ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

AAZ.GB Anglo Asian

63.00
0.00 (0.00%)
23 Apr 2024 - Closed
Realtime Data
Share Name Share Symbol Market Type Share ISIN Share Description
Anglo Asian AQSE:AAZ.GB Aquis Stock Exchange Ordinary Share GB00B0C18177
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 63.00 59.00 67.00 65.3333 63.00 63.00 8 15:29:50
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Anglo Asian Mining PLC Interim Results (4640J)

12/09/2016 7:00am

UK Regulatory


Anglo Asian (AQSE:AAZ.GB)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Anglo Asian Charts.

TIDMAAZ

RNS Number : 4640J

Anglo Asian Mining PLC

12 September 2016

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

12 September 2016

Anglo Asian Mining plc

Interim results for the six month period to 30 June 2016

Return to profitability at Gedabek gold, copper and silver mine, Azerbaijan

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM traded gold, copper and silver producer focused in Azerbaijan, is pleased to announce its interim results for the six month period ended 30 June 2016 ("H1 2016") with the Group returning to profitability during the period. Note that all references to "$" are to United States dollars.

A presentation on the Company and its results will be available later today, Monday 12 September on the Anglo Asian web-site www.angloasianmining.com

Production and sales overview

   --    Strong H1 2016 production figures with increasing copper and silver production: 

o Record copper production of 969 tonnes (H1 2015: 418 tonnes)

o Record silver production of 90,782 ounces (H1 2015: 6,478 ounces)

o Gold production slightly reduced at 33,837 ounces (H1 2015: 35,938 ounces)

   --    Increased copper concentrate sales which have partially offset reduced gold bullion sales: 

o Copper concentrate sales of 2,912 dry metric tonnes ("dmt") which generated revenue of $5.2 million (H1 2015: 606 dmt which generated revenue of $1.7 million)

o Gold bullion sales of 27,719 ounces at an average of $1,230 per ounce (H1 2015: 33,294 ounces at an average of $1,204 per ounce)

-- 18,000 ounces of gold bullion sales in H2 2016 hedged at no cost with a minimum and maximum sales price per ounce of $1,200 and $1,426 respectively

-- Target gold production for the year to 31 December 2016 ("FY 2016") lowered to between 69,000 and 71,000 ounces of gold. Target copper production remains at between 1,700 and 2,100 tonnes of copper

Financial overview

   --    Profit before taxation of $3.5 million (H1 2015: loss of $4.1 million) 

-- Revenue decreased to $39.3 million (H1 2015: $41.8 million) due to lower gold bullion sales partially offset by higher sales of copper concentrate

-- 26 per cent. reduction in average cash operating costs to $546 (H1 2015: $736) per ounce of gold bullion due to both lower mining and processing costs and higher by-product sales

-- Increased operating cash flow before movements in working capital of $16.9 million (H1 2015: $10.7 million)

-- Reduced capital expenditure of $6.6 million (H1 2015: $9.1 million) - expenditure mainly on advanced stripping, the new SAG mill and underground equipment

   --    Decreased net debt of $40.7 million as at 30 June 2016 (31 December 2015: $49.0 million) 
   --    Cash of $3.3 million as at 30 June 2016 (31 December 2015: $0.2 million) 

Operational overview

   --    First full six months of production from flotation plant 
   --    Second SAG mill operational end of August 2016 
   --    New underground equipment fully deployed in H1 2016 
   --    Contracts executed for water treatment plant and evaporation equipment 

-- Work commenced on construction of electrical sub-station and associated overhead power lines to connect Gedabek to the national power grid

Chairman's statement

I am delighted to report a return to profitability at Anglo Asian with the Company earning a profit before taxation in the six months to 30 June 2016 of $3.5 million. This return to profitability, together with the reduction in capital expenditure and net debt, demonstrates the progress of our strategy at Gedabek. The Company has now created a foundation for increased profitability and cash generation.

The increase in metal prices since the beginning of 2016 and the recent devaluations of the Azerbaijan Manat have materially assisted in our return to profitability. However, the Company is always mindful of the volatile environment in which it operates and therefore remains highly focused on optimising the efficiency of its operations and reducing costs wherever possible. For example, we are currently undertaking initiatives to lower our cost of electricity by connecting Gedabek to the electricity grid and to improve the sustainability of our operations by purifying and disposing of waste water as described further below.

Anglo Asian has recently strengthened its geological department which is now starting to have a much greater focus on increasing our resources and reserves, primarily at our Gedabek site. The work carried out so far in 2016 is also described further below.

During the period, we also took the opportunity to hedge some future gold bullion sales in June 2016 due to the strength in the gold price at that time resulting from the uncertainties of the United Kingdom's EU referendum decision and global economic conditions. This protects the Company against any significant downside in the price of gold whilst still giving us exposure to any further increases in this volatile gold market. This is the first time Anglo Asian has hedged gold sales and this transaction therefore marks another stage in the development of your company.

Although we are obviously delighted to have returned Anglo Asian to profitability, the reduction in our target gold production for 2016 is a disappointment. Unfortunately, the late commissioning of the second semi-autogenous grinding ("SAG") mill and the Gadir development work required in August resulted in a shortfall in gold doré production in July and August of 2,779 ounces compared to budget. These issues have now been overcome but as a result we have had to lower our target gold production for FY 2016 from between 73,000 and 77,000 ounces to between 69,000 and 71,000 ounces.

Gedabek - mining, production and sales

Gedabek is a polymetallic deposit from which Anglo Asian produces gold, copper and silver from its Gedabek open pit mining operation and co-located underground Gadir mine. Gosha is our second gold and silver mine and ore mined at Gosha is transported to Gedabek for processing, due to its close proximity. Four different processing methods are used to produce gold, silver and copper. Agitation leaching and heap leaching (both of crushed and whole ore) are used to produce gold doré. Sulphidisation, Acidification, Recycling and Thickening ("SART") and flotation are used to produce copper concentrates, which also contain some gold and silver.

Since the beginning of 2016, we have continued to focus on optimising production at Gedabek. The flotation plant was in operation throughout the period and we resolved the final commissioning issues and succeeded in reducing the zinc content of the concentrate. An important step in optimising the production from the agitation leaching plant was the commissioning of a second SAG mill in August. Although the SAG mill was commissioned later than anticipated, it will ensure sustainable production now it is in operation.

During H1 2016, the Company mined 835,381 tonnes of ore from its Gedabek open pit (H1 2015: 864,672 tonnes) and 55,488 tonnes of ore with a revised average content of 5.84 grammes per tonne from our Gadir underground mine.

As previously reported, low grade ore (less than 1.5 grammes per tonne of gold) is being treated by heap leaching, whilst higher grade ore (more than 1.5 grammes per tonne of gold) is being processed through the agitation leaching plant.

During H1 2016, Anglo Asian stacked 201,652 tonnes of dry crushed ore on to heap leach pads with an average gold content of 1.40 grammes per tonne (H1 2015: 220,096 tonnes with an average gold content of 1.48 grammes per tonne). The Company also heap leached uncrushed Run of Mine ("ROM") ore. During H1 2016, Anglo Asian stacked 377,940 tonnes of ROM ore on to heap leach pads with an average gold content of 0.80 grammes per tonne (H1 2015: 378,976 tonnes with an average gold content of 0.90 grammes per tonne).

