ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

ACP Armadale Capital Plc

0.725
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Armadale Capital Plc LSE:ACP London Ordinary Share GB00BYMSY631 ORD 0.1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.725 0.70 0.75 0.725 0.725 0.725 1,487,431 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Coal Mining Services 0 -206k -0.0004 -18.00 4.23M

Armadale Capital Plc 1.2km Mineralised Strike Identified at Mahenge Liandu Graphite Project

17/08/2017 7:00am

UK Regulatory


Armadale Capital (LSE:ACP)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Armadale Capital Charts.
 
TIDMACP 
 
 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

 

17 August 2017

 

Armadale Capital Plc ('Armadale' or 'the Company')

 

1.2km Mineralised Strike Identified at Mahenge Liandu Graphite Project

 

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce the completion of the first phase of Reverse Circulation ('RC') drilling at its Mahenge Liandu Graphite Project in Tanzania, with wide zones of near surface mineralisation intersected over a strike length of 1,200m. Test work on the bulk sample is now well underway with initial metallurgical test work results showing good recoveries and the production of final graphite concentrates is expected in the coming weeks.

 

Overview

 
 
    -- First phase of RC drilling completed targeting zones of high grade 

near surface mineralisation with potential for priority mining in the

Mahenge Liandu mine plan

 
    -- 24 of the 25 holes returned intersected at or near surface 

mineralisation confirming a consistent area of near surface

mineralisation over a strike length of 1,200m

 
    -- Preliminary on-site review of the drilling gives management confidence 

that an increase in the Resource size and category will be achieved

over the maiden JORC resource estimate of 40.9MT @ 9.41% Total

Graphite Carbon ('TGC')

 
    -- A second drill programme aimed at increasing the Resource category 

over a strike length of 2,400m is planned to commence once results of

the first phase are returned

 
    -- Geological mapping to identify potential extensions has discovered 

additional areas of graphite mineralisation previously untested

 
    -- Bulk sample underway, with initial results showing a 21.3% TGC head 

grade and confirming high levels of recovery of above 98% are

achievable at the rougher stage

 
    -- Multi element analysis on the bulk sample show low levels of 

potentially deleterious elements

 
    -- Concentrates from the bulk sample are expected in the coming weeks and 

will be reported in due course

 

Nick Johansen, Director of Armadale said, "The potential for Mahenge Liandu to host a significant, commercially attractive graphite mining operation continues to be fuelled by these consistently encouraging drill results. Following the completion of our first phase of exploration drilling in the 2017 season, we are delighted to report a consistent area of near surface mineralisation over a strike length of 1,200m, underpinning the scale of this emerging graphite project. With a second phase of drilling being planned, plus geological mapping evaluating possible extensions to the deposit on the wider licence area, I am confident that our maiden JORC Resource estimate of 40.9Mt at 9.41% TGC, which is already one of the largest in Tanzania, has significant room for expansion."

 

Drilling Programme Update

 

The first phase of drilling on a 200m by 80m pattern is now complete over a strike length of 1,200m with a total of 25 holes now completed. The results continue to indicate wide zones of near surface mineralisation over the full strike length, which is expected to cover the area of the initial pit. Several holes had mineralisation much wider than expected up to 105 from surface. Within this areas of high-grade have been logged. Assay from the drilling programme will be released when the results come to hand.

 
Hole ID    Easting    Northing   Total Depth  From  To                         Width 
LDRC0022   251,673    9,035,201  65           0     58                         58 
LDRC0023   251,855    9,035,275  51           0     46                         46 
LDRC0024   251,821    9,035,352  33           0     29                         29 
LDRC0025   251,896    9,035,210  34           0     28                         28 
LDRC0026   251,785    9,035,419  63           0     55                         55 
LDRC0027   251,758    9,035,495  63           0     58                         58 
LDRC0028   251,938    9,035,596  41           0     20                         20 
LDRC0029   251,976    9,035,515  50           0     37                         37 
LDRC0030   251,909    9,035,660  19           0     3                          3 
LDRC0031   252,010    9,035,443  63           6     56                         50 
LDRC0032   252,043    9,035,371  57           13    46                         33 
LDRC0033   251,728    9,035,571  61           11    54                         43 
LDRC0034   251,694    9,035,642  48           0     3                          3 
                                              23    27                         4 
LDRC0035   251,653    9,035,504  74           37    68                         31 
LDRC0036   251,620    9,035,351  33           0     10                         10 
LDRC0037   251,642    9,035,283  69           0     58                         58 
LDRC0038   251,588    9,035,433  63           0     55                         55 
LDRC0039   251,461    9,035,183  66           0     58                         58 
LDRC0040   251,432    9,035,265  56           0     48                         48 
LDRC0041   251,395    9,035,330  79           0     75                         75 
LDRC0042   251,494    9,035,112  60           10    54                         44 
LDRC0043   251,527    9,035,039  33           2     4                          2 
LDRC0044   251,566    9,034,969  93           17    21                         4 
                                              45    87                         42 
LDRC0045   251599.9   9034896.8  50           No mineralisation intercepted    n/a 
LDRC0046   251267.87  9035127.1  105          0     105                        105 
 
 

Table 1 Graphite intercepts from 2017 drilling programme - results in italics were previously reported August 2017 (see RNS dated 1 August 2017 for further information)

 

The information in this announcement that relates to exploration results is based on information compiled by Mr Matt Bull, a competent person, who is a Member of the Australian Institute of Geoscientists. Mr Bull has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Bull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

 

**ENDS**

 
Enquiries: 
Armadale Capital Plc                        +44 20 7236 1177 
Tim Jones, Company Secretary 
Nomad and broker: finnCap Ltd               +44 20 7220 0500 
Christopher Raggett / Simon Hicks 
Joint Broker: Beaufort Securities Limited   +44 20 7382 8300 
Jon Belliss 
Press Relations: St Brides Partners Ltd     +44 20 7236 1177 
Susie Geliher / Charlotte Page 
 
 

Notes

 

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

 

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC. At least 32Mt of this resource has an average grade of 10.47% TGC, one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu's potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

 

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

 

More information can be found on the website www.armadalecapitalplc.com.

 
 
 

View source version on businesswire.com: http://www.businesswire.com/news/home/20170816005702/en/

 
This information is provided by Business Wire 
 
 

(END) Dow Jones Newswires

August 17, 2017 02:00 ET (06:00 GMT)

1 Year Armadale Capital Chart

1 Year Armadale Capital Chart

1 Month Armadale Capital Chart

1 Month Armadale Capital Chart

Your Recent History

Delayed Upgrade Clock