ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

EDL Edenville Energy Plc

14.25
0.00 (0.00%)
18 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Edenville Energy Plc LSE:EDL London Ordinary Share GB00BN47NP32 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 14.25 14.00 14.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Edenville Energy PLC Project Update (5453Y)

06/03/2017 7:00am

UK Regulatory


Edenville Energy (LSE:EDL)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Edenville Energy Charts.

TIDMEDL

RNS Number : 5453Y

Edenville Energy PLC

06 March 2017

6 March 2017

EDENVILLE ENERGY PLC

("Edenville" or the "Company")

Project Update

Edenville Energy plc (AIM:EDL) is pleased to provide an update on its Rukwa Coal Project in western Tanzania.

Key Points

 
      --   Consultant mining engineer and process 
            engineer appointed. 
      --   Letters of Intent received from several 
            potential coal customers; and 
      --   Wash plant secured and in the process 
            of being containerised for shipment; 
 

Consultant Mining Engineer and Process Engineer Appointed

A consultant mining engineer, with over 20 years of experience in the resources industry, including 10 years in Africa, has been appointed to oversee the mining development and efficient operation of the project. He comes from a strong background of putting mines into production, developing and operating mines and materials processing operations in Africa, Australia, Europe and the UK.

Work has subsequently already begun on mining equipment selection, recruitment of operations personnel and planning of mining development.

To compliment the mining engineer, the Company has also appointed a consultant coal processing engineer to oversee the construction and operation of the wash plant including importantly the training of local Tanzanians. He is a degree qualified electrical engineer and has 12 years of experience in the construction and operation of coal washing plants. He is also experienced in operating coal laboratory facilities as well as holding qualifications for the use of heavy mobile plant.

Letters of intent from several potential customers

Letters of intent ("LOI") and expressions of interest have been received from several parties who intend to purchase coal from the operating mine on a long-term basis. Subsequently, the Company is moving the project forward as quickly as possible to facilitate production to meet this demand.

At present no assurances can be given that these LOIs and expressions of interest will result in formal sales contracts, although the Company is conservatively planning for firm orders that will result in initial sales in the region of 5,000 to 8,000 tonnes per month, with the ability to increase production as appropriate. We are also working with interested parties to determine the product quality characteristics they require.

Wash plant secured and in the process of being containerised for shipment

As announced on 23 February 2017, a coal washing plant has been secured and is currently being prepared for shipment to Tanzania. Assuming the resolutions are passed at the Company's forthcoming General Meeting on 17 March 2017, we expect the plant to be readied for shipping during March and en route to Tanzania by early April, subject to available transportation and export requirements being met. Once the plant arrives on site the estimated time for construction is six to eight weeks and commissioning will take place immediately following that. In the meantime we have access to a local, smaller scale, crusher to process our coal.

Rufus Short CEO of Edenville Energy commented: "I am very pleased to report on the recent progress in several areas at our Rukwa Coal Project. We have interest in our coal from several parties which underpins our production plans and site development will continue to gather pace as equipment arrives on site and the preparation for the wash plant is advanced.

"Additionally the newly recruited mining and processing professionals mean that we have the right people to ensure our mining operations are appropriately developed and exploited."

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

For further information please contact:

 
 
 Edenville Energy Plc 
  Jeff Malaihollo - Chairman             +44 (0) 20 7652 
  Rufus Short - CEO                       9788 
 
   Northland Capital Partners Limited 
   (Nominated Adviser) 
   Gerry Beaney                            +44 (0) 20 3861 
   David Hignell                           6625 
 Optiva Securities Limited 
  (Broker) 
  Jeremy King                              +44 (0) 20 3137 
  Graeme Dickson                           1902 
 IFC Advisory 
  (Financial PR and IR) 
  Tim Metcalfe 
  Graham Herring                         +44 (0) 20 3053 
  Heather Armstrong                       8671 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCLLFSSVSIEIID

(END) Dow Jones Newswires

March 06, 2017 02:00 ET (07:00 GMT)

1 Year Edenville Energy Chart

1 Year Edenville Energy Chart

1 Month Edenville Energy Chart

1 Month Edenville Energy Chart

Your Recent History

Delayed Upgrade Clock