During H1 2016, the Company processed 283,579 tonnes of ore with an average gold content of 3.29 grammes per tonne through the agitation leaching plant (H1 2015: 278,269 tonnes with an average gold content of 3.50 grammes per tonne).

There was a 72 per cent. gold recovery in agitation leaching for H1 2016 (H1 2015: 75 per cent.). This slight decrease in gold recovery was a result of the lower grade and greater refractoriness of the ore processed. Gold doré is produced from both heap and agitated leach intermediate solutions, which are combined for final processing and also re-circulated around the plant, heap leach pads and tailings dam. Heap leaching is a long term process and recoveries are therefore only estimates calculated from available metallurgical statistics.

During H1 2016, the Company produced gold doré containing 31,309 ounces of gold and 4,941 ounces of silver at Gedabek (H1 2015: 35,924 ounces of gold and 1,497 ounces of silver). The agitation leaching plant produced 21,611 and 3,381 ounces of gold and silver, respectively, and the heap leach operations produced 9,698 and 1,560 ounces of gold and silver, respectively. The decreased gold doré production in H1 2016 compared to H1 2015 was due to lower production from both the agitation leaching plant and from heap leach mainly as a result of lower ore grades.

During H1 2016, 248,950 dmt of agitation leaching plant tailings were processed by the flotation plant. The gross metal contained within this feed-stock was 8,869 ounces of gold, 164,029 ounces of silver and 1,176 tonnes of copper. Copper concentrate of 3,443 dmt was produced containing 593 tonnes of copper, 2,512 ounces of gold and 69,073 ounces of silver. SART processing produced 736 dmt of copper concentrate containing 376 tonnes of copper, 16 ounces of gold and 16,768 ounces of silver.

The following table summarises gold doré production and sales at Gedabek for FY 2015 and H1 2016:

 
                Gold produced*       Silver   Gold sales**  Gold sales 
                      (ounces)    produced*       (ounces)       price 
                                   (ounces)                  ($/ounce) 
Quarter ended 
31 March 2015           17,185          597         17,206       1,214 
30 June 2015            18,739          900         16,088       1,193 
H1 2015                 35,924        1,497         33,294       1,204 
30 Sept 2015            18,158          907         14,871       1,123 
31 Dec 2015             17,588        1,858         15,759       1,108 
H2 2015                 35,746        2,765         30,630       1,115 
FY 2015                 71,670        4,262         63,924       1,161 
31 March 2016           13,383        1,958         12,058       1,184 
30 June 2016            17,926        2,983         15,661       1,265 
H1 2016                 31,309        4,941         27,719       1,230 
--------------  --------------  -----------  -------------  ---------- 
 

* including Government of Azerbaijan's share.

** excluding Government of Azerbaijan's share.

The following table summarises copper concentrate production from both its SART and flotation plants for H1 2016:

 
                      Concentrate     Copper       Gold     Silver 
                      production*   content*   content*   content* 
                            (dmt)   (tonnes)   (ounces)   (ounces) 
 Quarter ended 31 
  March 2016 
 SART processing              363        181         12      7,789 
 Flotation                  1,458        251        777     24,595 
 Total                      1,821        432        789     32,384 
 
 Quarter ended 30 
  June 2016 
 SART processing              373        195          4      8,979 
 Flotation                  1,988        342      1,735     44,478 
 Total                      2,361        537      1,739     53,457 
 
 6 months ended 30 
  June 2016 
 SART processing              736        376         16     16,768 
 Flotation                  3,446        593      2,512     69,073 
 Total                      4,182        969      2,528     85,841 
-------------------  ------------  ---------  ---------  --------- 
 

* including Government of Azerbaijan's share.

The following table summarises total copper concentrate production and sales at Gedabek for FY 2015 and H1 2016. Note that sales of concentrates are initially recorded at provisional amounts until agreement of final assay:

 
 
                Concentrate     Copper       Gold     Silver    Concentrate     Concentrate 
                production*   content*   content*   content*        sales**         sales** 
                      (dmt)   (tonnes)   (ounces)   (ounces)          (dmt)          ($000) 
 Quarter 
  ended 
 31 March 
  2015                  298        182          8      1,354            234             660 
 30 June 
  2015                  391        236          6      3,627            372           1,076 
 H1 2015                689        418         14      4,981            606           1,736 
 
 30 Sept 
  2015                  406        216          7      3,532            279             661 
 31 Dec 2015            955        335        341     15,851            817           1,285 
 H2 2015              1,361        551        348     19,383          1,096           1,946 
 FY 2015              2,050        969        362     24,364          1,702           3,682 
 31 March 
  2016                1,821        432        789     32,384          1,330           2,137 
 30 June 
  2016                2,361        537      1,739     53,457          1,582           3,019 
 H1 2016              4,182        969      2,528     85,841          2,912           5,159 
-------------  ------------  ---------  ---------  ---------  -------------  -------------- 
 
   *   including Government of Azerbaijan's share. 

** excluding Government of Azerbaijan's share.

Gedabek - operational update

The agitation leaching plant's second SAG mill at Gedabek became operational at the end of August, approximately seven weeks later than scheduled. This was due to a delay in obtaining the liners for the mill from Turkey caused by the country's recent political unrest. Now operational, it will ensure sustainable production from the agitation leaching plant and can be redeployed in an expanded flotation plant in the future.

In line with our strategy to maintain Gedabek as a low cost operation, we have started on several initiatives to improve sustainability and further lower costs. Contracts totaling $1.7 million have been signed for equipment to purify, and dispose of, waste water. A membrane filtration plant will remove water from the tailings dam and purify it, so that it can be discharged into the environment. A concentrated solution will be produced as a by-product from which metal and cyanide will be recovered. Further water will also be disposed of by ancillary evaporation equipment which is also being installed. These measures will improve the water balance of the site and save costs as they will reduce the tailings dam capacity requirements. Additionally, they will also enable the partial recovery of metal currently present in the contents of the tailings dam. The system is expected to be installed and in operation by Q4 2016 and we look forward to seeing the benefits from this initiative.

The Company has also entered into a $2 million contract for the construction and installation of a 35/6 kV 2x16 MVA electrical sub-station and associated overhead power lines to connect the Gedabek site to the national electricity grid. This will result in cleaner and cheaper electrical power at Gedabek, which up to now has been supplied by diesel generators. Work has commenced and the contractor has started construction of the electrical panel building and some of the pylons have been installed. It is expected that the work will be completed and power will be available from the electricity grid by the end of 2016. Once in operation, purchasing electricity from the grid compared to generating electricity using diesel generators will result in cost savings of approximately $1.8 to $2.0 million per annum.

I am also pleased to report that the new underground equipment, which was purchased from Atlas Copco, comprising an underground drill machine, loader and truck is now fully deployed in the Gadir underground mine where ore was first mined in 2015. Although the output from the Gadir mine has been less than budgeted due to the additional development work which is now underway and which has also affected our FY 2016 target gold production, this equipment is improving the productivity of the Gadir mine.

