ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

AMA Amara Ming

17.25
0.00 (0.00%)
18 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Amara Ming LSE:AMA London Ordinary Share GB00B04M1L91 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 17.25 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Amara Mining PLC H1 2015 Results (7627V)

12/08/2015 7:00am

UK Regulatory


Amara (LSE:AMA)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Amara Charts.

TIDMAMA

RNS Number : 7627V

Amara Mining PLC

12 August 2015

12 August 2015 AIM: AMA

Amara Mining plc

(with its subsidiaries, "Amara" or "the Group")

H1 RESULTS 2015

Amara, the AIM-listed West African-focused gold exploration/development group, is pleased to announce an update for the half year ended 30 June 2015 ("H1 2015").

HIGHLIGHTS

-- Maiden Mineral Reserve reported of 2.7Moz (70.4Mt at 1.18g/t) for Yaoure Gold Project ("Yaoure") as part of Pre-Feasibility Study ("PFS"), underlining the economic viability of this large scale deposit

-- Optimisation work is underway to further improve Yaoure's economics. Initial results demonstrate opportunities to:

o Increase the head grade of the Mineral Reserve through the selective mining of the higher grade CMA zone

o Decrease Yaoure's upfront capital cost through reducing the size of the mining fleet and the size of the plant and removing the need for pre-stripping

-- 12,000 metre drilling programme underway in the Yaoure Central zone to upgrade a portion of the remaining Inferred resources to the higher confidence Indicated category and to improve continuity within higher grade areas - Mineral Resource update expected Q4 2015

-- Application for mining exploitation licence for Yaoure lodged with the government of Côte d'Ivoire, including the submission of the Environment and Social Impact Assessment ("ESIA")

-- New 206km(2) exploration licence called Yaoure East obtained to the east of the current Yaoure exploration licence area

-- Second strong growth opportunity in Baomahun Gold Project ("Baomahun") - potential to be a compelling second project for Amara, assisting the Group in its goal of becoming a mid-tier producer

-- Cash as at 30 June 2015 of US$13.6 million following successful placing to raise US$21 million (net of costs) in January 2015

   --     Amara remains well funded to advance the Bankable Feasibility Study ("BFS") 

John McGloin, Chairman and Chief Executive Officer of Amara, commented:

"H1 2015 has been an important period for Amara as we have reported a maiden Mineral Reserve for Yaoure as part of the PFS and increased the project's resources to 6.8 million ounces. Although recent weeks have been challenging for the gold sector, we continue to advance Yaoure along its development path and remain fully-funded to do this. Our focus in H2 2015 is to progress our understanding of the optimisation opportunities identified by the PFS, which include increasing the head grade of the CMA zone through selective mining and reducing the upfront capital cost. Drilling is also underway to further improve our understanding of the Yaoure Central zone, which is expected to strengthen the overall economics of the project. I look forward to updating the market on Yaoure's progress over the coming months."

For more information please contact:

 
  Amara Mining plc 
    John McGloin, Chairman and Chief 
    Executive Officer 
    Pete Gardner, Finance Director 
    Katharine Sutton, Head of Investor     +44 (0)20 7398 
    Relations                                        1420 
   Peel Hunt LLP 
    (Nominated Adviser & Joint Broker) 
    Matthew Armitt                         +44 (0)20 7418 
    Ross Allister                                    8900 
   GMP Securities Europe LLP 
    (Joint Broker) 
    Richard Greenfield                     +44 (0)20 7647 
    Alex Carse                                       2800 
   Farm Street Communications 
    (Media Relations)                     +44 (0)7593 340 
    Simon Robinson                                    107 
 

About Amara Mining plc

Amara is a gold explorer/developer with assets in West Africa. The Group is focused on unlocking the value in its development projects. At Yaoure in Côte d'Ivoire, this will be done by increasing the confidence in the existing Mineral Resource and economics at the project as Amara progresses it through to Bankable Feasibility Study. At Baomahun, this will be achieved by gaining an improved understanding of the exploration upside potential and underground opportunity. Amara aims to further increase its production profile with highly prospective opportunities across both assets.

OPERATIONAL REVIEW

YAOURE GOLD PROJECT, CÔTE D'IVOIRE

Yaoure has the potential to be one of the largest gold mines in Africa. With 6.8 million ounces of Mineral Resources (4.4 million ounces Indicated and 2.6 million ounces Inferred), Yaoure is the largest undeveloped gold project in West Africa.

 
             Classification    Tonnes (Mt)   Grade (g/t)   Gold (Moz) 
----------  ----------------  ------------  ------------  ----------- 
 RESERVES calculated at US$975/oz 
 Open pit       Probable          70.4          1.18          2.7 
----------  ----------------  ------------  ------------  ----------- 
 RESOURCES calculated at US$1,500/oz 
 Open pit       Indicated         106.3         1.29          4.4 
           Inferred               63.0          1.19          2.4 
 ---------------------------  ------------  ------------  ----------- 
 

Notes to Mineral Reserve table

1. Canadian Institute of Mining and Metallurgy and Petroleum ("CIM") definitions were used for Mineral Reserves

2. The Mineral Reserve was estimated by the contents of a resource block model within a pit design. This design was based on an optimisation, in which only indicated Resources were enabled. The optimised shell selected corresponded to a gold price of US$975/oz.

