ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

EDL Edenville Energy Plc

14.25
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Edenville Energy Plc LSE:EDL London Ordinary Share GB00BN47NP32 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 14.25 14.00 14.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Edenville Energy PLC Updated Financial Model (3695K)

21/09/2016 7:00am

UK Regulatory


Edenville Energy (LSE:EDL)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Edenville Energy Charts.

TIDMEDL

RNS Number : 3695K

Edenville Energy PLC

21 September 2016

21 September 2016

EDENVILLE ENERGY PLC

("Edenville" or the "Company")

Updated Financial Model

Edenville Enegy plc, the Company developing an integrated coal to power project in western Tanzania, would like to provide an update on the status of the financial modelling work for the project.

A newly constructed financial model (the "Financial Model") for the Company's Rukwa Coal to Power Project has been completed by Diamond Energy Ltd, an independent power modelling consultant, commissioned by the Company. Diamond Energy Ltd, specialise in building and reviewing valuation models for energy assets, and assisting clients with negotiation of commercial contracts supporting independent electricity projects.

Key Points

   --    Newly developed independent 2016 Financial Model constructed by Diamond Energy Ltd 

-- 2015 Power Plant Feasibility Study financial model independently validated with new model results

-- Improved NPV (using a nominal pre tax discount rate of 10%) of US$252 million for a 120MW power plant with a 30 year life

   --    Pre Tax Project nominal IRR 23.4% 

Rufus Short CEO of Edenville Energy plc said: "I am extremely pleased with the completion of the new independent financial model for our Rukwa Coal to Power Project. We now have both an additional level of assurance to what has been done previously, and going forward, will be able to use a fully independently constructed model, structured for international project finance and so preferable for funding negotiations. In addition, we are currently in the process of completing significant work flow including an updated mining assessment; bulk sampling of the deposit and detailed coal wash plant requirements. These will feed into the overall financial analysis of the project over the coming weeks and months."

This new Financial Model further builds upon and validates the results and integrity of the financial model constructed from the results of the 2015 Power Plant Feasibility Study carried out by Lahmeyer India.

Positive and comparable results were obtained in the new Financial Model compared to the 2015 model with an increase of approximately 14% in pre-tax NPV, reflective of improved time granularity of cashflow modelling, pass through indexation and revised capital cost phasing.

For clarity, the 2015 model returned a pre-tax NPV(10%) of US$220 million with an IRR of 23.1% over a 30 year project life for an integrated 120MW coal to power project at the Company's Rukwa site. The newly constructed Financial Model using essentially the same cost inputs returns an improved pre-tax NPV(10%) of US$252 million demonstrating an IRR of 23.4% over the same time period of 30 years. The size of power plant in both models was set at 120MW with a plant utilisation of 80%.

Modelling Comparisons

 
                  2015 model     2016 Financial 
                                      Model 
-------------  ---------------  --------------- 
 Plant size         120 MW           120 MW 
-------------  ---------------  --------------- 
 Utilisation         80%              80% 
-------------  ---------------  --------------- 
 NPV (10%)      US$220 million   US$252 million 
-------------  ---------------  --------------- 
 Project IRR        23.1%            23.4% 
-------------  ---------------  --------------- 
 Period            30 years         30 years 
-------------  ---------------  --------------- 
 

Additionally, the work currently being completed by independent mining consultants, SMS, on evaluation of the mineable resource, will allow the potential for a larger power plant to be more fully assessed.

The Financial Model gives the Company an additional level of confidence on both the integrity of the work originally carried out in 2015 and the underlying modelling methodology.

We are extremely pleased that the original 2015 model has been independently verified through this latest work. Running essentially the same inputs though the new Financial Model indicates the structure of our original modelling was conservative. The new Financial Model has been independently constructed from first principles and provides a basis to engage in detailed discussions with relevant institutions for project financing and development.

The Company along with its consultants is progressively updating various inputs and parameters for the project as feasibility work and other required tasks continue to be progressed and completed. We will continue to update the model and as appropriate will inform our shareholders accordingly of material changes.

Note: The Financial Model, which will be further developed as inputs and parameters are optimised, has been constructed and reviewed independently and undergone in-house review as part of the feasibility process.

The Financial Model is indicative and based on the best available data and estimates at the time. As technical and commercial work progresses the Financial Model will be further assessed and refined, both by the Company and by external consultants. Accordingly the valuation metrics set out in this announcement should not be taken as a financial forecast or definitively relied upon for economic assessment purposes.

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

For further information please contact:

 
 
 Edenville Energy Plc 
  Jeff Malaihollo - Chairman            +44 (0) 20 7652 
  Rufus Short - CEO                      9788 
  Northland Capital Partners Limited 
   (Nominated Adviser) 
   Gerry Beaney                          +44 (0) 20 3861 
   David Hignell                          6625 
  Optiva Securities Limited 
   (Broker) 
   Jeremy King                           +44 (0) 20 3137 
   Graeme Dickson                         1902 
 IFC Advisory 
  (Financial PR and IR) 
  Tim Metcalfe 
  Graham Herring                        +44 (0) 20 3053 
  Heather Armstrong                      8671 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCSEWFISFMSELU

(END) Dow Jones Newswires

September 21, 2016 02:00 ET (06:00 GMT)

1 Year Edenville Energy Chart

1 Year Edenville Energy Chart

1 Month Edenville Energy Chart

1 Month Edenville Energy Chart

Your Recent History

Delayed Upgrade Clock