Exploration and development

In 2016 to date, various activities were carried out within the greater Gedabek area with the aim of delineating further resources and reserves to increase the life of mine.

   a.         Surface brownfield exploration 

This focused on areas adjacent to the current operating mine and along strike where mineralisation is exposed at the surface. Geological mapping was carried out over 1.4 square kilometres from which 401 outcrop samples were taken and 214 metres of follow-up trenching was carried out. In addition, eight drill holes with a total of 2,172 metres of diamond drilling were completed. Additional field mapping is planned along strike to define future exploration targets in H2 2016.

Wider exploration activity continued over the 300 square kilometre Gedabek contract area with positive results from surface mapping and sampling, which has targeted other areas for follow-up work.

   b.         Gadir underground mine 

Exploration works continued at the Gadir underground mine. Efforts focused on underground mapping that comprised 1,494 linear metres backed up with 3,764 linear metres of channel sampling. With underground development having reached significant ore zones, an exploration drift was constructed to allow drilling to take place. Mineral resource delineation drilling continued with the aim of assessing the down dip and lateral extensions of the known ore bodies. A significant new copper rich zone was discovered, which will be subject to evaluation drilling during H2 2016. In H1 2016, 4 core drill holes (HQ size core) with a total of 441 metres had been completed. These drill holes were designed to confirm and extend mineralisation at Gadir. This drilling yielded positive results with the more significant intercepts being 3.5 metres at 5.1 grammes per tonne of gold; 8 metres at 2.6 grammes per tonne of gold; 4 metres at 4.7 grammes per tonne of gold and 3.4 metres at 4.6 grammes per tonne of gold, with narrower zones up to 14.5 grammes per tonne of gold over 1 metre. An additional 60 drill holes (BQ size core) with a total of 1,435 metres were drilled to define ore zone geometry.

   c.         Bittibulag mineral occurrence 

The Bittibulag mineral occurrence is approximately 6 kilometres north-west from the Gedabek open pit. A surface mapping exercise was completed over the Bittibulag area covering an area of 0.8 square kilometres that included taking 320 outcrop samples for analysis. This was followed up by a soil geochemical sampling programme over an area of 2.8 square kilometres from which 648 samples were taken and which are currently being prepared for assaying. A total of 56 metres of trenches were excavated and mapped from which 60 samples were taken. On the basis of the positive results it is planned to carry out historical adit rehabilitation, diamond drilling and metallurgical test work drilling in H2 2016.

Exploration work also continued at the Ordubad contract licence area in the Nakhichevan region of Azerbaijan. During H1 2016, 42 linear metres of trenching was completed. Access was gained by 2,000 metres of road cleaning to reach exploration adits at the Pyazbashi deposit which were developed during the Soviet era. 360 metres of underground rehabilitation was completed, plus portal support infrastructure that allowed 583 metres of channel sampling from which 740 samples were taken that confirmed the presence of gold mineralisation in the quartz-kaolin vein system.

Financial review

Revenue of $39.3 million was generated from the sales of Anglo Asian's share of gold and silver bullion, refined from doré bars which it produced, and copper concentrate in the six months ended 30 June 2016. Sales of gold and silver bullion were $34.1 million which comprised 27,719 ounces of gold and 4,496 ounces of silver at an average price of $1,230 and $16 per ounce respectively. Sales of copper concentrate were $5.2 million.

The Company entered into a series of net zero cost options with a lower (PUT option) sales price of $1,200 per ounce and an upper (CALL option) sales price of $1,426 per ounce on 27 June 2016. The options mature in lots of 1,500 ounces of gold with the first lot maturing on 12 July 2016. The rest of the lots then mature every two weeks from this date with the final lot maturing on 13 December 2016. These options were initially recorded at a net cost of $nil and at 30 June 2016 at their net fair value of a liability of $282,000. The difference between the value at which initially recorded and at the balance sheet date of $282,000 was expensed to other operating expense in the income statement. All options will mature within the 2016 financial year and to date lots totaling 7,500 ounces have all matured within the put and call range.

Total cost of sales for the six months ended 30 June 2016 decreased by $9.9 million to $30.0 million compared to $39.9 million in 2015. Cash cost of sales decreased by $5.5 million to $22.6 million compared to $28.1 million in 2015. Major contributors to these cost reductions were reagents lower by $4.3 million at $7.3 million; fuel lower by $0.9 million at $2.9 million and spare parts lower by $0.7 million at $0.9 million. These reductions were as a result of continued plant optimisation, good cost control and the weakening of the Azerbaijan Manat against the US dollar. Depreciation decreased by $1.0 million from $10.9 million in 2015 to $9.9 million in 2016 due to lower gold production.

Administrative expenses for the six months ended 30 June 2016 decreased to $2.5 million compared to $2.8 million in 2015. The decrease in the administrative expenses was mainly due to the depreciation of the Azerbaijan Manat. Administrative expenses comprise the cost of the Company's office in Baku, directors and other administrative staff salaries, professional fees and the cost of maintaining the Company's public quotation on the AIM market.

The finance costs for the six months ended 30 June 2016 of $2.5 million comprise interest on loans and letters of credit of $2.3 million and accretion expense on the rehabilitation provision of $0.2 million. There were no borrowing costs capitalised in the six months ended 30 June 2016.

The income tax charge for the six months ended 30 June 2016 of $3.1 million was a deferred taxation charge in respect of the Azerbaijan operations. The Company's Azerbaijan operations are expected to produce taxable profits for the full year ending 31 December 2016.

The Group produced gold bullion at an average cash operating cost of production in the six months ended 30 June 2016 of $546 per ounce compared to $736 per ounce in the six months ended 2015 and $724 for the full year 2015. Average cash operating cost of production for H1 2016 compared to H1 2015 was lower due to total mining, processing and selling costs lower by $5.5 million and copper and silver by-product credits higher by $3.9 million. Average cash operating cost of production is calculated by reference to mining and processing costs (before depreciation) plus precious metal selling costs less revenue (including the Government of Azerbaijan's share) from the sale of copper concentrate and silver bullion.

The Company had cash and cash equivalents at 30 June 2016 of $3.3 million and total debt at amortised cost of $44.0 million, giving net debt of $40.7 million. The Amsterdam Trade Bank loan has a debt service cover ratio ("DSCR") covenant of 1.25, and for the six months ended 30 June 2016, the DSCR was 1.44. The Company had no unutilised credit facilities at 30 June 2016.

Capital expenditure of $6.6 million represents capitalised advanced stripping costs of $2.7 million; expenditure on underground equipment of $1.3 million; the new SAG mill of $1.0 million and miscellaneous equipment and tools of $1.6 million.

Capitalised exploration and evaluation expenditure of $0.1 million was incurred in the six months ended 30 June 2016. This was mainly exploration in the Ordubad contract area.

The Group reports in US dollars and a substantial proportion of its business is conducted in either US dollars or the Azerbaijan Manat ("AZN") which has been stable at AZN 1 equaling approximately $0.95 during the six months ended 30 June 2016. In addition, the Company's revenues and the majority of its interest bearing debt are denominated in US dollars. The Company believes it does not have any significant exposure to foreign exchange fluctuations although the situation is kept under review.