3. The Mineral Reserve is reported at a cut-off grade of 0.33 g/t Au. This cut-off has been derived from the breakeven level corresponding to a gold price of US$1,250/oz.

4. A mining loss factor of 10% has been applied. Dilution has already been applied in the generation of bulk mining blocks in the resource model, measuring 12.5m x 12.5m x 10m.

5. The Mineral Reserves were estimated based on the NI 43-101 Mineral Resources, both effective as of 5 January 2015.

   6.     A 90.1% metallurgical gold recovery was used. 

Notes to Mineral Resource table

1. The effective date of the Yaoure Mineral Resource estimate is 5 January 2015, prepared by Mario E Rossi, GeoSystems International, Inc. Pit optimisation work for this was completed by A. Wheeler.

2. The gold price used in the Mineral Resource estimate is US$1,500 per ounce, assuming an open pit mining scenario, processing via tank leaching. Pit slopes are 44 in oxide, 53 in sulphide. Recoveries have been assumed at 90%.

3. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.

4. There are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, and political or other relevant issues that may materially affect the resource estimates.

5. Totals and average grades are subject to rounding to the appropriate precision and some columns or rows may not compute exactly as shown.

6. The stated resources include dilution in the block model that relates to the level of low selectivity envisioned in an open pit operation, assuming 10m bench heights.

Pre-Feasibility Study Delivered

Amara completed a PFS for Yaoure in Q2 2015, which delivered large scale production at low operating costs[i]. It is one of the few development projects in West Africa that has the potential to deliver production of over 200,000 ounces over a 10 year life of mine. The Group also demonstrated further upside at Yaoure in a scenario based on PFS parameters, but including Inferred Mineral Resources, named the Measured, Indicated and Inferred scenario ("MII scenario"). Importantly, the key metrics of the MII Scenario are largely in line with the compelling Preliminary Economic Assessment ("PEA") that was delivered in March 2014.

Key Parameters of PFS and MII Scenario

 
 Parameters                       Unit         PFS    MII Scenario  PEA 6.5Mtpa 
                                                                      Scenario 
---------------------------  -------------  --------  ------------  ----------- 
 Mining 
---------------------------  -------------  --------  ------------  ----------- 
 Ore mined                         Mt         70.4        66.6         63.9 
---------------------------  -------------  --------  ------------  ----------- 
 Waste mined                       Mt         318.2      220.6         314.0 
---------------------------  -------------  --------  ------------  ----------- 
 Strip ratio                   waste:ore      4.5:1      3.3:1         4.9:1 
---------------------------  -------------  --------  ------------  ----------- 
 Contained gold                   koz         2,663      2,766         3,140 
---------------------------  -------------  --------  ------------  ----------- 
 Open pit mine life              years         11          10           10 
---------------------------  -------------  --------  ------------  ----------- 
 Processing 
---------------------------  -------------  --------  ------------  ----------- 
 Processing plant 
  capacity                        Mtpa         6.5        6.5           6.5 
---------------------------  -------------  --------  ------------  ----------- 
 Average head grade 
  processed in years 
  1-4                             g/t         1.56        1.74         1.45 
---------------------------  -------------  --------  ------------  ----------- 
 Average head grade 
  processed                       g/t         1.18        1.29         1.53 
---------------------------  -------------  --------  ------------  ----------- 
 Average gold recovery 
  rate                             %          90.1        90.2         95.2 
---------------------------  -------------  --------  ------------  ----------- 
 Average annual production 
  over life of mine              ounces      218,000    247,000       279,000 
---------------------------  -------------  --------  ------------  ----------- 
 Average annual production 
  in years 1-4                   ounces      291,000    323,000       258,000 
---------------------------  -------------  --------  ------------  ----------- 
 Capital costs 
---------------------------  -------------  --------  ------------  ----------- 
 Plant and infrastructure 
  capital cost                US$ million      254        254           244 
---------------------------  -------------  --------  ------------  ----------- 
 Mining fleet                 US$ million      107        107           75 
---------------------------  -------------  --------  ------------  ----------- 
 Pre-stripping                US$ million      33          33            - 
---------------------------  -------------  --------  ------------  ----------- 
 Contingency                  US$ million      53          53           38 
---------------------------  -------------  --------  ------------  ----------- 
 Total pre-production 
  capital cost                US$ million      447        447           357 
---------------------------  -------------  --------  ------------  ----------- 
 Total capital payback 
  period                         years         3.0        2.3           2.6 
---------------------------  -------------  --------  ------------  ----------- 
 Operating costs 
---------------------------  -------------  --------  ------------  ----------- 
 Total cash costs 
  (including royalties)          US$/oz        739        608           594 
---------------------------  -------------  --------  ------------  ----------- 
 All-in sustaining 
  costs                          US$/oz        782        648           624 
---------------------------  -------------  --------  ------------  ----------- 
 

Yaoure's location is highly advantageous for developing a large-scale gold mine due to its access to low-cost grid power and abundant water. It is situated 40km from a dual carriageway linking the political capital of Yamoussoukro with the commercial capital of Abidjan. As a brownfield site, Yaoure is low risk as there is no requirement to relocate any dwellings, which is a significant advantage compared to many of the project's peers.

