ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

AAZ.GB Anglo Asian

63.00
0.00 (0.00%)
06:56:49 - Realtime Data
Share Name Share Symbol Market Type Share ISIN Share Description
Anglo Asian AQSE:AAZ.GB Aquis Stock Exchange Ordinary Share GB00B0C18177
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 63.00 59.00 67.00 63.00 63.00 63.00 0.00 06:56:49
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Anglo Asian Mining PLC Gedabek Connected to Power Grid & Operation Update (4792Q)

30/11/2016 7:00am

UK Regulatory


Anglo Asian (AQSE:AAZ.GB)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Anglo Asian Charts.

TIDMAAZ

RNS Number : 4792Q

Anglo Asian Mining PLC

30 November 2016

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

30 November 2016

Anglo Asian Mining plc

Gedabek gold, copper and silver mine connected to Azerbaijan power grid and operations update

Anglo Asian Mining plc ("Anglo Asian" or "the Company"), the AIM listed gold, copper and silver producer in Azerbaijan, announces an operational update from its Gedabek mine ("Gedabek") in western Azerbaijan. The Company is pleased to report that its Gedabek mine site is now connected to the Azerbaijan national power grid. This will result in the Gedabek mine site using cleaner and cheaper power which up to now has been provided by diesel generators. The Company's website has also been revised and expanded to include details of the electrical installation and other recent developments (www.angloasianmining.com) and these revisions will be made live shortly. Note that all references to "$" and "cents" are to the United States dollar.

Highlights

   --    Gedabek site now connected to the Azerbaijan national power grid 
   --    Expected annual cost savings of approximately $2.3 million 
   --    Payback of capital cost of electrical installation expected in around one year 
   --    Reduction in diesel fuel consumed of around 11 million litres per annum 

-- Full Year 2016 gold production target slightly reduced to between 67,000 to 69,000 ounces from 69,000 ounces and 71,000 ounces due to recent lower grade ore from the Gadir underground mine and the transition to the new power source

Anglo Asian CEO, Reza Vaziri, said, "I am absolutely delighted to announce that the Gedabek site is now connected to the Azerbaijan national power grid. This enables us to operate the site at a considerably reduced cost and in a cleaner and more sustainable manner. It will also enable us to expand production at the Gedabek site, unconstrained by the availability of electrical power. The diesel electrical generators at site will be retired from service but kept as backup, which will de-risk the operation to power outages. This is the culmination of over two years of work by both the Company and various departments within the Government of Azerbaijan. I would like to thank everybody for their efforts in this successful project.

"Although we are reducing our full year gold production target by 2,000 ounces, the Company's recent return to profitability will be now be further enhanced by the cost savings resulting from connection to the power grid and release of power constraints on our processing.

"This has been a busy few months for Anglo Asian and as a result we have considerably revised and expanded our website to include recent developments. This includes not only details of the electrical installation but also the recent developments in exploration."

Further details on connection of Gedabek to Azerbaijan power grid

The capital works to connect the Gedabek site to the Azerbaijan national power grid comprised installation of the following:

- Seven kilometres of 35 kilovolt overhead power cable and five kilometres of 6.3 kilovolt overhead distribution line.

   -    Two main and five auxiliary electricity transformers. 

- An electrical power house comprising two sets of 6.3 and 35 kilovolt electrical panels and ancillary measuring equipment.

The total cost of the installation was $2.1 million. Electricity is currently being purchased from the grid at a cost of 3.5 cents per kilowatt hour. As a result of the connection to the grid, the Gedabek site will no longer consume around 11 million litres of diesel fuel per annum to generate electrical power. This will result in a cost saving of approximately $2.3 million per annum and therefore the capital cost of the installation will be recovered in around one year. The reduction in fuel usage will substantially reduce fuel management at the site and the consequent environmental risk.

The Company's nine existing diesel generators will not now be used but will be kept as a standby power supply.

Note that translation of amounts from Azerbaijani New Manats (AZN) to United States dollars has been carried out at the current rate of $1 = 1.71 AZN.

**ENDS**

For further information please visit www.angloasianmining.com or contact:

 
                       Anglo Asian Mining   Tel: +994 12 596 
 Reza Vaziri            plc                  3350 
--------------------  -------------------  ------------------ 
                       Anglo Asian Mining   Tel: +994 502 910 
 Bill Morgan            plc                  400 
--------------------  -------------------  ------------------ 
                       Anglo Asian Mining   Tel: +994 502 916 
 Stephen Westhead       plc                  894 
--------------------  -------------------  ------------------ 
 Ewan Leggat           SP Angel Corporate   Tel: +44 (0) 20 
                        Finance LLP          3470 0470 
                        Nominated Adviser 
                        and Broker 
--------------------  -------------------  ------------------ 
 Laura Harrison        SP Angel Corporate   Tel + 44 (0) 20 
                        Finance LLP          3470 0470 
--------------------  -------------------  ------------------ 
 Lottie Brocklehurst   St Brides Partners   Tel: +44 (0) 20 
                        Ltd                  7236 1177 
--------------------  -------------------  ------------------ 
 Susie Geliher         St Brides Partners   Tel: +44 (0) 20 
                        Ltd                  7236 1177 
--------------------  -------------------  ------------------ 
 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gedabek is an open cast mine with a series of interconnected pits. The Company also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

Gold production for the year ended 31 December 2015 from Gedabek totalled 72,032 ounces with 969 tonnes of copper also produced. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015.

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCPGGGUGUPQGRB

(END) Dow Jones Newswires

November 30, 2016 02:00 ET (07:00 GMT)

1 Year Anglo Asian Chart

1 Year Anglo Asian Chart

1 Month Anglo Asian Chart

1 Month Anglo Asian Chart

Your Recent History

Delayed Upgrade Clock