling has delineated a JORC Mineral Resource estimate of 2.22 million tonnes @ 0.80% Cu and 0.10g/t Au at a 0.30% Cu cut-off in line with the Company's strategy to achieve Phase 1. GEO will now expand the programme beyond the initial target tonnage to demonstrate that scope exists for a much larger bulk tonnage resource.

Table 1: Kvemo Bolnisi Copper Zone Mineral Resource Update as of end March 2017

 
                        Inferred Resources 
----------  -------  ----------------------- 
 Cut-Off     AZONE     Tonnes      Cu     Au 
                           Kt       %    g/t 
----------  -------  --------  ------  ----- 
 0.3% Cu     CUOX       136     0.96    0.03 
----------  -------  --------  ------  ----- 
  CUVC                  29      0.44    0.03 
 ------------------  --------  ------  ----- 
  HICU                  359     1.07    0.03 
 ------------------  --------  ------  ----- 
  PBCG                 1,702    0.70    0.13 
 ------------------  --------  ------  ----- 
 0.3/t Au    AUOX       106     0.03    0.45 
----------  -------  --------  ------  ----- 
  TOTAL                2,331    0.74    0.12 
 ------------------  --------  ------  ----- 
 

Notes: Historic Reverse Circulation data excluded from grade estimation; Maximum distance of extrapolation = 80m; All resources categorised as Inferred resources; Grade estimation using inverse-distance weighting; Updated wireframes for Polymict Breccia, base-of-oxides and topography. Unconstrained tonnage estimate.

Notable new drill intersections from KB copper zone drill holes include:-

   --     KED 001 - 60.25m @ 1.48% Cu and 0.12g/t Au from 89.75m 
   --     KED 006 - 18.8m @ 1.5% Cu and 0.1g/t Au from 47.0m 
   --     KED 008 - 28.6m @ 1.6% Cu and 0.8g/t Au from 47.4m 
   --     KED 011 - 46.4m @ 2.88% Cu and 0.1g/t Au from 19.6m 

Exploration Upside

Resource drilling to date validates the Board's confidence in its exploration programme and confirms that copper-gold sulphide and gold oxide mineralisation extends well beyond the limits of the original discovery programme. The current surface area of the target defined by a combination of gold and copper-in-soil geochemistry, channel sampling, excavation, geological mapping, ground geophysics, and drilling now extends to an approximate 1km by 1km area, equivalent in size to the current rim of the nearby Madneuli open pit. The extent of copper and gold mineralisation throughout the KB area is indicative of a large well-mineralised system where the Company has to date only tested a small area.

Image 1: Kvemo Bolnisi East Project (see PDF)

Table 2 - Notable Drilling Intersections from Kvemo Bolnisi Copper Zone Drill Programme