Optimisation Opportunities

Following the PFS, a number of optimisation opportunities have been identified and are being assessed with the objective of increasing the overall head grade and reducing the upfront capital cost, which are as follows:

-- Utilising a selective mining approach for the CMA zone - together with bulk mining for the Yaoure Central zone, this would increase the overall grade going to the plant as the impact of dilution would be reduced

-- Utilising a smaller processing plant - the higher grade and therefore smaller volumes of ore from the CMA zone would reduce the overall throughput of the processing plant and lower the upfront capital cost, potentially delivering a stronger internal rate of return

-- Employing staged development - this would deliver a reduced upfront capital requirement, which may be more palatable for a company of Amara's size given the current challenging market conditions

-- Removing the need for pre-stripping and the associated capital cost by commencing mining in the Yaoure Central zone - pit floor mapping, historic rip line data and reverse circulation ("RC") drilling indicate that it may be possible to commence mining in a higher grade pod of ore at surface in the Yaoure Central zone rather than commencing mining in the CMA zone. Part of the current drilling campaign is aimed at better defining this higher grade ore at surface in the Yaoure Central zone

-- Reducing the mining fleet - through reviewing the mining schedule and reducing the pre-strip, together with the selective mining approach, it may be possible to decrease the upfront capital requirements for the mining fleet

Next Steps

Exploration at Yaoure

In conjunction with progressing the optimisation opportunities, a 12,000 metre drilling campaign commenced in April 2015 in the Yaoure Central zone. The programme has two key objectives:

-- To upgrade a portion of the remaining Inferred ounces to the higher confidence Indicated category, which is expected to allow Amara to deliver a BFS in-line with the original PEA

-- To increase continuity within the higher grade areas to strengthen the economics of the Mineral Reserve within the Yaoure Central zone and confirm the potential to commence mining in this area, supported by the historic RC drilling and rip line data

Following this drilling programme, Amara will report a Mineral Resource update in Q4 2015.

In terms of the wider exploration licence area, Amara has embarked on a regional target generation programme, initially utilising geophysics and soil geochemistry. The Yaoure resource area is contained in only a small portion of Amara's total exploration licences and soil geochemistry and structural mapping have identified other areas similar to the resource area. Through further geological mapping, trenching and soil sampling, Amara intends to identify drilling targets with the potential to deliver satellite deposits for Yaoure.

Environmental licence and exploitation licence

Amara's Ivorian subsidiary, Amara Mining Côte d'Ivoire SARL ("AMCDI") submitted its application for an exploitation (mining) licence to the government of Côte d'Ivoire in early August 2015, which included an ESIA for Yaoure. The Group expects to receive both its environmental licence and its mining licence by the end of H1 2016.

New licence area obtained

The Department of Mines and Geology within the government of Côte d'Ivoire has granted Amara a new 206km(2) exploration licence area to the east of the current Yaoure licence area. Amara believes that Côte d'Ivoire is one of the most prospective countries in West Africa and significant exploration upside potential exists as Côte d'Ivoire is largely under-explored.

BAOMAHUN GOLD PROJECT, SIERRA LEONE

Baomahun is a feasibility stage, Archean-age gold project in central Sierra Leone, with a high grade core and grades that strengthen at depth. With 1.21 million ounces of Probable Reserves (23.27Mt at 1.62g/t) and Mineral Resources of 2.24 million Indicated ounces (38.4Mt at 1.81g/t) and 0.54 million Inferred ounces (6.6Mt at 2.2g/t), it forms a second strong growth opportunity for Amara.

Baomahun Mineral Reserves and Mineral Resources, both as of 19 November 2012

 
                Classification    Tonnes (Mt)   Grade (g/t)   Gold (Moz) 
-------------  ----------------  ------------  ------------  ----------- 
 RESERVES 
 Open Pit          Probable          23.27         1.62          1.21 
-------------  ----------------  ------------  ------------  ----------- 
 RESOURCES 
 Open Pit          Indicated         34.9          1.62          1.82 
            Inferred                  3.4          1.15          0.12 
 Underground       Indicated          3.5          3.80          0.43 
            Inferred                  3.2          3.95          0.41 
 Total             Indicated         38.4          1.81          2.24 
            Inferred                  6.6          2.52          0.54 
 ------------------------------  ------------  ------------  ----------- 
 

Notes to Mineral Resources and Reserves

   1.     CIM definitions were used for Mineral Resources and Mineral Reserves 
   2.     Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability 

3. A cut-off grade of 0.5g/t was applied within a US$1,500/oz open pit shell and a 2.0g/t cut-off for Mineral Resources suitable for underground mining. The resources suitable for underground mining are not included in the FS. The Mineral Reserve is reported at a cut-off grade of 0.5 g/t Au at a gold price of US$1,100/oz

4. The Mineral Resource is inclusive of the Mineral Reserve. The Mineral Reserve was estimated by construction of a block model within constraining wireframes and based on Indicated Resources

   5.     Mining dilution of 5% was added to the Mineral Reserve 

6. The Mineral Reserves were estimated based on the NI 43-101 Mineral Resources, both effective as of 19 November 2012

   7.     A 93.4% metallurgical gold recovery was used for the Mineral Reserve 
   8.     Due to rounding, some columns or rows may not add up exactly to the computed totals 

The Feasibility Study ("FS"), which was completed in Q2 2013, demonstrated that the project is robust and economically viable at a gold price of US$1,350 per ounce[ii]. Amara is now focused on gaining a better understanding of the project with the aim of delivering similar strong returns in the current lower gold price environment.