Corporate and social responsibility

Our health, safety, social and environmental performance forms a central part of our philosophy of continuous commitment to best practice. Given the hazardous nature of mining and the climatic conditions at Gedabek, especially in winter, it is inevitable that minor accidents and mishaps occur, in spite of our best efforts to avoid them. In the H1 2016 period under review, we recorded four lost time injury (LTI) incidents, none of which resulted in serious injury to the casualties.

Protection of the environment in and around our properties is of vital importance to us. In this regard, the seven kilometre pipeline that carries the tailings slurry from our agitation leaching plant to the tailings dam where the tailings are stored is of particular concern, because the internal pressures make the pipeline prone to leakages. In order to minimise risks to the environment, we have enclosed the pipeline in a lined ditch along its entire length and the pipeline is regularly patrolled on a twenty four seven basis, so that any leaks can be quickly spotted and dealt with. In spite of these precautions, we had two leakage incidents in March, during a particularly cold spell, when tailings escaped from the enclosing ditch and contaminated the surrounding area and local watercourses. However, rapid remediation measures were undertaken and in both cases environmental equilibrium was restored within a short period.

Our efforts to improve our health safety and environmental performance will be sustained with the aim of achieving and maintaining the highest international standards.

Outlook

I am delighted that your Company has returned to profitability and look forward to the rest of 2016 and beyond with optimism. Although the third quarter of 2016 has seen a slower start than budgeted which has resulted in a small reduction in our FY 2016 target gold production to between 69,000 to 71,000 ounces, I believe that during the course of H1 2016, we have demonstrated that our strategy can deliver success, and that we have built a strong platform for increasing profitability and cash generation.

The outlook for metal prices still remains uncertain. However, the increase in prices during the first eight months of 2016 is obviously beneficial to us and we hope marks the start of a sustained recovery in prices.

Appreciation

I would like to take this opportunity to thank our Anglo Asian senior management team and employees, partners, the Government of Azerbaijan, advisers and fellow directors for their support as we continue to develop Anglo Asian. I would also like to especially thank our shareholders for their invaluable support as we look forward to a successful 2016 and beyond.

Khosrow Zamani

Non-executive Chairman

9 September 2016

Anglo Asian Mining plc

Condensed group income statement

Six months ended 30 June 2016

 
 
                                                        6 months            6 months 
                                                              to                  to 
                                                         30 June             30 June 
                                                            2016                2015 
                                                     (unaudited)         (unaudited) 
                             Notes                          $000                $000 
--------------------------  ------  ----------------------------  ------------------ 
 Revenue                                                  39,323              41,823 
 Cost of sales                                          (29,960)            (39,940) 
--------------------------  ------  ----------------------------  ------------------ 
 Gross profit                                              9,363               1,883 
 Other income                                                 78                  13 
 Administrative expenses                                 (2,524)             (2,786) 
 Other operating expense                                   (883)               (254) 
 Operating profit 
  / (loss)                                                 6,034             (1,144) 
 Finance costs                                           (2,546)             (2,980) 
--------------------------  ------  ----------------------------  ------------------ 
 Profit / (loss) before 
  tax                                                      3,488             (4,124) 
 Income tax                      3                       (3,064)                 746 
--------------------------  ------  ----------------------------  ------------------ 
 Profit / (loss) after 
  tax                                                        424             (3,378) 
--------------------------  ------  ----------------------------  ------------------ 
 
   Profit / (loss) per 
   share for the period 
   attributable to the 
   equity holders of 
   the parent                                                424             (3,378) 
--------------------------  ------  ----------------------------  ------------------ 
 Basic (US cents per 
  share)                         4                          0.38              (3.02) 
--------------------------  ------  ----------------------------  ------------------ 
 Diluted (US cents 
  per share)                     4                          0.38              (3.02) 
--------------------------  ------  ----------------------------  ------------------ 
 
 

Anglo Asian Mining plc

Condensed group statement of comprehensive income

Six months ended 30 June 2016

 
 
                                              6 months       6 months 
                                                    to             to 
                                               30 June        30 June 
                                                  2016           2015 
                                           (unaudited)    (unaudited) 
                                                  $000           $000 
----------------------------------------  ------------  ------------- 
 Profit / (loss) for the period                    424        (3,378) 
----------------------------------------  ------------  ------------- 
 Total comprehensive profit / (loss) 
  for the period                                   424        (3,378) 
----------------------------------------  ------------  ------------- 
 
 Attributable to the equity holders of 
 the parent company                                424        (3,378) 
----------------------------------------  ------------  ------------- 
 
 

Anglo Asian Mining plc

Condensed group statement of financial position

30 June 2016

 
 
 
                                            30 June         30 June    31 December 
                                               2016            2015           2015 
                                        (unaudited)     (unaudited)      (audited) 
                              Notes            $000            $000           $000 
---------------------------  ------  --------------  --------------  ------------- 
 Non-current assets 
 Intangible assets                5          17,553          19,220         18,373 
 Property, plant 
  and equipment                   6         104,141         113,464        108,428 
 Inventory                        7           2,595           2,071          2,543 
 Other receivables                8           1,113             818            120 
---------------------------  ------  --------------  --------------  ------------- 
                                            125,402         135,573        129,464 
---------------------------  ------  --------------  --------------  ------------- 
 Current assets 
 Inventory                        7          27,087          28,693         26,197 
 Trade and other 
  receivables                     8          10,209          12,523         16,131 
 Cash and cash 
  equivalents                                 3,262           1,784            249 
---------------------------  ------  --------------  --------------  ------------- 
                                             40,558          43,000         42,577 
---------------------------  ------  --------------  --------------  ------------- 
 Total assets                               165,960         178,573        172,041 
---------------------------  ------  --------------  --------------  ------------- 
 Current liabilities 
 Trade and other 
  payables                        9        (15,595)        (20,055)       (20,112) 
 Interest-bearing 
  loans and borrowings           10        (26,733)        (20,325)       (26,708) 
---------------------------  ------  --------------  --------------  ------------- 
                                           (42,328)        (40,380)       (46,820) 
---------------------------  ------  --------------  --------------  ------------- 
 Net current (liabilities) 
  / assets                                  (1,770)           2,620        (4,243) 
---------------------------  ------  --------------  --------------  ------------- 
 Non-current liabilities 
 Provision for 
  rehabilitation                            (8,800)         (9,223)        (8,554) 
 Interest-bearing 
  loans and borrowings           10        (17,257)        (30,186)       (22,588) 
 Deferred tax liability                    (18,498)        (16,218)       (15,435) 
---------------------------  ------  --------------  --------------  ------------- 
                                           (44,555)        (55,627)       (46,577) 
---------------------------  ------  --------------  --------------  ------------- 
 Total liabilities                         (86,883)        (96,007)       (93,397) 
---------------------------  ------  --------------  --------------  ------------- 
 Net assets                                  79,077          82,566         78,644 
---------------------------  ------  --------------  --------------  ------------- 
 Equity 
 Share capital                   11           1,993           1,978          1,993 
 Share premium 
  account                                    32,325          32,246         32,325 
 Share-based payment 
  reserve                                       292             698            283 
 Merger reserve                              46,206          46,206         46,206 
 Retained (loss) 
  / earnings                                (1,739)           1,438        (2,163) 
 Total equity                                79,077          82,566         78,644 
---------------------------  ------  --------------  --------------  ------------- 
 