 
                                                          Au 
 HOLE ID     From             To       Interval   Cu%      gt 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC074D              0.00    21.00      21.00   -0.10    0.68 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC074D             23.00    30.30       7.30    0.81    0.12 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC074D             43.00    71.00      28.00    0.53    0.56 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC074D             71.00    79.30       8.30   -0.10    0.40 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC074D             79.30    97.00      17.70    0.24    0.31 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC075D             19.00    32.00      13.00    0.38   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC075D             52.00    63.00      11.00    0.38   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC075D             88.00   101.00      13.00    0.46   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KBRC042D             23.00   106.00      83.00    0.73    0.12 
----------  ---------------  -------  ---------  ------  ------ 
 KED001                0.00    31.00      31.00    1.10   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED001               89.75   150.00      60.25    1.48    0.12 
----------  ---------------  -------  ---------  ------  ------ 
 KED002                0.00    14.00      14.00   -0.10    0.28 
----------  ---------------  -------  ---------  ------  ------ 
 KED002               32.00    67.00      35.00    0.37   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED002              128.40   133.00       4.60    0.33   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED002              176.00   185.00       9.00    0.39   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED003                0.00    20.00      20.00   -0.10    0.46 
----------  ---------------  -------  ---------  ------  ------ 
 KED003               21.00    32.00      11.00    0.46    0.19 
----------  ---------------  -------  ---------  ------  ------ 
 KED003               46.50    66.00      19.50    0.85    0.18 
----------  ---------------  -------  ---------  ------  ------ 
 KED004              108.00   134.00      26.00    2.67    0.23 
----------  ---------------  -------  ---------  ------  ------ 
 KED004              221.00   227.00       6.00    0.82   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED005                0.00    11.00      11.00    0.20   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED006                0.00    13.00      13.00    0.38   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED006               17.00    26.00       9.00    0.25   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED006               47.00    65.80      18.80    1.50   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED007               11.00    17.00       6.00    1.83   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED007               96.00   114.00      18.00    0.56   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED007              118.00   131.00      13.00    0.30   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED008               22.00    44.00      22.00    0.45   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED008               47.40    76.00      28.60    1.60    0.80 
----------  ---------------  -------  ---------  ------  ------ 
 KED008               87.00   123.60      36.60    0.39   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED008              141.00   167.00      26.00    0.25    0.16 
----------  ---------------  -------  ---------  ------  ------ 
 KED009               89.00    99.00      10.00    0.30   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED009              103.00   108.00       5.00    0.30   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED010               64.10    69.00       4.90    0.41   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED011               19.60    66.00      46.40    2.88   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED011               75.80   117.00      41.20    1.18    0.13 
----------  ---------------  -------  ---------  ------  ------ 
 KED011              123.00   132.10       9.10    1.18   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED012                58.4       70       11.6    0.42   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED013                  38       42          4    0.31   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED014               109.4      149       39.6    0.37   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED015                 5.9       16       10.1    0.33   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED015                24.7       45       20.3    0.90    0.15 
----------  ---------------  -------  ---------  ------  ------ 
 KED015                69.2       79        9.8    0.88    0.18 
----------  ---------------  -------  ---------  ------  ------ 
 KED016                  18     32.1       14.1    0.41    0.42 
----------  ---------------  -------  ---------  ------  ------ 
 KED017               33.90    46.00      12.10    1.13   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED017               53.00   101.00      48.00    0.82   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
              Mettalurgical 
 KED018        Sample 
----------  ---------------  -------  ---------  ------  ------ 
              Mettalurgical 
 KED019        Sample 
----------  ---------------  -------  ---------  ------  ------ 
 KED020                   0        8          8    0.20   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED021                46.7       64       17.3    0.46    0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED022               47.00    54.00       7.00    0.26    0.12 
----------  ---------------  -------  ---------  ------  ------ 
 KED022               69.00    73.00       4.00    0.37   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
              Mettalurgical 
 KED023        Sample 
----------  ---------------  -------  ---------  ------  ------ 
 KED024                   7     12.2        5.2    0.27    0.17 
----------  ---------------  -------  ---------  ------  ------ 
 KED025                   0        4          4    0.70    0.21 
----------  ---------------  -------  ---------  ------  ------ 
 KED025                  19       30         11    0.40    0.36 
----------  ---------------  -------  ---------  ------  ------ 
 KED026                   5      6.9        1.9    0.40    1.33 
----------  ---------------  -------  ---------  ------  ------ 
 KED027               132.5      176       43.5    0.57   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED027                 186      193          7    0.32    0.15 
----------  ---------------  -------  ---------  ------  ------ 
 KED028               12.00    26.00      14.00    0.81   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED028              156.10   177.00      20.90    1.51   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED029                  99      103          4    0.18    0.15 
----------  ---------------  -------  ---------  ------  ------ 
 KED030                  30       41         11    0.67    0.25 
----------  ---------------  -------  ---------  ------  ------ 
 KED030               53.05       77      23.95    0.14   -0.10 
----------  ---------------  -------  ---------  ------  ------ 
 KED030               252.8    259.1        6.3    0.32    0.16 
----------  ---------------  -------  ---------  ------  ------ 
 