Once Sierra Leone is declared Ebola free by the World Health Organisation and the Sierra Leone government, the focus of Amara's efforts at Baomahun will be to gain a greater understanding of the high grade core of the deposit and to evaluate the potential to grow the 2.8Moz Mineral Resource. The first step towards achieving these objectives will be to re-log the core, ensuring a thorough geological understanding has been gained from the extensive drilling completed to date.

In addition, Amara will gain a more thorough understanding of Baomahun's underground opportunity by evaluating the optimal place in the ore body to transition between open pit and underground mining and the most optimal underground mining strategy.

FINANCIAL REPORT

In January 2015 Amara successfully raised US$22 million (US$21 million net of costs) via a placing to fund the next phase of Yaoure's development. At 30 June 2015 the Group had cash resources of US$13.6 million having invested US$5.2 million in the ongoing exploration and Feasibility Study work at Yaoure.

Amara continues to focus on cash conservation to ensure funds are utilised for the advancement of the Yaoure Gold Project. In H1 2015 administrative expenses in London decreased by 42% to US$2.1 million (net of US$0.4 million of foreign exchange gains) from US$3.6 million in the comparative period in 2014, reflecting the simplification of the Group, including a reduction in staff numbers. Other operating costs on the face of the income statement have increased as costs associated with the operations in Sierra Leone are not being capitalised whilst work in country remains on hold due to the Ebola outbreak. Other operating costs include US$0.5 million of one-off costs incurred in the period, including the write down of obsolete inventories in Côte d'Ivoire and payment of historic taxes in Sierra Leone.

The operations in Burkina Faso are nearing closure. The liquidation of Amara's local subsidiary, Seguénéga Mining SA ("SMSA"), the sale of the Kalsaka processing plant, together with other marketable assets, and the primary environmental closure obligations are expected to be completed during 2015. One-off legal and other costs totalling US$0.3 million were incurred by the Group in the period, with all other costs being met from cash generated in country. The assets have been written down to the expected recoverable amount at the period end. At present, it is not expected that any surplus cash will be generated for repayment to Amara Mining plc and, as such, a provision of US$2.3 million is included within the liabilities of the disposal group held for sale. BCM, the former mining contractor at Sega, continues to pursue Amara Mining plc in Burkina Faso to be held jointly and severally liable for the debts of SMSA, although no hearings have taken place in respect of this litigation and nothing is expected until Q4 2015. The Directors of Amara remain confident that the claims by BCM against Amara are highly unlikely to succeed or have any recourse to Amara.

Longer term, the IFC has proposed a strategic investment in Amara of US$10 million, as announced on 20 April 2015, although given the current share price weakness this has not yet completed. Subject to its completion, Amara will be fully funded to the end of 2016, including the delivery of a BFS. These funds would also allow the Group time to further its discussions with banks and other financial institutions for the financing of Yaoure to the production stage.

AMARA MINING plc

CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

For the six months ended 30 June 2015 and 2014

 
                                                    6 months   6 months 
                                                       ended      ended 
                                                     30 June    30 June 
                                                        2015       2014 
                                            Notes    US$'000    US$'000 
                                                   Unaudited  Unaudited 
Continuing operations 
General and administrative expenses                  (2,080)    (3,554) 
Other operating costs                                (1,338)      (441) 
 
Operating loss                                       (3,418)    (3,995) 
 
Finance income                                           599        549 
Finance costs                                              -      (449) 
 
Loss before taxation                                 (2,819)    (3,895) 
                                                   ---------  --------- 
Income tax expense                                         -          - 
                                                   ---------  --------- 
Loss for the period from continuing 
 operations                                          (2,819)    (3,895) 
                                                   ---------  --------- 
 
Discontinued operations 
Loss for the period from discontinued 
 operations                                   7        (283)    (7,618) 
 
Total comprehensive income for the period            (3,102)   (11,513) 
 
 
Attributable to: 
Equity holders of the parent company 
 
    Loss for the period from continuing 
     operations                                      (2,809)    (3,895) 
    Loss for the period from discontinued 
     operations                                        (247)    (6,168) 
                                                   ---------  --------- 
    Loss for the period attributable to 
     owners of the parent                            (3,056)   (10,063) 
                                                   ---------  --------- 
 
Non-controlling interests 
 
    Loss for the period from continuing 
     operations                                         (10)          - 
    Loss for the period from discontinued 
     operations                                         (36)    (1,450) 
                                                   ---------  --------- 
    Loss for the period attributable to 
     non-controlling interests                          (46)    (1,450) 
                                                   ---------  --------- 
 
Loss per share - basic and diluted            3 
 
Loss from continuing operations (cents 
 per share)                                           (0.70)     (1.45) 
Loss from discontinued operations (cents 
 per share)                                           (0.06)     (2.30) 
                                                   ---------  --------- 
Loss (cents per share)                                (0.76)     (3.75) 
 
 

There were no other comprehensive income gains or losses during the periods presented.