Anglo Asian Mining plc

Condensed group cash flow statement

Six months ended 30 June 2016

 
                                                  6 months       6 months 
                                                        to             to 
                                                   30 June        30 June 
                                                      2016           2015 
                                               (unaudited)    (unaudited) 
                                                      $000           $000 
--------------------------------------  ---  -------------  ------------- 
 Profit / (loss) before taxation                     3,488        (4,124) 
 Adjustments for: 
 Finance costs                                       2,546          2,980 
 Depreciation of property, 
  plant and equipment                                9,844         10,780 
 Amortisation of mining rights 
  and other intangible assets                          954          1,026 
 Share-based payment expense                             9             28 
 Write down of unrecoverable 
  inventory                                             78              - 
--------------------------------------  ---  -------------  ------------- 
 Operating cash flow before 
  movements in working capital                      16,919         10,690 
 Increase in trade and other 
  receivables                                      (1,372)        (1,381) 
 (Increase) / decrease in inventories              (1,020)          4,261 
 Increase in trade and other 
  payables                                           2,388          1,969 
-------------------------------------------  -------------  ------------- 
 Cash generated from operations                     16,915         15,539 
 Income tax paid                                         -              - 
--------------------------------------  ---  -------------  ------------- 
 Net cash generated from operating 
  activities                                        16,915         15,539 
-------------------------------------------  -------------  ------------- 
 Investing activities 
 Expenditure on property, plant 
  and equipment and mine development               (6,576)        (9,141) 
 Investment in exploration 
  and evaluation activities                          (134)          (201) 
 Net cash used in investing 
  activities                                       (6,710)        (9,342) 
-------------------------------------------  -------------  ------------- 
 Financing activities 
 Proceeds from borrowing                             6,105          3,404 
 Repayment of borrowings                          (11,468)        (5,772) 
 Interest paid                                     (1,829)        (2,367) 
-------------------------------------------  -------------  ------------- 
 Net cash outflow from financing 
  activities                                       (7,192)        (4,735) 
-------------------------------------------  -------------  ------------- 
 Net increase in cash and cash 
  equivalents                                        3,013          1,462 
 Cash and cash equivalents 
  at beginning of period                               249            322 
-------------------------------------------  -------------  ------------- 
 Cash and cash equivalents 
  at end of the period                               3,262          1,784 
-------------------------------------------  -------------  ------------- 
 

Anglo Asian Mining plc

Condensed group statement of changes in equity

Six months ended 30 June 2016

(Unaudited)

 
                                        Share-based 
                      Share     Share       payment    Merger   Retained    Total 
                    capital   premium       reserve   reserve       loss   equity 
                       $000      $000          $000      $000       $000     $000 
--------------  -----------  --------  ------------  --------  ---------  ------- 
 1 January 
  2016                1,993    32,325           283    46,206    (2,163)   78,644 
 Profit for 
  the period              -         -             -         -        424      424 
 Share based 
  payment                 -         -             9         -          -        9 
--------------  -----------  --------  ------------  --------  ---------  ------- 
 30 June 2016         1,993    32,325           292    46,206    (1,739)   79,077 
--------------  -----------  --------  ------------  --------  ---------  ------- 
 

Six months ended 30 June 2015

(Unaudited)

 
                                        Share-based 
                      Share     Share       payment    Merger   Retained     Total 
                    capital   premium       reserve   reserve   earnings    equity 
                       $000      $000          $000      $000       $000      $000 
--------------  -----------  --------  ------------  --------  ---------  -------- 
 1 January 
  2015                1,978    32,246           670    46,206      4,816    85,916 
 Loss for the 
  period                  -         -             -         -    (3,378)   (3,378) 
 Share based 
  payment                 -         -            28         -          -        28 
--------------  -----------  --------  ------------  --------  ---------  -------- 
 30 June 2015         1,978    32,246           698    46,206      1,438    82,566 
--------------  -----------  --------  ------------  --------  ---------  -------- 
 

Anglo Asian Mining plc

Notes to the condensed group financial statements

Six months ended 30 June 2016

   1    General information 

Anglo Asian Mining plc (the "Company") is a company incorporated in England and Wales under the Companies Act 2006. The Company's ordinary shares are traded on the AIM market of the London Stock Exchange plc. The Company is a holding company. The principal activity of the Company and its subsidiaries (the "Group") is operating a portfolio of mining operations and metal production facilities within Azerbaijan.

Basis of preparation

The condensed group financial statements for the six month period to 30 June 2016 have been prepared in accordance with International Accounting Standard 34 'Interim Financial Reporting' as issued by the International Accounting Standards Board. The information for the half year ended 30 June 2016 does not constitute statutory accounts as defined in section 435 of the Companies Act 2006. A copy of the statutory accounts for the year ended 31 December 2015 has been delivered to the Registrar of Companies. The auditor's report on those accounts was not qualified, did not include a reference to any matters to which the auditor drew attention by way of an emphasis of matter and did not contain a statement under sections 498(2) or 498(3) of the Companies Act 2006. The condensed group financial statements have not been audited.

The condensed group financial statements have been prepared under the historical cost convention except for the treatment of share based payments. The condensed group financial statements are presented in United States dollars ("$") and all values are rounded to the nearest thousand except where otherwise stated. In the condensed group financial statements "GBP" and "pence" are references to the United Kingdom pound sterling.

Accounting policies

The annual financial statements of Anglo Asian Mining plc are prepared in accordance with IFRSs as issued by the International Accounting Standards Board and as adopted by the European Union. The condensed group financial statements included in this half-yearly financial report have been prepared in accordance with International Accounting Standard 34 'Interim Financial Reporting', as issued by the International Accounting Standards Board and adopted by the European Union.

The accounting policies adopted in the 2016 half-yearly condensed group financial statements are the same as those adopted in the 2015 annual report and accounts, other than those in respect of new and revised standards that become effective from 1 January 2016 as follows:

   -       Amendments to IAS 1 Disclosure Initiative. 

- Annual IFRS Improvements Process - IAS 34 Interim Financial Reporting - Disclosure of information 'elsewhere in the interim financial report'.

The adoption of these standards has had no material impact on the 2016 half-yearly condensed group financial statements.

Going concern

The directors have prepared the condensed group financial statements on a going concern basis after reviewing the Group's cash position for the period to 31 December 2017 and satisfying themselves that the Group will have sufficient funds on hand to realise its assets and meet its obligations as and when they fall due.

In making this assessment the directors have acknowledged the challenging and uncertain market conditions in which the Group is operating. In 2015, the price of gold averaged $1,160 per ounce with a high of $1,298 per ounce and a low of $1,060 per ounce. However, 2016 has seen a small but significant increase in the price of gold and during the period 1 January to 30 June 2016, the price of gold averaged $1,210 per ounce. In addition, 2016 and 2017 will see the benefit of a full years' contribution of revenues from the flotation plant.

The Group commenced making payments on the principal of its debt in 2015. At the date of these condensed group financial statements, the Group has made all payments of interest and principal on time.