Technical Glossary

 
 "Au"                  the chemical symbol for the 
                        element gold 
--------------------  ------------------------------------------ 
 "Cu"                  the chemical symbol for copper 
--------------------  ------------------------------------------ 
 "g/t"                 grams per tonne 
--------------------  ------------------------------------------ 
 "Indicated mineral    a part of a Mineral Resource 
  resource"             for which tonnage, densities, 
                        shape, physical characteristics, 
                        grade and mineral content can 
                        be estimated with a reasonable 
                        level of confidence. It is 
                        based on exploration, sampling 
                        and testing information gathered 
                        through appropriate techniques 
                        from locations such as outcrops, 
                        trenches, pits, workings and 
                        drill holes. The locations 
                        are too widely or inappropriately 
                        spaced to confirm geological 
                        and/or grade continuity but 
                        are spaced closely enough for 
                        continuity to be assumed 
--------------------  ------------------------------------------ 
 "Inferred mineral     a part of a Mineral Resource 
  resource"             for which tonnage, grade and 
                        mineral content can be estimated 
                        with a low level of confidence. 
                        It is inferred from geological 
                        evidence and assumed but not 
                        verified geological and/or 
                        grade continuity. It is based 
                        on information gathered through 
                        appropriate techniques from 
                        locations such as outcrops, 
                        trenches, pits, workings and 
                        drill holes which may be limited 
                        or of uncertain quality and 
                        reliability. 
--------------------  ------------------------------------------ 
 "JORC"                The Jorc Code (2012) 
--------------------  ------------------------------------------ 
 "JORC Code (2012)"    the code for reporting of the 
                        Australasian Joint Ore Reserves 
                        Committee, which is sponsored 
                        by the Australian mining industry 
                        and its professional organisations. 
                        The code is widely accepted 
                        as a standard for professional 
                        reporting purposes for reporting 
                        of mineral resources and ore 
                        reserves. 
--------------------  ------------------------------------------ 
 "m"                   metre, a unit of length as 
                        per the International System 
                        of Units. 
--------------------  ------------------------------------------ 
  "Mineral Resource"   a concentration or occurrence 
                        of material of intrinsic economic 
                        interest in or on the Earth's 
                        crust in such form, quality 
                        and quantity that there are 
                        reasonable prospects for eventual 
                        economic extraction. The location, 
                        quantity, grade, geological 
                        characteristics and continuity 
                        of a Mineral Resource are known, 
                        estimated or interpreted from 
                        specific geological evidence 
                        and knowledge. Mineral Resources 
                        are sub-divided, in order of 
                        increasing geological confidence, 
                        into Inferred, Indicated and 
                        Measured categories. 
--------------------  ------------------------------------------ 
 "Mineralisation"      the process or processes by 
                        which a mineral is introduced 
                        into a rock, resulting in a 
                        valuable or potentially valuable 
                        deposit. It is a general term, 
                        incorporating various types; 
                        e.g., fissure filling, impregnation, 
                        and replacement. 
--------------------  ------------------------------------------ 
 "Sulphide"            a compound of sulphur and some 
                        other element 
--------------------  ------------------------------------------ 
 "Gold oxides"         Near surface deposit of porous 
                        gold-enriched rocks typically 
                        containing abundant quartz 
                        and Fe-limonites, commonly 
                        formed by the meteoric weathering 
                        of gold-bearing sulphide mineralisation. 
--------------------  ------------------------------------------ 
 

**ENDS**

For further information please visit www.georgianmining.com or contact:

 
 Greg Kuenzel   Georgian Mining          Company        Tel: 020 7907 
                 Corporation                             9327 
 Ewan Leggat    S. P. Angel Corporate    Nomad &        Tel: 020 3470 
                 Finance LLP              Broker         0470 
 Damon Heath    Shard Capital Partners   Joint Broker   Tel: 0207 
                 LLP                                     186 9950 
 Elisabeth      St Brides Partners       PR             Tel: 020 7236 
  Cowell         Ltd                                     1177 
 

Competent Person Statement

The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Adam Wheeler, who is a fellow (FIMMM) of the Institute of Materials, Minerals and Mining and a registered Chartered Engineer (C. Eng and Eur. Ing) with the Engineering Council (UK) and reviewed by Mark Owen, BSc, MSc, MCSM, Chartered Geologist, a member of the European Federation of Geologists and a Fellow of the Geological Society.

Both Mr Wheeler and Mr Owen have sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking, to qualify as Competent Persons as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mark Owen and Adam Wheeler have reviewed this announcement and consent to the inclusion in the announcement of the matters based on their information in the form and context in which it appears.

About Georgian Mining Corporation

Georgian Mining Corporation has 50% ownership and operational control of the Bolnisi Copper and Gold Project in Georgia, situated on the prolific Tethyan Belt, a well-known geological region and host to many high grade copper-gold deposits and producing mines. The Bolnisi licence covers an area of over 860 sq km and has a 30 year mining licence with two advanced exploration projects; Kvemo Bolnisi and Tsitsel Sopeli. These projects are proximal to existing mining operations which are owned by the Company's supportive joint venture partner. Georgia has an established mining code and is a jurisdiction open to direct foreign investment.

Quality Assurance and Quality Control

Drill hole sampling consists of half core ranging from 0.5m to 1.5m in length that are prepared at an onsite preparation lab operated by the company's partner. Samples were analysed at ALS Global laboratory in Loughrea, Ireland. Gold concentrations determined by 50gm Fire assay (Au-AA26) and multi-element data by 4 acid digest ICP (ME-MS61) Over grade samples are analysed using ICP AES (OG-62). Field duplicates are collected and blanks and CRMs are routinely inserted to all batches at a suitable frequency.

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLBGGDSDSDBGRX

(END) Dow Jones Newswires

April 24, 2017 02:00 ET (06:00 GMT)

1 Year Georgian Mining Chart

1 Year Georgian Mining Chart

1 Month Georgian Mining Chart

1 Month Georgian Mining Chart

Your Recent History

Delayed Upgrade Clock