AMARA MINING plc

CONDENSED consolidated statement of financial position

As at 30 June 2015 and 31 December 2014

 
 
                                           As at          As at 
                                         30 June    31 December 
                                            2015           2014 
                                Notes    US$'000        US$'000 
                                       Unaudited      Unaudited 
ASSETS 
NON-CURRENT ASSETS 
Intangible assets                 4      132,625        127,417 
Property, plant and equipment     5        5,992          5,927 
 
Total non-current assets                 138,617        133,344 
 
CURRENT ASSETS 
Inventories                                  133            486 
Other receivables                          1,594          1,789 
Cash and cash equivalents                 13,613          1,687 
 
Total current assets                      15,340          3,962 
 
Assets of disposal group 
 held for sale                            11,207         13,506 
 
TOTAL ASSETS                             165,164        150,812 
 
 
CAPITAL AND RESERVES 
Share capital                     6        6,975          5,598 
Share premium                            220,021        200,420 
Merger reserve                            15,107         15,107 
Share option reserve                       4,967          4,721 
Currency translation reserve                 987            987 
Accumulated losses                      (96,040)       (93,109) 
 
TOTAL EQUITY ATTRIBUTABLE 
 TO THE PARENT                           152,017        133,724 
Non-controlling interests                (4,406)        (4,360) 
 
TOTAL EQUITY                             147,611        129,364 
 
 
NON-CURRENT LIABILITIES 
Provisions                                 2,966          3,150 
 
Total non-current liabilities              2,966          3,150 
 
 
CURRENT LIABILITIES 
Trade and other payables                   3,380          4,792 
 
Total current liabilities                  3,380          4,792 
 
Liabilities of disposal 
 group held for sale                      11,207         13,506 
 
 
TOTAL LIABILITIES                         17,553         21,448 
 
 
TOTAL EQUITY AND LIABILITIES             165,164        150,812 
 
 
 

AMARA MINING plc

CONDENSED consolidated statement of changes in equity

For the six months ended 30 June 2015 and 2014 and 31 December 2014

 
                               ATTRIBUTABLE TO EQUITY HOLDERS OF THE PARENT 
                --------------------------------------------------------------------------- 
                                                 Share   Cumulative 
                   Share     Share    Merger    option  translation  Accumulated             Non-controlling     Total 
                 capital   premium   reserve   reserve      reserve       losses  Sub-total        interests    equity 
                 US$'000   US$'000   US$'000   US$'000      US$'000      US$'000    US$'000          US$'000   US$'000 
 
As at 1 
 January 
 2014              3,785   173,242    15,107     4,678          987     (77,941)    119,858          (2,839)   117,019 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
Loss for the 
 period                -         -         -         -            -     (10,063)   (10,063)          (1,450)  (11,513) 
Total 
 comprehensive 
 income for 
 the 
 period                -         -         -         -            -     (10,063)   (10,063)          (1,450)  (11,513) 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 
Issue of 
 ordinary 
 share capital     1,813    29,013         -         -            -            -     30,826                -    30,826 
Share issue 
 costs                 -   (1,835)         -         -            -            -    (1,835)                -   (1,835) 
Share option 
 charge                -         -         -       356            -            -        356                -       356 
Reserve 
 transfer              -         -         -      (61)            -           61          -                -         - 
 
As at 30 June 
 2014              5,598   200,420    15,107     4,973          987     (87,943)    139,142          (4,289)   134,853 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 
Loss for the 
 period                -         -         -         -            -      (5,669)    (5,669)          (2,618)   (8,287) 
Total 
 comprehensive 
 income for 
 the 
 period                -         -         -         -            -      (5,669)    (5,669)          (2,618)   (8,287) 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 
Closure of 
 subsidiary            -         -         -         -            -            -          -            2,547     2,547 
Share option 
 charge                -         -         -       251            -            -        251                -       251 
Reserve 
 transfer              -         -         -     (503)            -          503          -                -         - 
 
As at 31 
 December 
 2014              5,598   200,420    15,107     4,721          987     (93,109)    133,724          (4,360)   129,364 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 
Loss for the 
 period                -         -         -         -            -      (3,056)    (3,056)             (46)   (3,102) 
Total 
 comprehensive 
 income for 
 the 
 period                -         -         -         -            -      (3,056)    (3,056)             (46)   (3,102) 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 
Issue of 
 ordinary 
 share capital     1,377    20,655         -         -            -            -     22,032                -    22,032 
Share issue 
 costs                 -   (1,054)         -         -            -            -    (1,054)                -   (1,054) 
Share option 
 charge                -         -         -       371            -            -        371                -       371 
Reserve 
 transfer              -         -         -     (125)            -          125          -                -         - 
 
As at 30 June 
 2015              6,975   220,021    15,107     4,967          987     (96,040)    152,017          (4,406)   147,611 
--------------  --------  --------  --------  --------  -----------  -----------  ---------  ---------------  -------- 
 

Amara Mining plc

CONDENSED consolidated statement of cash flows

For the six months ended 30 June 2015 and 2014

 
                                                    6 months   6 months 
                                                    ended 30   ended 30 
                                                        June       June 
                                                        2015       2014 
                                                     US$'000    US$'000 
                                                   Unaudited  Unaudited 
Cash flow (used in)/from operating activities 
 
Operating loss for the period from continuing 
 operations                                          (3,418)    (3,995) 
Operating loss for the period from discontinued 
 operations                                            (723)    (7,508) 
 
Depreciation/amortisation                                700     14,695 
Decrease/(increase) in trade and other 
 receivables                                           1,046    (3,169) 
(Decrease)/increase in trade and other 
 payables                                            (2,618)      4,163 
Decrease in inventories                                1,017      3,771 
Decrease in provisions                                 (629)       (78) 
Share option charge                                      371        356 
 