The Group's loan agreement with the Amsterdam Trade Bank contains a debt service cover ratio ("DSCR") covenant of at least 1.25. This ratio is calculated twice a year from its published financial statements. The Group has so far met the DSCR of 1.25 for all reporting periods subsequent to loan drawdown. For the full year to 31 December 2016 and subsequent periods, the Group's forecasts show the Group can meet the debt service cover ratio of 1.25 as specified.

Key to achieving the Group's forecast cash position, and therefore its going concern assumption are the following:

- achieving the forecast production of gold doré from its heap and agitation leaching facilities.

- achieving the forecast production of precious metal concentrates from its SART and flotation processing.

   -               its metal (principally gold and copper) price assumptions being met or bettered. 

Should there be a moderate and sustained decrease in either the production or metal price assumptions, doubt would be cast over the Group's short term cash position. Under this circumstance, the Group would look to defer all non-essential capital expenditure and administrative costs in order to preserve cash. The Group also has access to local sources of short term finance to meet any shortfalls.

The Group's assumptions are based on best estimates and appropriate sensitivities have been applied. Appropriate rigour and diligence has been performed by the directors in approving the assumptions. The directors believe all assumptions are prepared on a realistic basis using the best available information.

After making due enquiry, the directors have a reasonable expectation that the Group has adequate resources to continue in operational existence for the foreseeable future. Accordingly, the Group continues to adopt the going concern basis in preparing the financial statements.

   2    Operating segments 

The Group determines operating segments based on the information that is internally provided to the Group's chief operating decision maker. The chief operating decision maker has been identified as the board of directors. The board of directors currently considers consolidated financial information for the entire Group and reviews the business based on the Group income statement and Group statement of financial position in their entireties. Accordingly, the Group has only one operating segment, mining operations. The mining operations comprise the Group's major producing asset, the Gedabek mines which accounts for all the Group's revenues and the majority of its cost of sales, depreciation and amortisation. The Group's mining operations are all located within Azerbaijan and therefore all within one geographic segment.

All sales of gold and silver bullion are made to one customer, the Group's gold refinery, MKS Finance SA, based in Switzerland. Copper concentrate is sold to Industrial Minerals SA.

   3    Income tax 

Income tax (charge) or credit during the period represents the change in deferred tax liability during the period incurred by the RV Investment Group Services LLC (a wholly owned subsidiary of the Company) representative office registered in Azerbaijan.

The deferred tax asset or liability is calculated at the tax rates that are expected to apply in the period when the liability is settled or the asset is realised. Deferred tax is charged or credited in the income statement, except when it relates to items charged or credited directly to equity, in which case the deferred tax is also dealt with in equity.

Deferred tax assets and liabilities are offset when there is a legally enforceable right to offset current tax assets against current tax liabilities and when they relate to income taxes levied by the same taxation authority and the Group intends to settle its current tax assets and liabilities on a net basis.

Deferred tax liability increased in the 6 months to 30 June 2016 due to a decrease in temporary differences arising from a decrease of unused tax losses during the period.

At the statement of financial position date, the Group has unused tax losses within the Company and a subsidiary (Anglo Asian Operations Limited) available for offset against future profits. No deferred tax asset has been recognised in respect of such losses due to the unpredictability of future profit streams. Unused tax losses may be carried forward indefinitely.

   4    Profit / (loss) per ordinary share 
 
                                   6 months           6 months 
                                         to                 to 
                                    30 June            30 June 
                                       2016               2015 
                                (unaudited)        (unaudited) 
 Profit / (loss) per                   $000               $000 
  ordinary share 
 
 Profit / (loss) after 
  tax for the period                    424            (3,378) 
 Basic profit / (loss) 
  per share (US cents)                 0.38             (3.02) 
 Diluted profit / 
  (loss) per share 
  (US cents)                           0.38             (3.02) 
                              -------------      ------------- 
 
 
 Weighted average                    Number             Number 
  number of shares 
-----------------------  ---  -------------      ------------- 
 
 For basic earnings 
  per share                     112,661,024        111,683,972 
 For diluted earnings 
  per share                     113,761,024        111,683,972 
                              -------------      ------------- 
 
 
 
 
   5    Intangible assets 
 
 
                         Exploration                         Other 
                        & evaluation         Mining     intangible 
                             Ordubad         rights         assets          Total 
                         (unaudited)    (unaudited)    (unaudited)    (unaudited) 
                                $000           $000           $000           $000 
--------------------  --------------  -------------  -------------  ------------- 
 Cost 
 1 January 2015                3,513         41,925            468         45,906 
 Additions                       347              -             30            377 
 31 December 
  2015                         3,860         41,925            498         46,283 
 Additions                       134              -              -            134 
--------------------  --------------  -------------  -------------  ------------- 
 30 June 2016                  3,994         41,925            498         46,417 
--------------------  --------------  -------------  -------------  ------------- 
 
 
 Amortisation 
  and impairment 
 1 January 2015                    -         25,606            255         25,861 
 Charge for year                   -          2,020             29          2,049 
 31 December 
  2015                             -         27,626            284         27,910 
 Charge for period                 -            940             14            954 
--------------------  --------------  -------------  -------------  ------------- 
 30 June 2016                      -         28,566            298         28,864 
--------------------  --------------  -------------  -------------  ------------- 
 
 
 Net book value 
 31 December 
  2015                         3,860         14,299            214         18,373 
--------------------  --------------  -------------  -------------  ------------- 
 30 June 2016                  3,994         13,359            200         17,553 
--------------------  --------------  -------------  -------------  ------------- 
 
 
   6    Property, plant and equipment 
 
 
               Plant 
                 and 
                          equipment, 
                               motor 
                            vehicles 
                                 and                         Assets 
                           leasehold      Producing           under 
                        improvements          mines    construction          Total 
                         (unaudited)    (unaudited)     (unaudited)    (unaudited) 
                                $000           $000            $000           $000 
--------------------  --------------  -------------  --------------  ------------- 
 Cost 
 1 January 2015               19,409        159,898           2,093        181,400 
 Additions                       257          6,810           7,222         14,289 
 Transfer to 
  producing mines                  -          8,838         (8,838)              - 
 Decrease in 
  provision for 
  rehabilitation                   -          (484)               -          (484) 
 31 December 
  2015                        19,666        175,062             477        195,205 
 Additions                       205          3,169           2,184          5,558 
 Transfer to 
  producing mines                  -          1,279         (1,279)              - 
 30 June 2016                 19,871        179,510           1,382        200,763 
--------------------  --------------  -------------  --------------  ------------- 
 
 
 Depreciation 
  and impairment 
 1 January 2015               10,761         56,208               -         66,969 
 Charge for year               1,881         17,927               -         19,808 
 31 December 
  2015                        12,642         74,135               -         86,777 
 Charge for period               991          8,854               -          9,845 
--------------------  --------------  -------------  --------------  ------------- 
 30 June 2016                 13,633         82,989               -         96,622 
--------------------  --------------  -------------  --------------  ------------- 
 
 
 Net book value 
 31 December 
  2015                         7,024        100,927             477        108,428 
--------------------  --------------  -------------  --------------  ------------- 
 30 June 2016                  6,238         96,521           1,382        104,141 
--------------------  --------------  -------------  --------------  ------------- 
 
