ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

EDL Edenville Energy Plc

14.25
0.00 (0.00%)
23 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Edenville Energy Plc LSE:EDL London Ordinary Share GB00BN47NP32 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 14.25 14.00 14.50 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Edenville Energy PLC Bulk Sampling Results (1831P)

15/11/2016 7:01am

UK Regulatory


Edenville Energy (LSE:EDL)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Edenville Energy Charts.

TIDMEDL

RNS Number : 1831P

Edenville Energy PLC

15 November 2016

15 November 2016

EDENVILLE ENERGY PLC

("Edenville" or the "Company")

Bulk Sampling Results

Edenville Energy plc (AIM:EDL), the Company developing an integrated coal to power project in western Tanzania, is pleased to announce the first set of results the Company has received from SGS Laboratories in relation to the recent bulk sampling programme carried out on the Mkomolo and Namwele deposits and detailed in the Company's announcement on 27 September 2016.

Key Points

   --    Results from seam MK2 confirm coal as suitable for the provision of power plant feed; 

-- Only moderate, or in certain cases, no washing, will be required for Rukwa coal to be used in the combustion process in a coal fired thermal power plant;

-- Where washing is required, high yields of approximately 75% are confirmed as achievable to produce a power plant feed product;

-- The results from the sampling and wash tests both support and validate the recently constructed financial model and resource technical assessment;

-- Applying a greater level of washing to this seam, produces a product above 20MJ/kg which offers scope for supply into the local and regional markets; and

   --    Further test results on the other Mkomolo near surface coal seam are expected shortly. 

The results from seam MK2 confirm the coal is well suited for use in thermal power generation and this data will form a crucial part of the process going forward to design and construct a coal fired power plant at the Rukwa project site.

Both raw and washed values indicate the coal is suitable for power generation purposes and any washing of the coal will primarily be to optimise and maximise the technical and economic parameters. Moderate treatment of the coal will produce a fuel that is optimum for the combustion process and maximise the tonnage available.

This coal is accessible at surface which will result in both low mining costs and the deposit being able to be opened up in a short timeframe.

Additionally, the results are consistent with our recently completed resource technical assessment as announced on 1 November 2016, to determine the available coal resources for an expanded project greater than 120MW. Subsequent to the wash results, the Company can now confirm the suitability of this coal to provide a sustained and reliable fuel supply to a power plant project. Combined with the recent analysis carried out on available coal resources, we can now provide a high degree of validation around the coal deposit at Rukwa.

Technical Details

The bulk sample behaved in a way our previous modelling had predicted and produced results which indicate only moderate or in certain circumstances no washing would be needed to result in a product suitable for use in the power generation process. These bulk sampling and wash results now underpin the power plant design process and will provide validity to the project in order to progress through both technical and financial requirements.

Sample MK2 which lies in the southern end of the Mkomolo deposit produced raw unwashed values as shown in Table 1.

Table 1 Raw Coal

 
 Inherent           Volatile   Fixed     Calorific   Total 
  Moisture   Ash     Matter     Carbon    Value       Sulphur 
----------  -----  ---------  --------  ----------  --------- 
 %           %      %          %         MJ/kg       % 
----------  -----  ---------  --------  ----------  --------- 
 3.5         50.6   17.2       28.7      13.5        1.4 
----------  -----  ---------  --------  ----------  --------- 
 

Applying a moderate or partial wash to the raw coal based on a density of 2.1 the following product was obtained as shown in Table 2. The yield from this wash or "de-stoning" was high at 74%.

Table 2 Washed Coal

 
 Inherent           Volatile   Fixed     Calorific   Total 
  Moisture   Ash     Matter     Carbon    Value       Sulphur 
----------  -----  ---------  --------  ----------  --------- 
 %           %      %          %         MJ/kg       % 
----------  -----  ---------  --------  ----------  --------- 
 4.0         42.6   20.1       33.3      15.7        1.4 
----------  -----  ---------  --------  ----------  --------- 
 

The resultant product is considered suitable for the combustion process and typical of many coals used in power generation worldwide.

All values have been calculated on an air dried basis.

Additional washing of this seam by applying a slightly greater wash based around a density of 1.7 produces a product above 20MJ/kg which offers scope for supply into the local and regional markets. The additional wash results from the other seam sampled at Mkomolo will give a more complete representation of the possible opportunities for short term supply to the local markets.

Rufus Short, CEO of Edenville, commented: "We are extremely pleased and encouraged with the test results to date. The results show and confirm suitable coal quality and very high yields will be available for the Rukwa Coal to Power Project and give us great confidence in the economic viability of our coal deposit to produce power for Tanzania. Importantly, the results indicate we can maximise the value of the insitu coal and there will only be moderate treatment costs incurred to prepare the coal for use in the power generation process. This is likely to have a positive flow through impact on all areas of the mining operation, enabling the project to maximise its economic potential and minimise both capital and operating costs for the mine.

"Edenville is primarily a mining and resources focused group and we are working alongside organisations whose speciality is power development and generation to take this opportunity towards its full potential. We look forward to further updating our shareholders in the near future, particularly with regard to the further test results and the potential suitability of our coal for near term sale to the local market."

Qualified Person Review

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

For further information please contact:

 
 
 Edenville Energy Plc 
  Jeff Malaihollo - Chairman            +44 (0) 20 7652 
  Rufus Short - CEO                      9788 
  Northland Capital Partners Limited 
   (Nominated Adviser) 
   Gerry Beaney                          +44 (0) 20 3861 
   David Hignell                          6625 
  Optiva Securities Limited 
   (Broker) 
   Jeremy King                           +44 (0) 20 3137 
   Graeme Dickson                         1902 
 IFC Advisory 
  (Financial PR and IR) 
  Tim Metcalfe 
  Graham Herring 
  Heather Armstrong                     +44 (0) 20 3053 
  Miles Nolan                            8671 
 

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCUVSNRNOAAARA

(END) Dow Jones Newswires

November 15, 2016 02:01 ET (07:01 GMT)

1 Year Edenville Energy Chart

1 Year Edenville Energy Chart

1 Month Edenville Energy Chart

1 Month Edenville Energy Chart

Your Recent History

Delayed Upgrade Clock