Net cash flows (used in)/from operating 
 activities                                          (4,254)      8,235 
 
 
Income taxes paid                                          -    (1,198) 
                                                   ---------  --------- 
 
Cash flows used in investing activities 
 
Interest receivable                                        4         42 
Interest payable                                           -      (462) 
Purchase of property, plant and equipment              (191)    (1,361) 
Purchase of intangible assets - deferred 
 exploration                                         (5,730)    (6,256) 
 
Net cash flows used in investing activities          (5,917)    (8,037) 
 
Cash flows from financing activities 
 
Proceeds from the issue of share capital              21,994     28,105 
Issue costs                                          (1,054)    (1,836) 
Repayment of borrowings                                    -   (10,002) 
 
Net cash flows from financing activities              20,940     16,267 
 
 
Net increase in cash and cash equivalents             10,769     15,267 
 
Cash and cash equivalents at start of 
 period                                                4,701     11,372 
Exchange gains on cash                                 1,035        537 
 
Cash and cash equivalents at end of 
 period                                               16,505     27,176 
 
 
 
 
Cash and cash equivalents comprise 
Cash at bank                              13,613  27,176 
Cash at bank - disposal group held for 
 sale (note 8)                             2,892       - 
 
Cash and cash equivalents at end of 
 period                                   16,505  27,176 
 
 

Included in cash and cash equivalents is US$2,770,000 (2014: US$3,364,000) in respect of a restricted bank account held for the purposes of the rehabilitation of the Kalsaka mine site in Burkina Faso. This balance forms part of the discontinued operations cash and cash equivalent total disclosed in note 8.

AMARA MINING plc

notes to the interim financial information

For the six months ended 30 June 2015 and 2014

   1.            Basis of preparation 

The condensed interim financial information has been prepared on the basis of the recognition and measurement requirements of International Financial Reporting Standards (IFRS) as adopted by the European Union (EU) and implemented in the UK. The accounting policies, methods of computation and presentation used in the preparation of the interim financial information are the same as those used in the Group's audited financial statements for the year ended 31 December 2014, which this interim consolidated financial information should be read in conjunction with. The financial information has been prepared in accordance with International Accounting Standard 34 - Interim Financial Reporting.

The financial information in this statement does not constitute full statutory accounts within the meaning of Section 434 of the Companies Act 2006. The financial information for the six months ended 30 June 2015 and 30 June 2014 is unaudited, and has not been reviewed by the auditors.

The financial information for the year ended 31 December 2014 has been derived from the Group's audited financial statements for the period as filed with the Registrar of Companies. It does not constitute the financial statements for that period. The auditor's report on the statutory financial statements for the year ended 31 December 2014 was unqualified and did not contain any statement under sections 498 (2) or (3) of the Companies Act 2006.

Going Concern

The Directors regularly review cashflow forecasts to determine whether the Group has sufficient cash reserves to meet future working capital requirements, progress its exploration projects and take advantage of business opportunities that may arise. The Group manages its treasury function to ensure that cash is primarily held in politically stable countries. This minimises the risk of political events preventing the Group from continuing to make payments required for the Group's operations to continue.

Based on subsequent forecast cash flows the Directors are satisfied that the Group has sufficient cash resources to meet its financial obligations, in particularly the exploration and development costs of its projects, as they fall due for the foreseeable future. Accordingly the Directors have concluded that it is appropriate for the unaudited interim financial information to be prepared on a going concern basis.'

   2.            Segmental reporting 

An analysis of the consolidated income statement by operating segment, presented on the same basis as that set out in the 2014 annual report, is set out below. For the purposes of statutory reporting the Kalsaka/Sega reporting segment has been treated as discontinued - see note 7.

 
                               Yaoure    Baomahun    All other      Total 
                                                      segments 
                              US$'000     US$'000      US$'000    US$'000 
 
Six months ended 30 
 June 2015 
Segmental EBITDA                 (30)       (973)      (2,104)    (3,107) 
                            =========  ==========  ===========  ========= 
 
 
Exploration expenditure         5,208           -            -      5,208 
Other capital expenditure         186           -            -        186 
                            ---------  ----------  -----------  --------- 
 
 
Six months ended 30 
 June 2014 
Segmental EBITDA                    -           -      (3,207)    (3,207) 
                            =========  ==========  ===========  ========= 
 
 
Exploration expenditure         4,356         935            -      5,291 
Other capital expenditure          86           2            2         90 
                            ---------  ----------  -----------  --------- 
 
 
 

A reconciliation of segmental EBITDA to the loss before tax reported in the interim financial statements is as follows:

 
                                  6 months  6 months 
                                     ended     ended 
                                   30 June   30 June 
                                      2015      2014 
                                   US$'000   US$'000 
 
EBITDA for reportable 
 segments                          (3,107)   (3,207) 
Depreciation and amortisation         (49)      (64) 
Share based payments                 (371)     (356) 
Net interest received                    3     (531) 
Exchange rate variance               1,014       263 
Inventory write-down                 (309)         - 
Loss on discontinued 
 operations                          (283)   (7,618) 
 
Loss for the period                (3,102)  (11,513) 
 