 
   7     Inventory 
 
 
                                        30 June         30 June    31 December 
                               2016 (unaudited)            2015           2015 
  Non-current assets                       $000     (unaudited)      (audited) 
                                                           $000           $000 
---------------------------  ------------------  --------------  ------------- 
 Cost 
 Ore stockpiles                           2,595           2,071          2,543 
---------------------------  ------------------  --------------  ------------- 
 
 Current assets 
---------------------------  ------------------  --------------  ------------- 
 Cost 
 Finished goods 
  - bullion                                 680           1,078          1,441 
 Finished goods 
  - metal in concentrate                    507             159            203 
 Metal in circuit                        12,618          16,267         11,899 
 Ore stockpiles                           5,040           2,043          4,635 
 Spare parts and 
  consumables                             8,242           9,146          8,019 
---------------------------  ------------------  --------------  ------------- 
 Total current inventories               27,087          28,693         26,197 
---------------------------  ------------------  --------------  ------------- 
 Total inventories                       29,682          30,764         28,740 
---------------------------  ------------------  --------------  ------------- 
 
 
 

Current ore stockpiles consist of high-grade and low-grade oxide ores that are expected to be processed during the 12 months subsequent to the balance sheet date.

Non-current ore stockpiles consist of high-grade sulphide ore that is expected to be processed more than 12 months after the balance sheet date.

Inventory is recognised at lower of cost or net realisable value.

   8    Trade and other receivables 
 
 
                                        30 June         30 June      31 December 
                               2016 (unaudited)            2015             2015 
  Non-current assets                       $000     (unaudited)        (audited) 
                                                           $000             $000 
---------------------------  ------------------  --------------  --------------- 
 Advances for fixed 
  asset purchases                         1,018             677                - 
 Loans                                       95             141              120 
---------------------------  ------------------  --------------  --------------- 
                                          1,113             818              120 
---------------------------  ------------------  --------------  --------------- 
 
 Current assets 
---------------------------  ------------------  --------------  ------------- 
 Gold held due to the 
  Government of Azerbaijan                5,093           8,349         12,412 
 VAT refund due                             319             538            186 
 Other tax receivable                       789             617            720 
 Trade receivables                        1,820             341            642 
 Prepayments and advances                 2,138           2,628          2,121 
 Loans                                       50              50             50 
                                         10,209          12,523         16,131 
---------------------------  ------------------  --------------  ------------- 
 
 

The carrying amount of trade and other receivables approximates to their fair value.

The VAT refunds due relate to VAT paid on purchases.

Gold bullion held and transferable to the Government of Azerbaijan is bullion held by the Group due to the Government of Azerbaijan. The Group holds the Government's share of the product from its mining activities and from time to time transfers that product to the Government of Azerbaijan. A corresponding liability to the Government of Azerbaijan is included in trade and other payables as disclosed in note 9.

The Group does not consider any trade and other receivables as past due or impaired.

   9   Trade and other payables 
 
                                             30 June                       31 December 
                                    2016 (unaudited)                              2015 
                                                $000             30 June 
                                                        2015 (unaudited)     (audited) 
                                                                    $000          $000 
---------------------------------  -----------------  ------------------  ------------ 
 Accruals and other payables                   4,349               6,768         4,861 
 Derivative liability                            262                   -             - 
 Trade creditors                               4,711               4,594         2,302 
 Gold held due to the Government 
  of Azerbaijan                                5,093               8,349        12,412 
 Payable to the Government 
  of Azerbaijan from copper 
  concentrate joint sale                       1,180                 344           537 
---------------------------------  -----------------  ------------------  ------------ 
                                              15,595              20,055        20,112 
---------------------------------  -----------------  ------------------  ------------ 
 
   10   Interest-bearing loans and borrowings 
 
 Amortised cost 
 
 
                                            30 June             30 June       31 December 
                                   2016 (unaudited)    2015 (unaudited)    2015 (audited) 
                                               $000                $000              $000 
--------------------------------  -----------------  ------------------  ---------------- 
 International Bank of 
  Azerbaijan - agitation 
  leaching plant loan                         8,700              11,809            10,209 
 International Bank of 
  Azerbaijan - loan facilities                3,320               1,500             1,500 
 Amsterdam Trade Bank                        22,186              31,899            27,096 
 Atlas Copco - vendor financing               1,390                 727               355 
 Yapi Kredit Bank                             1,373                 434             1,659 
 Pasha Bank                                   3,161               2,142             4,617 
 Director                                     3,860               2,000             3,860 
--------------------------------  -----------------  ------------------  ---------------- 
 Total interest bearing 
  loans and borrowings                       43,990              50,511            49,296 
--------------------------------  -----------------  ------------------  ---------------- 
 
 Loans repayable in less 
  than one year                              26,733              20,325            26,708 
 Loans repayable in more 
  than one year                              17,257              30,186            22,588 
--------------------------------  -----------------  ------------------  ---------------- 
 Total interest bearing 
  loans and borrowings                       43,990              50,511            49,296 
--------------------------------  -----------------  ------------------  ---------------- 
 
 
 

International Bank of Azerbaijan

Agitation leaching plant loan

In 2012 and 2013, the Group borrowed $49.5 million under a series of loan agreements to finance the construction of its agitation leaching plant. The interest rate for each agreement is 12 per cent. The repayment of principal begins two years from the withdrawal date for each agreement. The loans were partially repaid by the proceeds of a refinancing loan from Amsterdam Trade Bank. The loan agreements are repayable commencing in 31 March 2015 and finishing in 30 June 2018.

Loan facilities

During 2014, the Group entered into a credit facility for $1.5 million for a period of one year at an interest rate of 12 per cent. The repayment date of the credit facility was extended in 2015 and the loan was repaid in July 2016.

In January and March 2016, the Group entered into two credit facilities for AZN1.0 million and $1.5 million respectively. Both loans are repayable in equal monthly installments over a period of one year and have an interest rate of 18 and 12 per cent. respectively.

Amsterdam Trade Bank

During 2013, the Group entered into a loan agreement for $37.0 million to refinance its agitation leaching plant loan from the International Bank of Azerbaijan. The interest rate is 8.25 per cent. per annum plus LIBOR. Principal is repayable in 15 equal quarterly installments of $2,467,000. The first payment of principal commenced in February 2015 with the final installment payable in August 2018. The Group has pledged to the bank its present and future claims against MKS Finance SA, the Group's sole refiner of gold doré and buyer of gold and silver bullion until termination of the loan agreement.

Atlas Copco

The amount outstanding is in respect of two vendor equipment financing contracts. It comprises EUR324,000 which was repaid in August 2016 and EUR1,104,500 which was a new financing in 2016 for underground equipment. The 2016 financing carries an interest rate of 8.14 per cent. per annum and is repayable in 8 equal annual installments commencing in August 2016 with the final repayment in May 2018.

Yapi Credit Bank, Azerbaijan

The amount outstanding is in respect of 2 letters of credit. The interest rate for the letters of credit is 10 per cent. and both are repayable within 12 months of drawdown.