 
   3.            Loss per share 
 
The calculation of basic          6 months      6 months 
 and diluted loss per ordinary       ended         ended 
 share is based                    30 June       30 June 
 on the following data:               2015          2014 
 

Loss for the purpose of loss per share (net loss for the period attributable

to equity holders of the parent (US$'000))

 
Continuing operations                                              (2,809)        (3,895) 
Discontinued operations                                              (247)        (6,168) 
 
Total loss for the period 
 attributable to equity holders 
 of the parent                                                     (3,056)       (10,063) 
 
Number of shares 
Weighted average number 
 of ordinary shares in issue 
 for the period 
 
   *    Number of shares with voting rights                    401,703,411    268,288,384 
 
   *    Effect of share options in issue                                 -              - 
 
 
   *    Total used in calculation of diluted earnings per 
        share                                                  401,703,411    268,288,384 
 
 
 

None of the share options in issue are dilutive at the current share price.

   4.            Intangible assets 
 
                                                    Deferred 
                                Exploration      exploration 
                                 and mining   and evaluation 
                                     rights            costs    Total 
                                    US$'000          US$'000  US$'000 
  Cost 
  At 1 January 2014                  30,222           87,126  117,348 
  Additions                               -            5,291    5,291 
 
  At 30 June 2014                    30,222           92,417  122,639 
  Additions                               5           12,743   12,748 
  Reclassification to assets 
   held for sale                    (6,033)                -  (6,033) 
 
  At 31 December 2014                24,194          105,160  129,354 
  Additions                               -            5,208    5,208 
 
  At 30 June 2015                    24,194          110,368  134,562 
 
  Amortisation 
  At 1 January 2014                   7,126                -    7,126 
  Charge for the period                 844                -      844 
 
  At 30 June 2014                     7,970                -    7,970 
  Charge for the period                   -                -        - 
  Reclassification to assets 
   held for sale                    (6,033)                -  (6,033) 
 
  At 31 December 2014                 1,937                -    1,937 
  Charge for the period                   -                -        - 
 
  At 30 June 2015                     1,937                -    1,937 
 
  Net book value 
 
  At 30 June 2015                    22,257          110,368  132,625 
 
 
  At 31 December 2014                22,257          105,160  127,417 
 
 
  At 30 June 2014                    22,252           92,417  114,669 
 
 
   5.            Property, plant and equipment 
 
                        Mine development 
                          and associated  Motor vehicles, 
                               property,           office 
                               plant and       equipment, 
                               equipment         fixtures 
                                   costs    and computers     Total 
                                 US$'000          US$'000   US$'000 
 
  Cost 
  At 1 January 2014               98,355            8,108   106,463 
  Additions                        1,308                8     1,316 
 
  At 30 June 2014                 99,663            8,116   107,779 
  Additions                          184               36       220 
  Disposals                     (20,472)            (822)  (21,294) 
  Reclassification 
   to assets held 
   for sale                     (42,429)          (4,782)  (47,211) 
 
  At 31 December 
   2014                           36,946            2,548    39,494 
  Additions                          164               22       186 
 
  At 30 June 2015                 37,110            2,570    39,680 
 
  Depreciation 
  At 1 January 2014               78,520            5,735    84,255 
  Charge for the 
   period                          7,754              448     8,202 
 
  At 30 June 2014                 86,274            6,183    92,457 
  Charge for the 
   period                          2,380              319     2,699 
  Disposals                     (19,276)            (677)  (19,953) 
  Reclassification 
   to assets held 
   for sale                     (38,095)          (3,541)  (41,636) 
 
  At 31 December 
   2014                           31,283            2,284    33,567 
  Charge for the 
   period                             63               58       121 
 
  At 30 June 2015                 31,346            2,342    33,688 
 
  Net book value 
  At 30 June 2015                  5,764              228     5,992 
 
 
  At 31 December 
   2014                            5,663              264     5,927 
 
 
  At 30 June 2014                 13,389            1,933    15,322 
 
   6.            Share capital 
 
                                      As at         As at 
                                    30 June   31 December 
                                       2015          2014 
 
                                        No.           No. 
  Issued and Fully Paid: 
  Ordinary shares of 1p each    420,386,077   328,979,827 
 
 
                                    US$'000       US$'000 
  Issued and Fully Paid: 
  Ordinary shares of 1p each          6,975         5,598 
 
 
 
 

Discontinued operations

In 2014 the company announced the cessation of mining operations at Kalsaka/ Sega in Burkina Faso. Accordingly, the results and cash flows relating to those operations have been presented as discontinued for the current and comparative reporting periods.

Statement of comprehensive income - discontinued operations

 
                                  6 months  6 months 
                                     ended     ended 
                                   30 June   30 June 
                                      2015      2014 
                                   US$'000   US$'000 
 
 
  Revenue                            5,946    47,639 
  Cost of sales                    (2,766)  (51,711) 
 
  Gross profit /(loss)               3,180   (4,072) 
 
  Other operating costs            (3,903)   (3,436) 
 
  Operating loss                     (723)   (7,508) 
 
  Investment income                    440        31 
  Finance costs                          -     (141) 
 
  Loss before taxation               (283)   (7,618) 
 
  Income tax                             -         - 
 
  Loss for the period                (283)   (7,618) 
 
 
  Attributable to: 
  Equity holders of the parent 
   company                           (247)   (6,168) 
  Non-controlling interests           (36)   (1,450) 
 
  Loss and total comprehensive 
   income for the period             (283)   (7,618) 
 
 

Statement of cash flows - discontinued operations

 
                                      6 months  6 months 
                                         ended     ended 
                                       30 June   30 June 
                                          2015      2014 
                                       US$'000   US$'000 
 
 
  Net cash flows (used in)/from 
   operating activities                  (560)     7,538 
  Income taxes paid                          -   (1,198) 
  Net cash flows used in investing 
   activities                              (2)   (1,279) 
  Net cash flows used in financing 
   activities                                -   (7,409) 
 
  Net decrease in cash and cash 
   equivalents                           (562)   (2,348) 
 
  Cash and cash equivalents at 
   start of period                       3,014     5,927 
  Exchange gains/(losses) on 
   cash                                    440     (141) 
  Cash and cash equivalents at 
   end of period                         2,892     3,438 
                                      ========  ======== 
 

Details of restricted bank balances are provided as a footnote on the face of the consolidated statement of cash flows

The Burkinabe subsidiaries that remain in the control of the Company have been presented as a disposal group held for sale following the commitment of the Company's Board, on 4 December 2014, to sell the operations. The subsidiaries held for sale are Kalsaka Mining SA, Cluff Gold Sega Sarl and Cluff Mining Burkina Sarl. Efforts to sell the disposal group have commenced, and a sale is expected within 12 months. The disposal group has been treated as a discontinued operation and included in note 7.

A provision totalling US$2.3m has been made against the net assets of the disposal group due to uncertainty concerning full recovery of some amounts, equally the Company has no requirement to compensate for any shortfall with regard to liabilities, accordingly assets and liabilities are considered to total the same amount.

The disposal group comprised the following assets and liabilities:

 
 Assets of disposal group                As at         As at 
  held for sale                        30 June   31 December 
                                          2015          2014 
                                        US$000        US$000 
 
 Property, plant and equipment           5,000         5,575 
 Inventory                               1,080         1,744 
 Other receivables and recoverable 
  taxes                                  2,235         3,173 
 Cash and cash equivalents               2,892         3,014 
 
                                        11,207        13,506 
 
 Liabilities of disposal 
  group held for sale 
 
 Trade and other payables                8,210        10,063 
 Provisions                              2,997         3,443 
 
                                        11,207        13,506 
 
 

There are no cumulative income or expenses included in other comprehensive income relating to the disposal group.

Included in cash and cash equivalents is US$2,770,000 (2014: US$2,997,000) in respect of a restricted bank account held for the purposes of the rehabilitation of Kalsaka mine site in Burkina Faso.

   7.            Litigation 

Cote d'Ivoire

As disclosed in the financial statements for the year ended 31 December 2014, the Ivorian subsidiaries of the Group have received a claim of US$36.4m for additional costs incurred by the mining contractor on the now closed mining operations at Yaoure.

As permitted under the contract the mining contractor has requested that the dispute be resolved through arbitration before 'la cour d'arbitrage de Cote d'Ivoire' (CACI). As at the date of this report the tribunal format and timetable has been agreed and preliminary hearings on the admissibility and jurisdiction of the claim are due to be held in Q4 2015. As part of the arbitration process a liquidated damages counterclaim has been filed for US$50m in relation to the failure of the contractor to perform as required under the contract.

Whilst the situation remains unresolved, external advice has been received that supports the opinion of the Directors that the current provision of US$1.0m (included in accruals) is appropriate.

Burkina Faso

Following the cessation of mining operations in August 2014 the mining contractor of the Group's subsidiary Seguenega Mining SA initiated preliminary legal proceedings in Burkina Faso and Cote d'Ivoire. The action attempts to claim joint and several liability against Amara Mining plc and its Burkinabe subsidiaries for the debts of Seguenega Mining SA totalling approximately US$18.0m plus damages.

Seguenega Mining SA was placed into liquidation on 9 December 2014. The court appointed liquidator stated the total debt due from Seguenega Mining SA to the contractor at that date was 7.8 billion West African CFA Franc (US$14.1m). During the six months ended 30 June 2015, the liquidator made payments to outstanding creditors including partial payment of the outstanding balance due to the mining contractor. The operations of Seguenega Mining SA, and consequently the liquidation proceedings, are expected to be completed during 2015.

Amara Mining plc has no contractual responsibility for the debts of Seguenega Mining SA and has not provided a parent company guarantee. Amara Mining plc has received detailed legal advice that it is not liable for the debts of its subsidiary and the legal action is considered highly unlikely to succeed or have any recourse.

As the possibility of a transfer of benefits is considered to be remote no provision has been made and it does not meet the definition of a contingent liability in accordance with IAS 37 Provisions, Contingent Liabilities and Contingent Assets.

[i] See press release entitled, 'Pre-Feasibility Study for Yaoure Gold Project confirms robust financial returns', dated 14 May 2015

[ii] See NI 43-101 compliant technical report entitled, 'Feasibility Study of the Baomahun Project in Sierra Leone NI 43-101 Technical Report', dated 28 June 2013

This information is provided by RNS

The company news service from the London Stock Exchange

END

IR UAOVRVRAWAAR

1 Year Amara Chart

1 Year Amara Chart

1 Month Amara Chart

1 Month Amara Chart

Your Recent History

Delayed Upgrade Clock