Pasha Bank

Letters of credit for flotation plant construction

In 2014, the Group entered into a facility for $2.5 million to finance a letter of credit for the construction of its flotation plant. The facility carries an interest rate of 6 per cent. for the unused portion of, and 6.8 per cent. plus one month LIBOR for the used portion of the credit facility. In 2015, an additional facility was entered into for $1.0 million which carries an interest rate of 6.2 per cent. for the unused portion and 7.05 per cent. plus one month LIBOR for the used portion of the credit facility. The total amount outstanding under the two facilities at 30 June 2016 was $1,837,000 (31 December 2015: $3,233,000). The total amount outstanding under the two facilities is repayable in November 2016.

Letters of credit for cyanide purchases

On 4 July 2014, the Group entered into a credit facility to finance letters of credit with a total amount of $3,059,000 (ANZ 2.4 million) for the purchase of cyanide. This facility was extended in 2015 to 7 July 2017 for a total amount of $3 million at an interest rate of 3 per cent. The amount outstanding under these facilities as 30 June 2016 was $1,324,000 (31 December 2015: $1,384,000). The amounts outstanding are all repayable within 12 months of the balance sheet date.

Director

On 20 May 2015, the chief executive of Anglo Asian Mining PLC provided a $4 million loan facility to the Group. Any loan from the facility was initially repayable on 8 January 2016 at an interest rate of 10 per cent. On 8 January, 2016 the repayment date for the loan facility was extended till 8 July 2016 with all other terms remaining the same. The loan has been subsequently extended a further six months on identical terms.

As Reza Vaziri, the chief executive of Anglo Asian Mining PLC is a director of the Company, the loan constitutes a related party transaction pursuant to AIM rule 13. The independent directors (being Khosrow Zamani, Richard Round, John H. Sununu and John Monhemius) consider, that having consulted with the Company's nominated adviser, SP Angel Corporate Finance LLP, that the terms of the loan are fair and reasonable insofar as its shareholders are concerned.

11 Share capital

 
                                       shares   US$000 
-------------------------------  ------------  ------- 
 Ordinary shares issued and 
  fully paid: 
 1 January 2015                   111,683,972    1,978 
 Shares issued in lieu of cash 
  payment                             977,052       15 
 31 December 2015 and 30 June 
  2016                            112,661,024    1,993 
-------------------------------  ------------  ------- 
 

12 Contingencies and commitments

The Group undertakes its mining operations in the Republic of Azerbaijan pursuant to the provisions of the agreement on the exploration, development and production sharing for the prospective gold mining areas: Gedabek, Gosha, Ordubad Group (Piazbashi, Agyurt, Shakardara, Kiliyaki), Soutely, Kyzilbulag and Vejnali deposits dated 20 August 1997 (the "PSA"). The PSA contains various provisions relating to the obligations of the R.V. Investment Group Services LLC ("RVIG"), a wholly owned subsidiary of the Company, with regards to the exploration and development programme, preparation and timely submission of reports to the Government, compliance with environmental and ecological requirements, etc. The directors believe that RVIG is in compliance with the requirements of the PSA. The Group has submitted a development and production programme to the Ministry of Ecology and Natural Resources of the Government of Azerbaijan in accordance with the PSA requirements.

The mining licence of Gedabek expires in March 2022, with options to extend the licence by ten years conditional upon satisfaction by RVIG of certain requirements stipulated in the PSA.

RVIG is also required to comply with the clauses contained in the PSA relating to environmental damage. The directors believe RVIG is substantially in compliance with the environmental clauses contained in the PSA.

There were no operating lease commitments at 30 June 2016.

On 20 January 2012, the Group entered into a non-cash credit line agreement in the amount of $3,000,000 for letter of credits with YapiKredi Bank Azerbaijan. A new pledge agreement was signed with YapiKredi Bank Azerbaijan for guarantee of letters of credit opened under the above mentioned agreement. According to this pledge agreement, movable equipment for the amount of $3,402,000 was pledged to guarantee letters of credit opened under the agreement.

13 Related party transactions

Transactions between the Company and its subsidiaries, which are related parties, have been eliminated on consolidation and are not disclosed in this note. Transactions between the Group and other related parties are disclosed below.

Trading transactions

During the period, there were no trading transactions between group companies and related parties who are not members of the Group.

Other related party transactions

a) Total payments in the 6 months to 30 June 2016 of $778,000 (6 months to 30 June 2015: $544,000 ) were made for equipment and spare parts purchased from Proses Muhendislik Danismanlik Inshaat veTasarim Anonim Shirket ("PMDI"), the entity in which the chief technical officer of Azerbaijan International Mining Company has a direct ownership interest. There is an outstanding advance payment to PMDI at 30 June 2016 of $138,000 (30 June 2015: $71,000 and 31 December 2015: $65,000).

b) On 22 July 2015, 977,052 ordinary shares were issued to three directors to settle certain fees and expenses of those directors. The total amount of fees and expenses settled was $115,054 and $1,962 respectively.

c) On 20 May 2015, the chief executive made a $4 million loan facility available to the Group. The interest accrued and unpaid at 30 June 2016 was $394,000 (30 June 2015: $22,000 and 31 December 2015: $195,000). Details of the loan are disclosed in note 10 - "Interest-bearing loans and borrowings".

14 Approval of condensed group financial statements

The condensed group financial statements of Anglo Asian Mining plc and its subsidiaries for the six month period ended 30 June 2016 were authorised for issue in accordance with a resolution of the directors on 9 September 2016.

**ENDS**

For further information please visit www.angloasianmining.com or contact:

 
                       Anglo Asian Mining   Tel: +994 12 596 
 Reza Vaziri            plc                  3350 
--------------------  -------------------  ------------------ 
                       Anglo Asian Mining   Tel: +994 502 910 
 Bill Morgan            plc                  400 
--------------------  -------------------  ------------------ 
 Ewan Leggat           SP Angel Corporate   Tel: +44 (0) 20 
                        Finance LLP          3470 0470 
                        Nominated Adviser 
                        and Broker 
--------------------  -------------------  ------------------ 
 Laura Harrison        SP Angel Corporate   Tel + 44 (0) 20 
                        Finance LLP          3470 0470 
--------------------  -------------------  ------------------ 
 Lottie Brocklehurst   St Brides Partners   Tel: +44 (0) 20 
                        Ltd                  7236 1177 
--------------------  -------------------  ------------------ 
 Susie Geliher         St Brides Partners   Tel: +44 (0) 20 
                        Ltd                  7236 1177 
--------------------  -------------------  ------------------ 
 

Competent Person Statement

The information in the announcement that relates to exploration results is based on information compiled by Stephen Westhead who is Director of Geology at the Anglo Asian Mining group and a member of the Geological Society of London and a Chartered Geologist.

Stephen Westhead has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking, to qualify as a qualified person as defined by the AIM rules. Stephen Westhead has reviewed the exploration results included in this announcement.

Notes

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gedabek is an open cast mine with a series of interconnected pits. The Company is also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

Gold production for the year ended 31 December 2015 from Gedabek totaled 72,032 ounces with 969 tonnes of copper also produced. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

This information is provided by RNS

The company news service from the London Stock Exchange

END

IR SSFFDUFMSEFU

(END) Dow Jones Newswires

September 12, 2016 02:00 ET (06:00 GMT)

1 Year Anglo Asian Chart

1 Year Anglo Asian Chart

1 Month Anglo Asian Chart

1 Month Anglo Asian Chart

Your Recent History

Delayed Upgrade Clock